Sweden Data Center Construction Market Size & Share Analysis - Growth Trends & Forecasts (2025 - 2031)

The Sweden Data Center Construction Market report segments the industry into By Infrastructure (By Electrical Infrastructure, By Mechanical Infrastructure, General Construction), By Tier Type (Tier I and II, Tier III, Tier IV), and By End User (Banking, Financial Services, and Insurance, IT and Telecommunications, Government and Defense, Healthcare, Other End Users).

Sweden Data Center Construction Market Size and Share

Sweden Data Center Construction Market Summary
Image © Mordor Intelligence. Reuse requires attribution under CC BY 4.0.

Benchmark Sweden Data Center Construction Against Other Technology, Media and Telecom Markets

Sweden Data Center Construction Market Analysis by Mordor Intelligence

The Sweden Data Center Construction Market size is estimated at USD 0.93 billion in 2025, and is expected to reach USD 1.71 billion by 2031, at a CAGR of 10.7% during the forecast period (2025-2031).

  • Under Construction IT Load Capacity: The upcoming IT load capacity of the Swedish data center construction market is expected to reach more than 340 MW by 2030.
  • Under Construction Raised Floor Space: The country's construction of raised floor area is expected to increase by more than 1.7 million sq. ft by 2030.
  • Planned Racks: The country's total number of racks to be installed is expected to reach more than 87,000 units by 2030. Stockholm may house the maximum number of racks by 2030.
  • Planned Submarine Cables: There are close to 12 submarine cable systems connecting Sweden, and many are under construction. One such submarine cable, estimated to be built by the end of 2024, is N0r5ke Viking 2, which stretches over 9,000 km with landing points at Lagunen, Sweden; Tananger, Norway; Stavanger, Norway; Oslo; Lista, Norway; Kristiansand, Norway; Larvik, Norway; Håvik, Norway; Haugesund, Norway; Horten, Norway; Bunnefjorden, Norway; Egersund, Norway; Bergen, Norway; and Arendal, Norway.
600+
data center reports by Mordor Intelligence
covering servers, AI facilities, storage and more - global, regional or country-level, right down to individual data center components
See more reports  ↓

Competitive Landscape

Market Concentration

Sweden Data Center Construction Market Concentration
Image © Mordor Intelligence. Reuse requires attribution under CC BY 4.0.

The Swedish data center construction market features key players like DPR Construction and Collen Construction Limited, leading to a slightly fragmented landscape. Notably, major data center corporations are intensifying their investments in Sweden, with a primary focus on expansion and building new facilities. This uptick in investments directly correlates with the growing demand for advanced data processing and storage capabilities. For instance,

November 2023: EcoDataCenter, a Swedish data center firm, secured EUR 170 million (USD 184.3 million) in debt financing. The funds are earmarked for bolstering the infrastructure of its Falun campus, known as EcoDataCenter 1. This move not only fortifies EcoDataCenter's position but also opens up new avenues for the market's vendors.

Sweden Data Center Construction Industry Leaders

  1. DPR Construction

  2. Collen Construction Limited

  3. Winthrop Technologies Ltd

  4. Skanska Sverige AB

  5. BENBAU Management GmbH

  6. *Disclaimer: Major Players sorted in no particular order

Recent Industry Developments

  • June 2023: Swedish startup Evroc announced plans to secure EUR 3 billion in funding for the construction of two hyperscale data centers.
  • April 2023: EcoDataCenter announced plans for constructing a new sustainable data center, EcoDataCenter 2, in Östersund, Sweden. The campus, boasting a total capacity of 150 MW, will be developed in stages, with the first phase of 20 MW set to be operational by 2026.

