India Data Center Construction Market Size & Share Analysis - Growth Trends & Forecasts (2025 - 2031)

The India Data Center Construction Market report segments the industry into By Infrastructure (By Electrical Infrastructure, By Mechanical Infrastructure, and more.), By Electrical Infrastructure (Power Distribution Solution, and more.), By Mechanical Infrastructure (Cooling Systems, and more.), By Tier Type (Tier-I and-II, and more.), and By End User (Banking, Financial Services, and Insurance, and more.)

India Data Center Construction Market Size and Share

India Data Center Construction Market Summary
Image © Mordor Intelligence. Reuse requires attribution under CC BY 4.0.

Benchmark India Data Center Construction Against Other Technology, Media and Telecom Markets

India Data Center Construction Market Analysis by Mordor Intelligence

The India Data Center Construction Market size is estimated at USD 9.38 billion in 2025, and is expected to reach USD 35.82 billion by 2031, at a CAGR of 25.03% during the forecast period (2025-2031).

The rising demand for cloud computing, the Internet of Things (IoT), and artificial intelligence (AI) has significantly escalated data generation. Consequently, this surge is fueling the necessity for an increased number of data centers in the market.

  • The upcoming IT load capacity in the region is expected to reach 6000 MW by 2030, which is projected to positively impact the demand for data center racks during the forecast period.
  • The construction of raised floor area for data centers in the region is expected to reach 22.9 million sq. ft by 2030 for under construction raised floor space.
  • The region's total number of racks to be installed is expected to reach 1140k units by 2030. Mumbai is expected to house the maximum number of racks by 2030.
  • Planned Submarine Cables: Close to 19 submarine cable systems are connecting India, and many are under construction. One such submarine cable that is estimated to start service in 2025 is Raman, which stretches over 7,028 kilometers and has landing points from Mumbai, India.
600+
data center reports by Mordor Intelligence
covering AI facilities, cooling, hyperscale sites and more - global, regional or country-level, right down to individual data center components
See more reports  ↓

Competitive Landscape

Market Concentration

India Data Center Construction Market - Market Concentration
Image © Mordor Intelligence. Reuse requires attribution under CC BY 4.0.

The Indian data center construction market is moderately consolidated. The major players in this market hold the majority of the market share. Some of the major players are AECOM, Jacobs, L&T Construction Pvt. Ltd, Turner & Townsend, and KEC International Limited.

In May 2024, Sify Technologies, a prominent data center provider in India, unveiled its ambitious strategy to construct 675 megawatts (MW) of data center capacity within the nation by 2029. Presently, the company is actively developing 250 MW of this capacity, aiming to surpass 350 MW within the next three years.

In July 2023, Reliance partnered with Brookfield Infrastructure to build data center capacity in India with an investment of INR 10 billion (USD 121.70 million). Such investments are driving opportunities for vendors in the market.

India Data Center Construction Industry Leaders

  1. AECOM

  2. Jacobs 

  3. L&T Construction Pvt. Ltd.

  4. Turner & Townsend

  5. KEC International Limited

  6. *Disclaimer: Major Players sorted in no particular order

Recent Industry Developments

  • February 2024: STT GDC began constructing its third data center campus in Chennai, India. This upcoming campus will house two data centers, boasting a 50 MW IT load. The initial phase, with an 8 MW capacity, is set to be operational by September 2025.
  • June 2023: NTT, a colocation provider, and Prestige Group announced a partnership to establish a 100 MW data center campus in Bangalore/Bengaluru, India. Prestige Group, a local property development company, is set to construct three data center buildings spanning 350,000 sq ft (32,500 sqm) for NTT as part of an INR 700 crore (USD 84.8 million) agreement. The first building is slated for completion within the next 12 months. The project will unfold in three phases, culminating in a total gross leasable area of one million sq ft.

