Israel Data Center Construction Market Size & Share Analysis - Growth Trends & Forecasts (2025 - 2031)

The Israel Data Center Construction Market report segments the industry into By Infrastructure (By Electrical Infrastructure, By Mechanical Infrastructure, and more), By Electrical Infrastructure (Power Distribution Solution, and more), By Mechanical Infrastructure (Cooling Systems, and more), By Tier Type (Tier 1 and 2, and more), By End User (Banking, Financial Services, and Insurance, and more).

Israel Data Center Construction Market Size and Share

Israel Data Center Construction Market Summary
Image © Mordor Intelligence. Reuse requires attribution under CC BY 4.0.

Benchmark Israel Data Center Construction Against Other Technology, Media and Telecom Markets

Israel Data Center Construction Market Analysis by Mordor Intelligence

The Israel Data Center Construction Market size is estimated at USD 1.16 billion in 2025, and is expected to reach USD 2.12 billion by 2031, at a CAGR of 10.54% during the forecast period (2025-2031).

Robust government support, expanding cloud services, advancements in 5G technology, smart city initiatives, IoT upgrades, and a culture of digital creativity drive rapid growth in Israel's data center market. This surge is particularly evident in the rising demand for colocation and hyperscale services.

Under Construction IT Load Capacity: The upcoming IT load capacity of the Israeli data center market is expected to reach 426 MW by 2030.

Under Construction Raised Floor Space: The country's construction of raised floor area is expected to increase by 1.5 million sq. ft by 2030.

Planned Racks: The country's total number of racks to be installed is expected to reach around 76K units by 2030. Tel Aviv is expected to house the maximum number of racks in the coming years.

Planned Submarine Cables: Close to four submarine cable systems connect Israel. In 2023, a notable submarine cable, Blue, was launched. Spanning 4,696 km, it connects with landing points in Tel Aviv.

600+
data center reports by Mordor Intelligence
covering AI facilities, servers - global, regional or country-level, right down to individual data center components
See more reports  ↓

Competitive Landscape

Market Concentration

Israel Data Center Construction Market Concentration
Image © Mordor Intelligence. Reuse requires attribution under CC BY 4.0.

The Israeli data center construction market is fairly consolidated, with significant companies such as AECOM, James L Williams Middle East., Electra Group, Electra Group, and Minrav Group Ltd.

February 2024: MedOne, an Israeli data center firm, constructed two novel underground data centers on the outskirts of Tel Aviv. These centers, spanning three underground levels, will collectively cover about 30,000 square meters (322,920 square feet). The inaugural data center, situated north of Tel Aviv, is slated for a 2026 debut, with its counterpart set to follow suit in 2027.

Israel Data Center Construction Industry Leaders

  1. AECOM

  2. James L Williams Middle East.

  3. Electra Group

  4. Minrav Group Ltd

  5. eXp Israel

  6. *Disclaimer: Major Players sorted in no particular order

Recent Industry Developments

  • January 2024: The Swiss fund, Lian Group, teamed up with Europe-Israel Group and PAI to develop a NIS 400 million (USD 122.5 million) facility on a 6.25-acre plot in Afula, a city in northern Israel. The consortium acquired the land south of Nazareth for NIS 80 million (USD 24.5 million) approximately six months ago. Construction commenced toward the end of 2021, with a projected completion timeline of 2025 or 2026. The group has enlisted the services of Spector Amisar Architects.
  • April 2023: EdgeConneX, in a strategic move, enlarged its data center network in south Tel Aviv, Israel. The firm is constructing its third data center in Israel, bolstering its IT capacity by 7.5 MW. Situated in Rishon, this new facility will synergize with EdgeConneX's current establishments, which span two locations in Herzliya to the city's north and Petah Tikva to the east. Collectively, these sites will amass a substantial 14.5 MW capacity.

