Sweden Data Center Power Market Size and Share

Image © Mordor Intelligence. Reuse requires attribution under CC BY 4.0.

Compare market size and growth of Sweden Data Center Power Market with other markets in Technology, Media and Telecom Industry

Sweden Data Center Power Market Analysis by Mordor Intelligence

The Sweden data center power market is valued at USD 209.65 million in 2025 and is projected to reach USD 253.73 million by 2030, reflecting a steady 3.89% CAGR. Moderate headline growth conceals a structural shift toward higher power density as hyperscale AI projects move rack loads from 5–10 kW to 50–100 kW. Operators are responding with medium-voltage switchgear, grid-interactive UPS, and battery energy storage that unlock new ancillary-service revenues while complying with stringent uptime needs. The 97% electricity tax rebate keeps delivered energy costs among Europe’s lowest, reinforcing Sweden’s appeal for carbon-aware investors. Development is pivoting northward where renewable headroom is abundant, yet Stockholm still commands premium colocation demand despite longer grid-connection queues, sustaining healthy competition across the Sweden data center power market.

Key Report Takeaways

  • By component, UPS Systems led with 32.17% of Sweden's data center power market share in 2024, while PDUs are forecast to grow at a 5.8% CAGR through 2030. 
  • By data center type, colocation providers held 47.35% revenue share in 2024, and the segment is expected to expand at a 5.3% CAGR to 2030. 
  • By data center size, large facilities accounted for 29% of the Sweden data center power market size in 2024; massive facilities are projected to advance at a 4.7% % CAGR between 2025 and 2030. 
  • By tier level, Tier III sites controlled 53.21% of the Sweden data center power market size in 2024, whereas Tier IV facilities are set to register the highest 6.3% CAGR to 2030.

Segment Analysis

By Component: PDUs Surge with AI Power Demands

The segment generated the largest revenue in 2024 when UPS Systems secured 32.17% of the Sweden data center power market share, underscoring how power protection remains foundational. PDUs, however, will grow fastest at 5.8% CAGR through 2030 as operators tailor branch-circuit metering and outlet-level switching for racks drawing 80 kW. The Sweden data center power market size for PDUs is projected to surpass USD 50 million by 2030, reflecting hyperscale customization budgets tied directly to GPU cluster deployment. ABB’s HiPerGuard MV UPS demonstrates how copper savings and high efficiency temper rising load currents, while Vertiv’s modular PDUs embed hot-swappable breakers to sustain uptime at extreme densities.

Generators are evolving from diesel toward dual-fuel and hydrogen-ready variants to reduce on-site CO₂; Cummins’ Centum Force container can operate on hydrotreated vegetable oil and integrate with BESS for low-noise testing cycles. Energy-storage systems, including Saft’s MW-scale lithium-ion arrays, are replacing spinning reserve and offsetting demand charges. Service revenues grow as complexity rises, and OEMs bundle predictive analytics with maintenance contracts to guarantee availability SLAs. Collectively, these component shifts reinforce Sweden’s reputation for resilient yet sustainable power infrastructure, bolstering competitiveness within the Sweden data center power market.

Image © Mordor Intelligence. Reuse requires attribution under CC BY 4.0.

Note: Segment shares of all individual segments available upon report purchase

By Data Center Type: Colocation Retains Lead Through Green Credentials

Colocation captured 47.35% revenue in 2024 and is expanding at 5.3% CAGR as enterprises favor shared infrastructure that meets CSRD transparency rules without a capital burden. Providers such as Conapto embed waste-heat reuse and 100% renewable PPAs, attracting international clients needing low-carbon footprints. EcoDataCenter’s sale of smaller sites to fund hyperscale capacity shows providers scaling vertically to house AI superclusters.
Hyperscalers and cloud platforms continue to build green-field campuses, yet many still lease phase-one halls from colocation landlords for speed-to-market. Enterprise and edge footprints remain relevant for latency-critical workflows, but will form a shrinking proportion of power spend. Sweden’s national green grid ensures all facility types can advertise near-zero Scope-2, but colocation operators monetize this fact most effectively by pooling load profiles and procuring hydro certificates wholesale. The resulting economies of scale sustain their leadership within the Sweden data center power market.