Table of Contents for Sweden Data Center Construction Industry Report

1. INTRODUCTION

  • 1.1 Study Assumptions and Market Definition
  • 1.2 Scope of the Study

2. RESEARCH METHODOLOGY

  • 2.1 Research Framework
  • 2.2 Secondary Research
  • 2.3 Primary Research
  • 2.4 Data Triangulation and Insight Generation

3. EXECUTIVE SUMMARY

4. MARKET INSIGHT

  • 4.1 Market Overview
  • 4.2 Market Dynamics
    • 4.2.1 Market Drivers
    • 4.2.1.1 Government Support for Digitization and 5G Deployment to Drive Market Growth
    • 4.2.1.2 Rising Demand for Cloud-based Services to Drive Market Growth
    • 4.2.2 Market Restraints
    • 4.2.2.1 Security Challenges Impacting Growth of Data Centers
  • 4.3 Industry Attractiveness - Porter's Five Forces Analysis
    • 4.3.1 Bargaining Power of Suppliers
    • 4.3.2 Bargaining Power of Consumers
    • 4.3.3 Threat of New Entrants
    • 4.3.4 Threat of Substitutes
    • 4.3.5 Intensity of Competitive Rivalry
  • 4.4 Key Sweden Data Center Construction Statistics
    • 4.4.1 Number of Data Centers in Sweden, 2022 and 2023
    • 4.4.2 Data Centers Under Construction in Sweden, in MW, 2024 - 2029
    • 4.4.3 Average CAPEX and OPEX for the Swedish Data Center Construction Market
    • 4.4.4 Data Center Power Capacity Absorption in MW, Selected Cities, Sweden, 2022 and 2023
    • 4.4.5 Top CAPEX Spenders on Data Center Infrastructure in Sweden

5. MARKET SEGMENTATION

  • 5.1 By Infrastructure
    • 5.1.1 By Electrical Infrastructure
    • 5.1.1.1 Power Distribution Solutions
    • 5.1.1.1.1 PDU - Basic and Smart - Metered and Switched Solutions
    • 5.1.1.1.2 Transfer Switches
    • 5.1.1.1.2.1 Static
    • 5.1.1.1.2.2 Automatic (ATS)
    • 5.1.1.1.3 Switchgear
    • 5.1.1.1.3.1 Low-voltage
    • 5.1.1.1.3.2 Medium-voltage
    • 5.1.1.1.4 Power Panels and Components
    • 5.1.1.1.5 Other Power Distribution Solutions
    • 5.1.1.2 Power Back-up Solutions
    • 5.1.1.2.1 UPS
    • 5.1.1.2.2 Generators
    • 5.1.1.3 Service - Design and Consulting, Integration, Support and Maintenance
    • 5.1.2 By Mechanical Infrastructure
    • 5.1.2.1 Cooling Systems
    • 5.1.2.1.1 Immersion Cooling
    • 5.1.2.1.2 Direct-to-Chip Cooling
    • 5.1.2.1.3 Rear Door Heat Exchanger
    • 5.1.2.1.4 In-row and In-rack Cooling
    • 5.1.2.2 Racks
    • 5.1.2.3 Other Mechanical Infrastructure
    • 5.1.3 General Construction
  • 5.2 By Tier Type
    • 5.2.1 Tier I and II
    • 5.2.2 Tier III
    • 5.2.3 Tier IV
  • 5.3 By End User
    • 5.3.1 Banking, Financial Services, and Insurance
    • 5.3.2 IT and Telecommunications
    • 5.3.3 Government and Defense
    • 5.3.4 Healthcare
    • 5.3.5 Other End Users

6. COMPETITIVE LANDSCAPE

  • 6.1 Company Profiles
    • 6.1.1 DPR Construction
    • 6.1.2 Collen Construction Limited
    • 6.1.3 Winthrop Technologies Ltd
    • 6.1.4 Skanska Sverige AB
    • 6.1.5 BENBAU Management GmbH
    • 6.1.6 Kirby Group Engineering
    • 6.1.7 Mercury Engineering
    • 6.1.8 AFEC
    • 6.1.9 Bravida Holding AB
    • 6.1.10 Coromatic Group AB
  • *List Not Exhaustive

7. INVESTMENTS ANALYSIS

8. MARKET OPPORTUNITIES AND FUTURE TRENDS

9. ABOUT US

  • 9.1 Industries Covered
  • 9.2 Illustrative List of Clients in the Industry
  • 9.3 Our Customized Research Capabilities
**Subject to Availability

Sweden Data Center Construction Market Report Scope

Data center construction combines physical processes used to construct a data center facility. It chains construction standards with data center operational environment requirements.