Table of Contents for India Data Center Construction Industry Report

1. INTRODUCTION

  • 1.1 Study Assumptions And Market Definition
  • 1.2 Scope of the Study

2. RESEARCH METHODOLOGY

  • 2.1 Research Framework
  • 2.2 Secondary Research
  • 2.3 Primary Research
  • 2.4 Data Triangulation and Insight Generation

3. EXECUTIVE SUMMARY

4. MARKET INSIGHT

  • 4.1 Market Overview
  • 4.2 Market Dynamics
    • 4.2.1 Market Drivers
    • 4.2.1.1 The Rising AI Workforce and Surge in Generative AI Investments Fuel India's Data Center Demand
    • 4.2.1.2 The government's push to implement digital programs has driven the demand for data centers.
    • 4.2.2 Market Restraints
    • 4.2.2.1 High Power Consumption and emission contribution of Data Centers
  • 4.3 Industry Attractiveness - Porter's Five Forces Analysis
    • 4.3.1 Bargaining Power of Suppliers
    • 4.3.2 Bargaining Power of Consumers
    • 4.3.3 Threat of New Entrants
    • 4.3.4 Threat of Substitutes
    • 4.3.5 Intensity of Competitive Rivalry
  • 4.4 Key India Data Center Construction Statistics
    • 4.4.1 Number of Data Centers In the India, 2022 and 2023
    • 4.4.2 Data Center Under Construction in the India, In MW, 2024 - 2029
    • 4.4.3 Average Capex and Opex For the India Data Center Construction
    • 4.4.4 Data Center Power Capacity Absorption In MW, Selected Cities, India, 2022 and 2023
    • 4.4.5 The top CAPEX spenders on Data center infrastructure in the India.

5. MARKET SEGMENTATION

  • 5.1 Market Segmentation - By Infrastructure
    • 5.1.1 Market Segmentation - By Electrical Infrastructure
    • 5.1.1.1 Power Distribution Solution
    • 5.1.1.1.1 PDU - Basic & Smart - Metered & Switched solutions
    • 5.1.1.1.2 Transfer Switches
    • 5.1.1.1.2.1 Static
    • 5.1.1.1.2.2 Automatic (ATS)
    • 5.1.1.1.3 Switchgear
    • 5.1.1.1.3.1 Low-Voltage
    • 5.1.1.1.3.2 Medium-Voltage
    • 5.1.1.1.4 Power Panels and Components
    • 5.1.1.1.5 Others
    • 5.1.1.2 Power Back up Solutions
    • 5.1.1.2.1 UPS
    • 5.1.1.2.2 Generators
    • 5.1.1.3 Service - Design & Consulting, Integration, Support & Maintenance
    • 5.1.2 Market Segmentation - By Mechanical Infrastructure
    • 5.1.2.1 Cooling Systems
    • 5.1.2.1.1 Immersion Cooling
    • 5.1.2.1.2 Direct-To-Chip Cooling
    • 5.1.2.1.3 Rear Door Heat Exchanger
    • 5.1.2.1.4 In-Row and In-Rack Cooling
    • 5.1.2.2 Racks
    • 5.1.2.3 Other Mechanical Infrastructure
    • 5.1.3 General Construction
  • 5.2 Market Segmentation - By Tier Type
    • 5.2.1 Tier-I and-II
    • 5.2.2 Tier-III
    • 5.2.3 Tier-IV
  • 5.3 Market Segmentation - By End User
    • 5.3.1 Banking, Financial Services, and Insurance
    • 5.3.2 IT and Telecommunications
    • 5.3.3 Government and Defense
    • 5.3.4 Healthcare
    • 5.3.5 Other End Users

6. COMPETITIVE LANDSCAPE

  • 6.1 Company Profiles
    • 6.1.1 AECOM
    • 6.1.2 Jacobs
    • 6.1.3 L&T Construction Pvt. Ltd
    • 6.1.4 Turner & Townsend
    • 6.1.5 KEC International Limited
    • 6.1.6 Ahluwalia Contracts (India)
    • 6.1.7 Hiranandani Group
    • 6.1.8 Prestige Group
    • 6.1.9 Brookfield India Real Estate Trust
    • 6.1.10 Sterling and Wilson
  • *List Not Exhaustive

7. INVESTMENTS ANALYSIS

8. MARKET OPPORTUNITIES AND FUTURE TRENDS

9. ABOUT US

  • 9.1 Industries Covered
  • 9.2 Illustrative List of Clients in the Industry
  • 9.3 Our Customized Research Capabilities
**Subject to Availability

India Data Center Construction Market Report Scope

The data center construction combines physical processes to construct a data center facility. It chains construction standards with data center operational environment requirements.