By Data Center Size: Massive Facilities Expand for AI Workloads

Large halls held 29% of spending in 2024 as incumbents extended modular wings, yet massive complexes above 150 MW will grow 4.7% annually through 2030. EcoDataCenter’s planned Borlänge mega-campus alone accounts for 240 MW and signals a structural pivot to fewer but larger power feeds. Medium and small facilities remain essential for edge caches and sovereign control, but their growth lags at single-digit rates. CoreWeave’s multi-site plan demonstrates how GPU cloud firms treat Sweden as an Arctic capital corridor, clustering compute near abundant hydro reservoirs. Larger footprints drive innovation in bus bar trunking, fault-tolerant MV switchgear, and robotic battery swap systems. In turn, suppliers refine designs around mega-campus norms, reinforcing the shift in the Sweden data center power market toward high-power densities.

Sweden Data Center  Power Market
Image © Mordor Intelligence. Reuse requires attribution under CC BY 4.0.

Note: Segment shares of all individual segments available upon report purchase

By Tier Level: Tier IV Facilities Rise with Reliability Demands

Tier III still dominates at 53.21% revenue owing to cost-balanced redundancy, yet Tier IV is posting a 6.3% CAGR as outage tolerance shrinks for AI pipelines that train round-the-clock. Operators deploy 2N+1 power trains, discreet dual utility feeds, and mirrored energy-storage banks to hit the 99.995% uptime cut-off. Vertiv’s collaboration with Conapto illustrates how next-generation switchboards and busways deliver a concurrently maintainable architecture without a footprint penalty. Tier I and II footprints persist for backup offices and DR nodes, yet their share is eroding. Over time, Sweden’s stable grid and renewable surplus may permit relaxed redundancy, but for now, AI workloads push designers upward in tier hierarchy, channeling capex into high-efficiency duplication across the Sweden data center power market.

Sweden Data Center Power Market
Image © Mordor Intelligence. Reuse requires attribution under CC BY 4.0.

Note: Segment shares of all individual segments available upon report purchase

Geography Analysis

Northern clusters benefit from hydro abundance and cooler ambient temperatures that drive average PUE down to 1.37, compared with global norms above 1.55. Boden Type DC One recorded a 1.0148 PUE, showcasing world-class efficiency and reinforcing the Sweden data center power market as a benchmark for sustainability.

Stockholm still commands premium colocation pricing, yet grid-connection delays redirect new megawatt projects to Norrbotten and Västernorrland. Government incentives favor waste-heat reuse in district heating loops, and EcoDataCenter’s Falun site already channels heat to pellet production, illustrating circular-economy synergies. Northbound migration dovetails with national agendas to balance load across transmission zones, and Uniper’s hybrid hydro-battery plants stabilize frequency for these rural campuses.

Competitive Landscape

The equipment tier shows moderate concentration with players like ABB, Schneider Electric, and Vertiv. Their portfolios span MV static UPS, modular PDUs, and digital-twin monitoring, creating high switching costs for operators. Local champions such as Hitachi Energy leverage domestic grid expertise to win high-voltage packages, while Saab drives microgrid control logic. Competition intensifies on sustainability features; ABB’s HiPerGuard MV UPS achieves 98% efficiency and 90% copper saving, setting a high bar.

Operationally, EcoDataCenter, atNorth, and Conapto lead colocation footprints, while Meta and Microsoft anchor hyperscale segments with self-owned campuses. Operators differentiate on renewable sourcing, heat-extraction integration, and CSRD-aligned carbon reporting dashboards. Service providers bundle power equipment with energy-as-a-service contracts, aligning fees to avoided emissions and peak-charge reductions.

White-space innovation focuses on hydrogen backup, SMR co-location, and AI-driven predictive repairs. Kärnfull Next’s SMR program with Samsung C&T may disrupt conventional power sourcing by 2032. In the meantime, integrated BESS-plus-PPA offers immediate resilience gains. The ongoing convergence of power equipment, software analytics, and sustainability services continues to reshape the Sweden data center power market competitive chessboard.

