United Kingdom Data Center Water Consumption Market Size and Share

United Kingdom Data Center Water Consumption Market (2025 - 2030)
Image © Mordor Intelligence. Reuse requires attribution under CC BY 4.0.

United Kingdom Data Center Water Consumption Market Analysis by Mordor Intelligence

The United Kingdom data center water consumption market size reached 214.12 billion liters in 2025 and is projected to expand to 331.16 billion liters by 2030, advancing at a 9.11% CAGR. Rapid AI-driven rack densification, the government’s Critical National Infrastructure designation, and escalating water stress across the South-East are driving this expansion. Hyperscalers are installing direct liquid and immersion cooling that draws 3 to 4 times the heat load of legacy servers yet can cut makeup water by up to 95% when configured in closed loops.[1]Kevin Scott, “Microsoft Shows Data Centers Can Save Water While Staying Cool,” microsoft.com At the same time, planning fast-tracks and priority grid connections has accelerated site approvals, though regulators now require detailed water-efficiency plans. Operators in Scotland benefit from land costs that are up to 90% lower than in London and cooler ambient temperatures, which extend free-cooling hours. In contrast, those in water-stressed catchments face tighter abstraction and discharge permits, resulting in operating costs that are 20% to 40% higher.

Key Report Takeaways

  • By data center type, colocation facilities held 42.28% of the United Kingdom data center water consumption market size in 2024, whereas cloud service providers are expanding at a 10.96% CAGR through 2030.  
  • By source of water procurement, potable municipal supply accounted for 54.38% share of the United Kingdom data center water consumption market in 2024, and non-potable sources are climbing at an 11.01% CAGR to 2030.  
  • By size, large facilities captured 36.87% share of the United Kingdom data center water consumption market size in 2024, yet mega sites above 50 MW are growing at a 10.59% CAGR through 2030.  
  • By treatment method, reverse osmosis commanded 31.48% share of the United Kingdom data center water consumption market in 2024, whereas filtration is the fastest-growing at 9.64% CAGR.  

Segment Analysis

By Source of Water Procurement: Non-Potable Sources Displace Potable Supply

Non-potable supply leads growth at an 11.01% CAGR as operators hedge against impending municipal flow caps. Potable water still held 54.38% of the United Kingdom data center water consumption market share in 2024, but its dominance is waning amid higher scarcity tariffs. Rainwater harvesting, greywater reuse, and recycled effluent, together, will exceed a 45% share of the United Kingdom data center water consumption market size by 2030, if current project pipelines materialize. Scotland’s rainfall above 1,200 mm per year ensures that most new campuses meet 30% or more potable water offset targets via rain capture alone.

Microsoft’s closed-loop deployments reduce makeup water by 95%, enabling rainwater and greywater to meet residual demand and secure permits in over-licensed catchments. Midlands operators negotiate a treated effluent offtake agreement with Severn Trent, securing a drought-resilient supply while monetizing unused treatment capacity for the utility. In the South East, the lack of new licenses is pushing legacy sites toward costly retrofits or relocation to Scotland and Wales.

United Kingdom Data Center Water Consumption Market: Market Share by Source of Water Procurement
Image © Mordor Intelligence. Reuse requires attribution under CC BY 4.0.

Note: Segment shares of all individual segments available upon report purchase

Get Detailed Market Forecasts at the Most Granular Levels
Download PDF

By Data Center Type: Cloud Providers Extend Lead on High-Density Builds

Cloud platforms grew 10.96% in 2024, faster than any other type, as AWS, Microsoft, and Google adopted liquid cooling that supports 30 to 150 kW racks. Colocation facilities retained a 42.28% slice of the United Kingdom data center water consumption market size, leveraging London’s connectivity but facing retrofit hurdles. Enterprise facilities trail with low single-digit growth as corporate owners migrate workloads to public cloud or outsource to liquid-ready colocation suites.

Hyperscale economics allow amortizing GBP 100 million (USD 133.40 million) cooling systems over tens of thousands of racks, whereas legacy colocation halls struggle to justify upgrades unless anchor tenants pre-commit. The Competition and Markets Authority notes AWS and Microsoft now control 70%-80% of cloud capacity, underscoring a structural tilt toward hyperscale that concentrates water-efficient investment.