The Swedish data center construction market is segmented by infrastructure (electrical infrastructure (power distribution solutions (PDU, transfer switches, switchgear, power panels and components, and other power distribution solutions)), power back-up solutions (UPS and generators), and service – design and consulting, integration, support and maintenance), mechanical infrastructure (cooling systems (immersion cooling, direct-to-chip cooling, rear door heat exchanger, and in-row and in-rack cooling), racks, and other mechanical infrastructure), and general construction), tier type (tier I and II, tier III, and tier IV), and end user (banking, financial services and insurance, IT and telecommunications, government and defense, healthcare, and other end users).

By Infrastructure
Sweden Data Center Construction Market segmentation breakdown
By Electrical Infrastructure Power Distribution Solutions PDU - Basic and Smart - Metered and Switched Solutions
Transfer Switches Static
Automatic (ATS)
Switchgear Low-voltage
Medium-voltage
Power Panels and Components
Other Power Distribution Solutions
Power Back-up Solutions UPS
Generators
Service - Design and Consulting, Integration, Support and Maintenance
By Mechanical Infrastructure Cooling Systems Immersion Cooling
Direct-to-Chip Cooling
Rear Door Heat Exchanger
In-row and In-rack Cooling
Racks
Other Mechanical Infrastructure
General Construction
By Tier Type
Sweden Data Center Construction Market segmentation breakdown
Tier I and II
Tier III
Tier IV
By End User
Sweden Data Center Construction Market segmentation breakdown
Banking, Financial Services, and Insurance
IT and Telecommunications
Government and Defense
Healthcare
Other End Users
Sweden Data Center Construction Market segmentation breakdown
By Infrastructure By Electrical Infrastructure Power Distribution Solutions PDU - Basic and Smart - Metered and Switched Solutions
Transfer Switches Static
Automatic (ATS)
Switchgear Low-voltage
Medium-voltage
Power Panels and Components
Other Power Distribution Solutions
Power Back-up Solutions UPS
Generators
Service - Design and Consulting, Integration, Support and Maintenance
By Mechanical Infrastructure Cooling Systems Immersion Cooling
Direct-to-Chip Cooling
Rear Door Heat Exchanger
In-row and In-rack Cooling
Racks
Other Mechanical Infrastructure
General Construction
By Tier Type Tier I and II
Tier III
Tier IV
By End User Banking, Financial Services, and Insurance
IT and Telecommunications
Government and Defense
Healthcare
Other End Users

Key Questions Answered in the Report

How big is the Sweden Data Center Construction Market?

The Sweden Data Center Construction Market size is expected to reach USD 0.93 billion in 2025 and grow at a CAGR of 10.70% to reach USD 1.71 billion by 2031.

What is the current Sweden Data Center Construction Market size?

In 2025, the Sweden Data Center Construction Market size is expected to reach USD 0.93 billion.

Who are the key players in Sweden Data Center Construction Market?

DPR Construction, Collen Construction Limited, Winthrop Technologies Ltd, Skanska Sverige AB and BENBAU Management GmbH are the major companies operating in the Sweden Data Center Construction Market.

What years does this Sweden Data Center Construction Market cover, and what was the market size in 2024?

In 2024, the Sweden Data Center Construction Market size was estimated at USD 0.83 billion. The report covers the Sweden Data Center Construction Market historical market size for years: 2019, 2020, 2021, 2022, 2023 and 2024. The report also forecasts the Sweden Data Center Construction Market size for years: 2025, 2026, 2027, 2028, 2029, 2030 and 2031.

Page last updated on:

Sweden Data Center Construction Market Report

Statistics for the 2025 Sweden Data Center Construction market share, size and revenue growth rate, created by Mordor Intelligence™ Industry Reports. Sweden Data Center Construction analysis includes a market forecast outlook for 2025 to 2031 and historical overview. Get a sample of this industry analysis as a free report PDF download.

More reports on data centers