Sweden Data Center Power Industry Leaders

  1. ABB Ltd

  2. Schneider Electric SE

  3. Vertiv Group Corp.

  4. Eaton Corp. plc

  5. Cummins Inc.

  6. *Disclaimer: Major Players sorted in no particular order
Sweden Data Center Power Market Concentration
Image © Mordor Intelligence. Reuse requires attribution under CC BY 4.0.
Need More Details on Market Players and Competitors?
Download PDF

Recent Industry Developments

  • May 2025: Cummins launched the Centum Force containerized generator, able to run on hydrotreated vegetable oil for greener backup power.
  • April 2025: CoreWeave committed USD 2.2 billion to Swedish, Norwegian, and Spanish AI data centers, all powered by renewables.
  • March 2025: EcoDataCenter announced a 240 MW mega campus conversion of a former Borlänge paper mill, adding 200 long-term jobs.
  • December 2024: atNorth secured a 30-hectare plot in Sollefteå for its first Swedish mega facility with up to 100 MW

Table of Contents for Sweden Data Center Power Industry Report

1. INTRODUCTION

  • 1.1 Study Assumptions and Market Definition
  • 1.2 Scope of the Study

2. RESEARCH METHODOLOGY

3. EXECUTIVE SUMMARY

4. MARKET LANDSCAPE

  • 4.1 Market Overview
  • 4.2 Market Drivers
    • 4.2.1 Accelerated Hyperscale-AI build-outs
    • 4.2.2 Government's 97 % Electricity-Tax Rebate
    • 4.2.3 Rising Grid-Interactive UPS Deployments
    • 4.2.4 Demand-Charge Avoidance via BESS Microgrids
    • 4.2.5 On-Site H2 Backup Pilots by Hyperscalers
    • 4.2.6 EU CSRD-Driven Scope-2 Disclosure Pressure
  • 4.3 Market Restraints
    • 4.3.1 Long Grid-Connection Lead Times in Stockholm
    • 4.3.2 Scarcity of Qualified High-Voltage Technicians
    • 4.3.3 Uncertain SMR Nuclear Licensing Pathway
    • 4.3.4 Local Community Opposition to New Corridors
  • 4.4 Supply-Chain Analysis
  • 4.5 Regulatory Landscape
  • 4.6 Technological Outlook
  • 4.7 Porter's Five Forces Analysis
    • 4.7.1 Threat of New Entrants
    • 4.7.2 Bargaining Power of Buyers
    • 4.7.3 Bargaining Power of Suppliers
    • 4.7.4 Threat of Substitutes
    • 4.7.5 Intensity of Competitive Rivalry
  • 4.8 Assessment of Macro Economic Trends on the Market

5. MARKET SIZE AND GROWTH FORECASTS (VALUE)

  • 5.1 By Component
    • 5.1.1 Electrical Solutions
    • 5.1.1.1 UPS Systems
    • 5.1.1.2 Generators
    • 5.1.1.2.1 Diesel Generators
    • 5.1.1.2.2 Gas Generators
    • 5.1.1.2.3 Hydrogen Fuel-cell Generators
    • 5.1.1.3 Power Distribution Units
    • 5.1.1.4 Switchgear
    • 5.1.1.5 Transfer Switches
    • 5.1.1.6 Remote Power Panels
    • 5.1.1.7 Energy-storage Systems
    • 5.1.2 Service
    • 5.1.2.1 Installation and Commissioning
    • 5.1.2.2 Maintenance and Support
    • 5.1.2.3 Training and Consulting
  • 5.2 By Data Center Type
    • 5.2.1 Hyperscaler/Cloud Service Providers
    • 5.2.2 Colocation Providers
    • 5.2.3 Enterprise and Edge Data Center
  • 5.3 By Data Center Size
    • 5.3.1 Small Size Data Centers
    • 5.3.2 Medium Size Data Centers
    • 5.3.3 Large Size Data Centers
    • 5.3.4 Massive Size Data Centers
    • 5.3.5 Mega Size Data Centers
  • 5.4 By Tier Level
    • 5.4.1 Tier I and II
    • 5.4.2 Tier III
    • 5.4.3 Tier IV