By Data Center Size: Mega Sites Above 50 MW Capture AI Workloads

Mega campuses above 50 MW are the fastest-expanding size class at 10.59% CAGR, displacing distributed 10 to 50 MW builds. Large data centers still held 36.87% of the United Kingdom data center water consumption market share in 2024, but developers now favor Scotland and the Midlands, where land is cheap and abstraction licenses persist from former power stations.[4]Scottish Government, “Green Data Centres Vision and Action Plan,” gov.scot Small and medium facilities play a crucial role near latency-sensitive London finance hubs, yet local supply limitations constrain their water footprint.

DataVita’s plan to scale from 40 MW to 500 MW on a single Scottish campus exemplifies the appeal of mega-sites, pairing wind power PPAs with closed-loop cooling to achieve 90% water savings. Google’s 33-acre Waltham Cross project, although below 50 MW, deploys heat recovery and air cooling to win approval in a water-stressed Hertfordshire setting.

United Kingdom Data Center Water Consumption Market: Market Share by Data Center Size
Image © Mordor Intelligence. Reuse requires attribution under CC BY 4.0.

Note: Segment shares of all individual segments available upon report purchase

Get Detailed Market Forecasts at the Most Granular Levels
Download PDF

By Water Treatment Method: Filtration Surges on Pretreatment Needs

Reverse osmosis retained 31.48% share of the United Kingdom data center water consumption market in 2024, owing to its 95%-plus total dissolved solids removal, yet filtration is climbing fastest at 9.64% CAGR as a universal first barrier. Closed-loop liquid cooling reduces the biological load, but particulate fouling of plate heat exchangers still necessitates the use of multi-stage filters. UV disinfection grows in tandem as operators ditch chlorine to meet stricter discharge thresholds set by the Environment Agency. Softening lags because only hard-water regions justify the ongoing expense of regeneration.

Facilities in over-abstracted catchments must achieve sub-1 mg/L phosphorus and nitrogen in blowdown, pushing many toward costly reverse-osmosis and ion-exchange systems. Operators with sealed liquid systems instead spend on glycol filtration and online corrosion monitoring, which cuts their chemical budgets by up to 60%.

Geography Analysis

England consumed 62.67% of the national volume in 2024, but its share is expected to decline as flow caps and planning rejections slow new builds. Google’s Waltham Cross campus received approval only after committing to zero evaporative loss, indicating that future projects must prove water neutrality. Thames and Anglian water stress signals lengthen, permitting timelines to 24 to 36 months and inflating capital costs for retrofit systems. Midlands sites around Birmingham gain momentum because abstraction rights remain available and utilities offer treated effluent.

Scotland is the fastest-growing geography, with a 7.71% CAGR, underpinned by annual rainfall exceeding 1,200 mm, surplus wind power, and brownfield land with grandfathered cooling-water licenses. The Green Data Centres Action Plan lists twelve priority locations, and Scottish Enterprise tallied GBP 25 billion (USD 33.35 billion) of prospective data-center investment in 2024 alone. DataVita, Blackstone, Cloud HQ, and CoreWeave have collectively announced gigawatt-scale ambitions, anticipating both lower energy costs and simplified water compliance.

Wales and Northern Ireland jointly accounted for less than 10% of 2024 demand, yet could absorb overflow from England if abstraction limits tighten further. Severn Trent’s effluent-offtake framework positions the Welsh border as an attractive corridor, while Northern Ireland’s windy grid and low land costs mirror Scotland’s advantages.

Competitive Landscape

The United Kingdom data center water consumption market is moderately fragmented. Hyperscalers dominate new capacity, funding closed-loop cooling, reverse-osmosis skids, and utility pipelines that smaller operators cannot match. Colocation specialists Equinix, Digital Realty, Ark, and Virtus differentiate themselves through flexible, liquid-ready suites, but rely on customers' willingness to embrace higher-density racks. Enterprise operators, many of whom are in finance and telecom, continue to divest on-premises halls rather than retrofitting for 70 kW AI racks.

