Philippines Data Center Construction Market Size & Share Analysis - Growth Trends and Forecast (2025 - 2031)

The Philippines Data Center Construction Market Report Segments the Industry Into Infrastructure (Electrical Infrastructure, Mechanical Infrastructure, General Construction), Electrical Infrastructure, Mechanical Infrastructure, Tier Type (Tier I and II, and More. ), and End User (Banking, Financial Services, and Insurance, and More. )

Philippines Data Center Construction Market Size and Share

Philippines Data Center Construction Market Summary
Image © Mordor Intelligence. Reuse requires attribution under CC BY 4.0.

Benchmark Philippines Data Center Construction Against Other Technology, Media and Telecom Markets

Philippines Data Center Construction Market Analysis by Mordor Intelligence

The Philippines Data Center Construction Market size is estimated at USD 2.18 billion in 2025, and is expected to reach USD 5.01 billion by 2031, at a CAGR of 14.85% during the forecast period (2025-2031).

Investments in data centers in the Philippines are being propelled by the rise of 5G, increased adoption of renewable energy, and enhanced digitalization, especially with the deployment of submarine cables and fiber connectivity.

  • Under Construction IT Load Capacity: The upcoming IT load capacity of the Philippine data center construction market is expected to reach 1,014 MW by 2030.
  • Under Construction Raised Floor Space: The country's construction of raised floor area is expected to increase by 3.6 million sq. ft by 2030.
  • Planned Racks: The country's total number of racks to be installed is expected to reach 181,000 units by 2030.
  • Planned Submarine Cables: There are close to 11 submarine cable systems connecting the Philippines, and many are under construction. One such submarine cable that is estimated to start service in 2025 is Asia Link Cable (ALC), which stretches over 6,000 km with landing points from Bauang to the Philippines.
600+
data center reports by Mordor Intelligence
covering power, AI facilities, hyperscale sites and more - global, regional or country-level, right down to individual data center components
See more reports  ↓

Competitive Landscape

Market Concentration

Philippines Data Center Construction Market Concentration
Image © Mordor Intelligence. Reuse requires attribution under CC BY 4.0.

The Philippine data center construction market is consolidated, with significant players operating, such as Aecom Philippines Inc., Jacobs Project Philippines Inc., Turner & Townsend, Arup, and Aurecon Group Pty Ltd.

  • In June 2024, plans were announced to be underway for a 300 MW data center campus in the Philippines. The project is set to unfold in three 100 MW phases. The Philippines News Agency, among others, reported that Endec Group, a construction and engineering firm based in Manila, in collaboration with Narra Technology Park Development Inc., had inked a lease agreement for a 47-hectare plot within the New Clark City (NCC).
  • In November 2023, ST Telemedia Global Data Centres (STT GDC) awarded a contract to deliver the first phase of the STT Fairview 1 data center development in Quezon City, Philippines. The contract was given to Sydney-based CIMIC Group’s subsidiary, Leighton Asia, and the Philippine-based engineering and construction company First Balfour. The STT Fairview data center campus, upon completion, is set to span 83,000 sq. m across four buildings, with a projected IT load capacity of 124 MW.

Philippines Data Center Construction Industry Leaders

  1. Aecom Philippines, Inc.

  2. Jacobs Project Philippines Inc.

  3. Turner & Townsend

  4. Arup

  5. Aurecon Group Pty. Ltd.

  6. *Disclaimer: Major Players sorted in no particular order

Recent Industry Developments

  • July 2024: Vitro, a subsidiary of ePLDT and the data center arm of telco PLDT Inc., completed construction on its data center in Santa Rosa, located in the Laguna province of the Philippines. This 50 MW facility marked the country's pioneering hyperscale data center. Initially, Vitro plans to activate 10 MW, with the capacity set to scale up to 36 MW, spanning over 13,000 sq. m (139,931 sq. ft) of white space. The data center is slated to commence operations imminently.
  • March 2024: Aboitiz InfraCapital Inc. (AIC) announced that it aims to commence construction on a data center in the near future, following up on a partnership established with US-based technology firm EdgeConneX (ECX) just under two years ago. The firms are currently in the process of determining the center's location and data capacity. The center is specifically tailored to support essential servers and IT networks.