Table of Contents for Israel Data Center Construction Industry Report

1. INTRODUCTION

  • 1.1 Study Assumptions And Market Definition
  • 1.2 Scope of the Study

2. RESEARCH METHODOLOGY

  • 2.1 Research Framework
  • 2.2 Secondary Research
  • 2.3 Primary Research
  • 2.4 Data Triangulation and Insight Generation

3. EXECUTIVE SUMMARY

4. MARKET INSIGHT

  • 4.1 Market Overview
  • 4.2 Market Dynamics
    • 4.2.1 Market Drivers
    • 4.2.1.1 Increasing Investments in Cloud Technologies, Fueled by the Growing Adoption of AI, are Driving the Demand for Data Centers in the Irish Market.
    • 4.2.1.2 The Israel government's digital initiatives have fueled a surge in the demand for data centers.
    • 4.2.2 Market Restraints
    • 4.2.2.1 High Power Consumption and Emission Contribution of Data Centers
  • 4.3 Industry Attractiveness - Porter's Five Forces Analysis
    • 4.3.1 Bargaining Power of Suppliers
    • 4.3.2 Bargaining Power of Consumers
    • 4.3.3 Threat of New Entrants
    • 4.3.4 Threat of Substitutes
    • 4.3.5 Intensity of Competitive Rivalry
  • 4.4 Key Israel Data Center Construction Statistics
    • 4.4.1 Number of Data Centers In Israel, 2022 and 2023
    • 4.4.2 Data Center Under Construction in Israel, In MW, 2024 - 2029
    • 4.4.3 Average Capex and Opex For the Israel Data Center Construction
    • 4.4.4 Data Center Power Capacity Absorption In MW, Selected Cities, Israel, 2022 and 2023
    • 4.4.5 The Top CAPEX Spenders on Data Center infrastructure in Israel

5. MARKET SEGMENTATION

  • 5.1 Market Segmentation - By Infrastructure
    • 5.1.1 Market Segmentation - By Electrical Infrastructure
    • 5.1.1.1 Power Distribution Solution
    • 5.1.1.1.1 PDU - Basic and Smart - Metered and Switched solutions
    • 5.1.1.1.2 Transfer Switches
    • 5.1.1.1.2.1 Static
    • 5.1.1.1.2.2 Automatic (ATS)
    • 5.1.1.1.3 Switchgear
    • 5.1.1.1.3.1 Low-voltage
    • 5.1.1.1.3.2 Medium-voltage
    • 5.1.1.1.4 Power Panels and Components
    • 5.1.1.1.5 Other Power Panels and Components
    • 5.1.1.2 Power Backup Solutions
    • 5.1.1.2.1 UPS
    • 5.1.1.2.2 Generators
    • 5.1.1.3 Service - Design and Consulting, Integration, Support, and Maintenance
    • 5.1.2 Market Segmentation - By Mechanical Infrastructure
    • 5.1.2.1 Cooling Systems
    • 5.1.2.1.1 Immersion Cooling
    • 5.1.2.1.2 Direct-to-chip Cooling
    • 5.1.2.1.3 Rear Door Heat Exchanger
    • 5.1.2.1.4 In-row and In-rack Cooling
    • 5.1.2.2 Racks
    • 5.1.2.3 Other Mechanical Infrastructure
    • 5.1.3 General Construction
  • 5.2 Market Segmentation - By Tier Type
    • 5.2.1 Tier 1 and 2
    • 5.2.2 Tier 3
    • 5.2.3 Tier 4
  • 5.3 Market Segmentation - By End User
    • 5.3.1 Banking, Financial Services, and Insurance
    • 5.3.2 IT and Telecommunications
    • 5.3.3 Government and Defense
    • 5.3.4 Healthcare
    • 5.3.5 Other End Users

6. COMPETITIVE LANDSCAPE

  • 6.1 Company Profiles
    • 6.1.1 AECOM
    • 6.1.2 James L Williams Middle East
    • 6.1.3 Electra Group
    • 6.1.4 Minrav Group Ltd
    • 6.1.5 eXp Israel
    • 6.1.6 HHM Building Contracting
    • 6.1.7 Turner & Townsend
    • 6.1.8 Mevanah Real Estate (KD) Ltd
    • 6.1.9 Mace Group
  • *List Not Exhaustive

7. INVESTMENTS ANALYSIS

8. MARKET OPPORTUNITIES AND FUTURE TRENDS

9. ABOUT US

  • 9.1 Industries Covered
  • 9.2 Illustrative List of Clients in the Industry
  • 9.3 Our Customized Research Capabilities
**Subject to Availability

Israel Data Center Construction Market Report Scope

Data center construction combines physical processes used to construct a data center facility. It chains construction standards with data center operational environment requirements.