6. COMPETITIVE LANDSCAPE

  • 6.1 Market Concentration
  • 6.2 Strategic Moves
  • 6.3 Market Share Analysis
  • 6.4 Company Profiles (includes Global level Overview, Market level overview, Core Segments, Financials as available, Strategic Information, Market Rank/Share for key companies, Products and Services, and Recent Developments)
    • 6.4.1 ABB Ltd
    • 6.4.2 Schneider Electric SE
    • 6.4.3 Vertiv Group Corp.
    • 6.4.4 Eaton Corp. plc
    • 6.4.5 Cummins Inc.
    • 6.4.6 Caterpillar Inc.
    • 6.4.7 Legrand Group
    • 6.4.8 Rolls-Royce plc (mtu)
    • 6.4.9 Rittal GmbH and Co. KG
    • 6.4.10 Siemens Energy AG
    • 6.4.11 Hitachi Energy Ltd
    • 6.4.12 GE Vernova
    • 6.4.13 Aggreko Ltd
    • 6.4.14 atNorth
    • 6.4.15 EcoDataCenter AB
    • 6.4.16 Conapto AB
    • 6.4.17 Bahnhof AB
    • 6.4.18 Digital Realty
    • 6.4.19 Equinix Inc.
    • 6.4.20 Microsoft Corp.
    • 6.4.21 Google LLC

7. MARKET OPPORTUNITIES AND FUTURE OUTLOOK

  • 7.1 White-space and Unmet-need Assessment
You Can Purchase Parts Of This Report. Check Out Prices For Specific Sections
Get Price Break-up Now

Sweden Data Center Power Market Report Scope

Data center power refers to the power infrastructure, including electrical components and electrical distribution systems, which provide the power necessary to operate and support the devices and servers within the data center. It includes various components and technologies designed to ensure a reliable, uninterruptible power supply for data center IT equipment, including uninterruptible power supplies (UPS), power distribution units (PDU), backup generators, and other power management solutions tailored to the specific needs of data centers. Data center operators achieve redundancy through duplicated components to maintain uninterrupted operations in the event of failure of some components and to maintain uptime during maintenance.

The Swedish data center power market is segmented by power infrastructure (electrical solutions (UPS systems, generators, power distribution solutions (PDU, switchgear, critical power distribution, transfer switches, remote power panels, and other solutions)) and service) and end user (IT & telecommunication, BFSI, government, media & entertainment, and other end users). The market sizes and forecasts are provided in terms of value (USD) for all the above segments.

By Component Electrical Solutions UPS Systems
Generators Diesel Generators
Gas Generators
Hydrogen Fuel-cell Generators
Power Distribution Units
Switchgear
Transfer Switches
Remote Power Panels
Energy-storage Systems
Service Installation and Commissioning
Maintenance and Support
Training and Consulting
By Data Center Type Hyperscaler/Cloud Service Providers
Colocation Providers
Enterprise and Edge Data Center
By Data Center Size Small Size Data Centers
Medium Size Data Centers
Large Size Data Centers
Massive Size Data Centers
Mega Size Data Centers
By Tier Level Tier I and II
Tier III
Tier IV
By Component
Electrical Solutions UPS Systems
Generators Diesel Generators
Gas Generators
Hydrogen Fuel-cell Generators
Power Distribution Units
Switchgear
Transfer Switches
Remote Power Panels
Energy-storage Systems
Service Installation and Commissioning
Maintenance and Support
Training and Consulting
By Data Center Type
Hyperscaler/Cloud Service Providers
Colocation Providers
Enterprise and Edge Data Center
By Data Center Size
Small Size Data Centers
Medium Size Data Centers
Large Size Data Centers
Massive Size Data Centers
Mega Size Data Centers
By Tier Level
Tier I and II
Tier III
Tier IV
Need A Different Region or Segment?
Customize Now

Key Questions Answered in the Report

What is the projected value of the Sweden data center power market in 2030?

The market is forecast to reach USD 253.73 million in 2030, expanding from USD 209.65 million in 2025 at a 4% CAGR.

Why are PDUs growing faster than other power components?

AI workloads need outlet-level metering and custom power mapping, pushing PDUs to a 5.8% CAGR, the fastest among all components.

How does Sweden’s electricity-tax rebate affect data center costs?

The 97% tax reduction lowers delivered energy prices, freeing capital to invest in efficiency upgrades and making Sweden one of Europe’s most cost-effective data center locations.

What role will hydrogen fuel cells play in Swedish data centers?

Hydrogen stacks demonstrated 99.999% uptime and zero emissions, and pilots in northern campuses indicate they could replace diesel gensets for reliable, carbon-free backup.

How is the EU CSRD influencing Swedish operators?

The directive requires detailed Scope-2 reporting, so operators leverage Sweden’s low-carbon grid and renewable PPAs to keep disclosures minimal and gain a competitive edge.

Page last updated on:

Sweden Data Center Power Market Report Snapshots