Table of Contents for Philippines Data Center Construction Industry Report

1. INTRODUCTION

  • 1.1 Study Assumptions and Market Definition
  • 1.2 Scope of the Study

2. RESEARCH METHODOLOGY

  • 2.1 Research Framework
  • 2.2 Secondary Research
  • 2.3 Primary Research
  • 2.4 Data Triangulation and Insight Generation

3. EXECUTIVE SUMMARY

4. MARKET INSIGHT

  • 4.1 Market Overview
  • 4.2 Market Dynamics
    • 4.2.1 Market Drivers
    • 4.2.1.1 The Philippine Market is Witnessing a Surge in Data Center Demand, Propelled by Rising Investments in Cloud Technologies, Bolstered by the Widespread Embrace of AI
    • 4.2.1.2 The Philippine Government's Digital Initiatives have Fueled a Surge in the Demand for Data Centers
    • 4.2.2 Market Restraints
    • 4.2.2.1 High Power Consumption and Emission Contributions of Data Centers
  • 4.3 Industry Attractiveness - Porter's Five Forces Analysis
    • 4.3.1 Bargaining Power of Suppliers
    • 4.3.2 Bargaining Power of Consumers
    • 4.3.3 Threat of New Entrants
    • 4.3.4 Threat of Substitutes
    • 4.3.5 Intensity of Competitive Rivalry
  • 4.4 Key Philippine Data Center Construction Statistics
    • 4.4.1 Number of Data Centers in the Philippines, 2022 and 2023
    • 4.4.2 Data Centers Under Construction in the Philippines, in MW, 2024-2029
    • 4.4.3 Average CAPEX and OPEX for the Philippine Data Center Construction Market
    • 4.4.4 Data Center Power Capacity Absorption in MW, Selected Cities, Philippines, 2022 and 2023
    • 4.4.5 Top CAPEX Spenders on Data Center Infrastructure in the Philippines

5. MARKET SEGMENTATION

  • 5.1 Market Segmentation - by Infrastructure
    • 5.1.1 Market Segmentation - by Electrical Infrastructure
    • 5.1.1.1 Power Distribution Solution
    • 5.1.1.1.1 PDU - Basic and Smart - Metered and Switched Solutions
    • 5.1.1.1.2 Transfer Switches
    • 5.1.1.1.2.1 Static
    • 5.1.1.1.2.2 Automatic (ATS)
    • 5.1.1.1.3 Switchgear
    • 5.1.1.1.3.1 Low-voltage
    • 5.1.1.1.3.2 Medium-voltage
    • 5.1.1.1.4 Power Panels and Components
    • 5.1.1.1.5 Other Power Distribution Solutions
    • 5.1.1.2 Power Back-up Solutions
    • 5.1.1.2.1 UPS
    • 5.1.1.2.2 Generators
    • 5.1.1.3 Service - Design and Consulting, Integration, Support and Maintenance
    • 5.1.2 Market Segmentation - By Mechanical Infrastructure
    • 5.1.2.1 Cooling Systems
    • 5.1.2.1.1 Immersion Cooling
    • 5.1.2.1.2 Direct-to-Chip Cooling
    • 5.1.2.1.3 Rear Door Heat Exchanger
    • 5.1.2.1.4 In-row and In-rack Cooling
    • 5.1.2.2 Racks
    • 5.1.2.3 Other Mechanical Infrastructure
    • 5.1.3 General Construction
  • 5.2 Market Segmentation - By Tier Type
    • 5.2.1 Tier I and II
    • 5.2.2 Tier III
    • 5.2.3 Tier IV
  • 5.3 Market Segmentation - By End User
    • 5.3.1 Banking, Financial Services, and Insurance
    • 5.3.2 IT and Telecommunications
    • 5.3.3 Government and Defense
    • 5.3.4 Healthcare
    • 5.3.5 Other End Users

6. COMPETITIVE LANDSCAPE

  • 6.1 Company Profiles
    • 6.1.1 AECOM Philippines Inc.
    • 6.1.2 Jacobs Project Philippines Inc.
    • 6.1.3 Turner & Townsend
    • 6.1.4 Arup
    • 6.1.5 Aurecon Group Pty. Ltd
    • 6.1.6 Endec Group
    • 6.1.7 Rider Levett Bucknall Philippines Inc.
    • 6.1.8 First Balfour Inc.
    • 6.1.9 MDBI Construction Corporation (MDBI)
    • 6.1.10 Santos Knight Frank (SKF)
  • *List Not Exhaustive

7. INVESTMENTS ANALYSIS

8. MARKET OPPORTUNITIES AND FUTURE TRENDS

9. ABOUT US

  • 9.1 Industries Covered
  • 9.2 Illustrative List of Clients in the Industry
  • 9.3 Our Customized Research Capabilities
**Subject to Availability

Philippines Data Center Construction Market Report Scope

Data center construction combines the physical processes used to construct a data center facility. It chains construction standards with data center operational environment requirements.