The Israeli data center construction market is segmented by infrastructure (electrical infrastructure (power distribution solutions (PDU, transfer switches, switchgear, power panels, and components)), power backup solutions (UPS and generators), service - design and consulting, integration, and support and maintenance)), (mechanical infrastructure (cooling systems (immersion cooling, direct-to-chip cooling, rear door heat exchanger, and in-row and in-rack cooling)), racks, and other mechanical infrastructure)), and general construction)), and tier type (Tier 1 and 2, Tier 3, and Tier 4), and end user (banking, financial services and insurance, IT and telecommunications, government, defense, healthcare, and other end users). The market sizes and forecasts are provided in value (USD) for all the above segments.

Market Segmentation - By Infrastructure
Israel Data Center Construction Market segmentation breakdown
Market Segmentation - By Electrical Infrastructure Power Distribution Solution PDU - Basic and Smart - Metered and Switched solutions
Transfer Switches Static
Automatic (ATS)
Switchgear Low-voltage
Medium-voltage
Power Panels and Components
Other Power Panels and Components
Power Backup Solutions UPS
Generators
Service - Design and Consulting, Integration, Support, and Maintenance
Market Segmentation - By Mechanical Infrastructure Cooling Systems Immersion Cooling
Direct-to-chip Cooling
Rear Door Heat Exchanger
In-row and In-rack Cooling
Racks
Other Mechanical Infrastructure
General Construction
Market Segmentation - By Tier Type
Israel Data Center Construction Market segmentation breakdown
Tier 1 and 2
Tier 3
Tier 4
Market Segmentation - By End User
Israel Data Center Construction Market segmentation breakdown
Banking, Financial Services, and Insurance
IT and Telecommunications
Government and Defense
Healthcare
Other End Users
Israel Data Center Construction Market segmentation breakdown
Market Segmentation - By Infrastructure Market Segmentation - By Electrical Infrastructure Power Distribution Solution PDU - Basic and Smart - Metered and Switched solutions
Transfer Switches Static
Automatic (ATS)
Switchgear Low-voltage
Medium-voltage
Power Panels and Components
Other Power Panels and Components
Power Backup Solutions UPS
Generators
Service - Design and Consulting, Integration, Support, and Maintenance
Market Segmentation - By Mechanical Infrastructure Cooling Systems Immersion Cooling
Direct-to-chip Cooling
Rear Door Heat Exchanger
In-row and In-rack Cooling
Racks
Other Mechanical Infrastructure
General Construction
Market Segmentation - By Tier Type Tier 1 and 2
Tier 3
Tier 4
Market Segmentation - By End User Banking, Financial Services, and Insurance
IT and Telecommunications
Government and Defense
Healthcare
Other End Users

Key Questions Answered in the Report

How big is the Israel Data Center Construction Market?

The Israel Data Center Construction Market size is expected to reach USD 1.16 billion in 2025 and grow at a CAGR of 10.54% to reach USD 2.12 billion by 2031.

What is the current Israel Data Center Construction Market size?

In 2025, the Israel Data Center Construction Market size is expected to reach USD 1.16 billion.

Who are the key players in Israel Data Center Construction Market?

AECOM, James L Williams Middle East., Electra Group, Minrav Group Ltd and eXp Israel are the major companies operating in the Israel Data Center Construction Market.

What years does this Israel Data Center Construction Market cover, and what was the market size in 2024?

In 2024, the Israel Data Center Construction Market size was estimated at USD 1.04 billion. The report covers the Israel Data Center Construction Market historical market size for years: 2019, 2020, 2021, 2022, 2023 and 2024. The report also forecasts the Israel Data Center Construction Market size for years: 2025, 2026, 2027, 2028, 2029, 2030 and 2031.

Page last updated on:

Israel Data Center Construction Market Report

Statistics for the 2025 Israel Data Center Construction market share, size and revenue growth rate, created by Mordor Intelligence™ Industry Reports. Israel Data Center Construction analysis includes a market forecast outlook for 2025 to 2031 and historical overview. Get a sample of this industry analysis as a free report PDF download.