Market Snapshot

Study Period: | 2019-2027 |
Base Year: | 2021 |
CAGR: | >0.5 % |
![]() |
Need a report that reflects how COVID-19 has impacted this market and its growth?
Market Overview
The Republic of Congo Renewable Energy Market is expected to grow at a CAGR of more than 0.5% during the forecast period of 2022-2027. The COVID-19 pandemic slightly had virtually no impact on the renewable energy market owing to its small size and no significant project under construction during the pandemic. In terms of growth of the market factors such as decrease in the prices of renewable energy and pressure to decrease the carbon footprint are likely to drive the market. However, significant reliance on the fossil fuels to satisfy the energy demand and lack of government policies and programs may restrain the market.
- Hydropower is likely to dominate during the forecast period owing to significant installed capacity and further projects in the construction pipeline.
- The Republic of Congo has significant hydropwer potential owing to abundant water resources which can be exploited. Furthermore, the country is crossed by equator resulting in higher sunshine leading to significant solar energy potential. These potentials can be exploited in future which can give significant opportunties to various players involved in the market.
- Significant relaince over fossil fuels such as petroleum may restrain the renewable energy market in the country.
Scope of the Report
The Republic of Congo Renewable Energy Market report includes:
Key Market Trends
Hydropower likely to Dominate
- The Republic of Congo is a Central African country that shares its geographical boundaries with Gabon, Angola, the Democratic Republic of Congo, Cameroon, and the Central African Republic and shares the western part of its boundary with the South Atlantic Ocean.
- The hydropower segment dominates over other kinds of renewable energy power plants in the country with a capacity of 214 MW in 2020 as compared to 227 MW of renewable energy capacity installed in the country in 2020.
- This dominance is largely due to abundant hydropower resources in the country which have been exploited and are in various stages of development.
- In May 2021, China Gezhouba Group was commissioned to carry out the studies, and construction of the 600 MW Chollet hydroelectric dam on the Dja river and operate it under a build, operate and transfer contract, slated to complete in 2025.
- Furthermore, the country has witnessed marginal development in other kinds of renewable energy power systems and the likelihood of them being adopted during the forecast remains low.
- Thus, due to the above-mentioned points, Hydropower is likely to dominate in the Republic of Congo's Renewable Energy Market.

To understand key trends, Download Sample Report
Petroleum to Restrain the Market
- The Republic of Congo is a Central African nation that is considerably rich in petroleum reserves and has been a producer and net exporter of crude oil and has been an OPEC member for a long as a result, a majority of energy demand is catered by petroleum.
- The crude oil production stood at 307 thousand barrels per day in 2020 as compared to 336 thousand barrels per day in 2019, indicating a slight decline majorly due to the COVID-19 pandemic. The daily crude oil production has been increasing over the past few years after a decline indicating increasing adoption in the energy demand matrix.
- In 2019, an oil discovery was made in the Northern part of the Republic of Congo in the town of Oyo, named Delta de la Cuvette Deposit. It covers an area of 9,392 square meters and holds around 1 billion cubic meters of hydrocarbon according to estimates. The field is expected to quadruple the daily crude oil production once the field begins commercial operations.
- Thus, due to the above mentioned points, reliance over petroleum is likely to restrain the renewable energy market in the country during the forecast period.

Competitive Landscape
The Republic of Congo Renewable Energy Market is consolidated with very less number of players. Some of the major players include Andritiz Group, Energie Electrique Du Congo, China Gezhouba Group Company Limited, and many more.
Recent Development
- In May 2021, China Gezhouba Group recieved the contract to build the 600 MW Chollet Hydroelectric Dam on the Dja river. This energy infrastructure project is likely to cost between XAF 354 to XAF 670 billion depending on the development option implemented by the builder.
Table of Contents
1. INTRODUCTION
1.1 Scope of the Study
1.2 Market Definition
1.3 Study Assumption
2. RESEARCH METHODOLOGY
3. EXECUTIVE SUMMARY
4. MARKET OVERVIEW
4.1 Introduction
4.2 Renewable Energy Mix, 2021
4.3 Rennewable Energy Installed Capacity and Forecast in GW, till 2027
4.4 Recent Trends and Developmnets
4.5 Government Policies and Regulations
4.6 Market Dynamics
4.6.1 Drivers
4.6.2 Restraints
4.7 PESTLE Analysis
5. MARKET SEGMENTATION-BY TYPE
5.1 Solar
5.2 Hydro
5.3 Others
6. COMPETITIVE LANDSCAPE
6.1 Mergers and Acquisitions, Joint Ventures, Collaborations, and Agreements
6.2 Strategies Adopted by Leading Players
6.3 Company Profiles
6.3.1 Andritiz Group
6.3.2 Energie Electrique Du Congo
6.3.3 China Gezhouba Group Company Limited
*List Not Exhaustive7. MARKET OPPORTUNITIES AND FUTURE TRENDS
You can also purchase parts of this report. Do you want to check out a section wise price list?
Frequently Asked Questions
What is the study period of this market?
The Republic of Congo Renewable Energy Market market is studied from 2019 - 2027.
What is the growth rate of Republic of Congo Renewable Energy Market?
The Republic of Congo Renewable Energy Market is growing at a CAGR of >0.5% over the next 5 years.
Who are the key players in Republic of Congo Renewable Energy Market?
Andritiz Group, Energie Electrique Du Congo, China Gezhouba Group Company Limited are the major companies operating in Republic of Congo Renewable Energy Market.