The Philippine data center construction market is segmented by infrastructure (electrical infrastructure (power distribution solutions (PDU, transfer switches, switchgear, power panels and components, and other power distribution solutions), power back-up solutions (UPS and generators), and service – design and consulting, integration, support and maintenance), mechanical infrastructure (cooling systems (immersion cooling, direct-to-chip cooling, rear door heat exchanger, and in-row and in-rack cooling), racks, and other mechanical infrastructure), and general construction), tier type (tier I and II, tier III, and tier IV), and end user (banking, financial services and insurance, IT and telecommunications, government and defense, healthcare, and other end users).

Market Segmentation - by Infrastructure
Philippines Data Center Construction Market segmentation breakdown
Market Segmentation - by Electrical Infrastructure Power Distribution Solution PDU - Basic and Smart - Metered and Switched Solutions
Transfer Switches Static
Automatic (ATS)
Switchgear Low-voltage
Medium-voltage
Power Panels and Components
Other Power Distribution Solutions
Power Back-up Solutions UPS
Generators
Service - Design and Consulting, Integration, Support and Maintenance
Market Segmentation - By Mechanical Infrastructure Cooling Systems Immersion Cooling
Direct-to-Chip Cooling
Rear Door Heat Exchanger
In-row and In-rack Cooling
Racks
Other Mechanical Infrastructure
General Construction
Market Segmentation - By Tier Type
Philippines Data Center Construction Market segmentation breakdown
Tier I and II
Tier III
Tier IV
Market Segmentation - By End User
Philippines Data Center Construction Market segmentation breakdown
Banking, Financial Services, and Insurance
IT and Telecommunications
Government and Defense
Healthcare
Other End Users
Philippines Data Center Construction Market segmentation breakdown
Market Segmentation - by Infrastructure Market Segmentation - by Electrical Infrastructure Power Distribution Solution PDU - Basic and Smart - Metered and Switched Solutions
Transfer Switches Static
Automatic (ATS)
Switchgear Low-voltage
Medium-voltage
Power Panels and Components
Other Power Distribution Solutions
Power Back-up Solutions UPS
Generators
Service - Design and Consulting, Integration, Support and Maintenance
Market Segmentation - By Mechanical Infrastructure Cooling Systems Immersion Cooling
Direct-to-Chip Cooling
Rear Door Heat Exchanger
In-row and In-rack Cooling
Racks
Other Mechanical Infrastructure
General Construction
Market Segmentation - By Tier Type Tier I and II
Tier III
Tier IV
Market Segmentation - By End User Banking, Financial Services, and Insurance
IT and Telecommunications
Government and Defense
Healthcare
Other End Users

Key Questions Answered in the Report

How big is the Philippines Data Center Construction Market?

The Philippines Data Center Construction Market size is expected to reach USD 2.18 billion in 2025 and grow at a CAGR of 14.85% to reach USD 5.01 billion by 2031.

What is the current Philippines Data Center Construction Market size?

In 2025, the Philippines Data Center Construction Market size is expected to reach USD 2.18 billion.

Who are the key players in Philippines Data Center Construction Market?

Aecom Philippines, Inc., Jacobs Project Philippines Inc., Turner & Townsend, Arup and Aurecon Group Pty. Ltd. are the major companies operating in the Philippines Data Center Construction Market.

What years does this Philippines Data Center Construction Market cover, and what was the market size in 2024?

In 2024, the Philippines Data Center Construction Market size was estimated at USD 1.86 billion. The report covers the Philippines Data Center Construction Market historical market size for years: 2019, 2020, 2021, 2022, 2023 and 2024. The report also forecasts the Philippines Data Center Construction Market size for years: 2025, 2026, 2027, 2028, 2029, 2030 and 2031.

Page last updated on:

Philippines Data Center Construction Market Report

Statistics for the 2025 Philippines Data Center Construction market share, size and revenue growth rate, created by Mordor Intelligence™ Industry Reports. Philippines Data Center Construction analysis includes a market forecast outlook for 2025 to 2031 and historical overview. Get a sample of this industry analysis as a free report PDF download.