The Indian Data Center Construction Market is Segmented (by Infrastructure (Electrical Infrastructure (Power Distribution Solution(PDU, Transfer Switches, Switchgear, Power Panels and Components, Others)), Power Back-Up Solution (UPS, Generators), Service – Design & Consulting, Integration, Support & Maintenance)), (mechanical Infrastructure (Cooling Systems (Immersion Cooling, Direct-To-Chip Cooling, Rear Door Heat Exchanger, In-Row and In-Rack Cooling)), Racks, Other Mechanical Infrastructure)), General Construction)), by Tier Type (Tier 1 and 2, Tier 3, and Tier 4) and by End User (Banking, Financial Services and Insurance, IT and Telecommunications, Government and Defense, Healthcare, and Other End Users). The market sizes and forecasts are provided in USD values for all the above segments.

Market Segmentation - By Infrastructure
India Data Center Construction Market segmentation breakdown
Market Segmentation - By Electrical Infrastructure Power Distribution Solution PDU - Basic & Smart - Metered & Switched solutions
Transfer Switches Static
Automatic (ATS)
Switchgear Low-Voltage
Medium-Voltage
Power Panels and Components
Others
Power Back up Solutions UPS
Generators
Service - Design & Consulting, Integration, Support & Maintenance
Market Segmentation - By Mechanical Infrastructure Cooling Systems Immersion Cooling
Direct-To-Chip Cooling
Rear Door Heat Exchanger
In-Row and In-Rack Cooling
Racks
Other Mechanical Infrastructure
General Construction
Market Segmentation - By Tier Type
India Data Center Construction Market segmentation breakdown
Tier-I and-II
Tier-III
Tier-IV
Market Segmentation - By End User
India Data Center Construction Market segmentation breakdown
Banking, Financial Services, and Insurance
IT and Telecommunications
Government and Defense
Healthcare
Other End Users
India Data Center Construction Market segmentation breakdown
Market Segmentation - By Infrastructure Market Segmentation - By Electrical Infrastructure Power Distribution Solution PDU - Basic & Smart - Metered & Switched solutions
Transfer Switches Static
Automatic (ATS)
Switchgear Low-Voltage
Medium-Voltage
Power Panels and Components
Others
Power Back up Solutions UPS
Generators
Service - Design & Consulting, Integration, Support & Maintenance
Market Segmentation - By Mechanical Infrastructure Cooling Systems Immersion Cooling
Direct-To-Chip Cooling
Rear Door Heat Exchanger
In-Row and In-Rack Cooling
Racks
Other Mechanical Infrastructure
General Construction
Market Segmentation - By Tier Type Tier-I and-II
Tier-III
Tier-IV
Market Segmentation - By End User Banking, Financial Services, and Insurance
IT and Telecommunications
Government and Defense
Healthcare
Other End Users

Key Questions Answered in the Report

How big is the India Data Center Construction Market?

The India Data Center Construction Market size is expected to reach USD 9.38 billion in 2025 and grow at a CAGR of 25.03% to reach USD 35.82 billion by 2031.

What is the current India Data Center Construction Market size?

In 2025, the India Data Center Construction Market size is expected to reach USD 9.38 billion.

Who are the key players in India Data Center Construction Market?

AECOM, Jacobs, L&T Construction Pvt. Ltd., Turner & Townsend and KEC International Limited are the major companies operating in the India Data Center Construction Market.

What years does this India Data Center Construction Market cover, and what was the market size in 2024?

In 2024, the India Data Center Construction Market size was estimated at USD 7.03 billion. The report covers the India Data Center Construction Market historical market size for years: 2019, 2020, 2021, 2022, 2023 and 2024. The report also forecasts the India Data Center Construction Market size for years: 2025, 2026, 2027, 2028, 2029, 2030 and 2031.

Page last updated on:

India Data Center Construction Market Report

Statistics for the 2025 India Data Center Construction market share, size and revenue growth rate, created by Mordor Intelligence™ Industry Reports. India Data Center Construction analysis includes a market forecast outlook for 2025 to 2031 and historical overview. Get a sample of this industry analysis as a free report PDF download.

More reports on data centers