Technology leadership sets hyperscalers apart. Microsoft’s chip-level zero-water cooling saves 125 million liters per site each year, giving it an edge in water-stressed regions. Deep Green’s distributed model monetizes waste heat without district networks, illustrating a niche path for smaller firms. Utility partnerships remain an underexploited differentiator, with Severn Trent pioneering effluent supply deals, while Thames and Anglian Water trail behind.

M&A momentum is building as water-efficient capex escalates. Mid-tier colocation portfolios lacking financial depth are prime targets for hyperscaler carve-outs or infrastructure-fund roll-ups. Expect continued consolidation through 2030, with valuation premiums for campuses already equipped with closed-loop systems and non-potable supply contracts.

United Kingdom Data Center Water Consumption Industry Leaders

  1. Amazon Web Services Inc.

  2. Ark Data Centres Limited

  3. Centersquare Limited

  4. Colt Technology Services Group Limited

  5. CyrusOne LLC

  6. *Disclaimer: Major Players sorted in no particular order
United Kingdom Water Consumption Market Concentration
Image © Mordor Intelligence. Reuse requires attribution under CC BY 4.0.
Need More Details on Market Players and Competitors?
Download PDF

Recent Industry Developments

  • September 2024: UK government granted data centers Critical National Infrastructure status, accelerating capacity growth yet tying approvals to water-efficiency metrics.
  • September 2024: AWS committed GBP 8 billion to United Kingdom expansion through 2028, focused on AI capacity and water-saving cooling.
  • July 2024: Google secured planning for a GBP 790 million Waltham Cross campus using air cooling with heat recovery.
  • June 2024: Scottish Government released its Green Data Centres Action Plan to shorten permitting on twelve brownfield sites.

Table of Contents for United Kingdom Data Center Water Consumption Industry Report

1. INTRODUCTION

  • 1.1 Study Assumptions and Market Definition
  • 1.2 Scope of the Study

2. RESEARCH METHODOLOGY

3. EXECUTIVE SUMMARY

4. MARKET DYNAMICS

  • 4.1 Market Drivers
    • 4.1.1 Accelerating AI-Driven Compute Expansion
    • 4.1.2 Government Digital-Infrastructure Investments
    • 4.1.3 Sustainability Mandates for Water-Efficient Cooling
    • 4.1.4 Rising Electricity Prices Driving Energy-Water Efficiency
    • 4.1.5 Heat-Reuse Incentives Favour Closed-Loop Water Systems
    • 4.1.6 Utility Partnerships for Non-Potable Water Supply
  • 4.2 Market Restraints
    • 4.2.1 Escalating Water Stress in South-East and East England
    • 4.2.2 Tightening Abstraction and Discharge Permitting
    • 4.2.3 Public Backlash to Rural AI Super-Cluster Projects
    • 4.2.4 High Capex for On-Site Water-Treatment Infrastructure
  • 4.3 Industry Value Chain Analysis
  • 4.4 Porter's Five Forces Analysis
    • 4.4.1 Bargaining Power of Suppliers
    • 4.4.2 Bargaining Power of Consumers
    • 4.4.3 Threat of New Entrants
    • 4.4.4 Intensity of Competitive Rivalry
    • 4.4.5 Threat of Substitutes
  • 4.5 Impact of Macroeconomic Factors on the Market
  • 4.6 Case Study Analysis of Water Re-Use
  • 4.7 Key Considerations in Water-Scarce Areas
  • 4.8 Analysis of Water Treatment Methods

5. MARKET SIZE AND GROWTH FORECASTS (VOLUME)

  • 5.1 By Source of Water Procurement
    • 5.1.1 Potable Water
    • 5.1.2 Non-Potable Water
    • 5.1.3 Alternate Sources
  • 5.2 By Data Center Type
    • 5.2.1 Enterprise
    • 5.2.2 Colocation
    • 5.2.3 Cloud Service Providers
  • 5.3 By Data Center Size
    • 5.3.1 Mega
    • 5.3.2 Massive
    • 5.3.3 Large
    • 5.3.4 Medium
    • 5.3.5 Small
  • 5.4 By Water Treatment Method
    • 5.4.1 Filtration
    • 5.4.2 Reverse Osmosis
    • 5.4.3 UV Disinfection
    • 5.4.4 Chemical Treatment
    • 5.4.5 Softening

6. COMPETITIVE LANDSCAPE

  • 6.1 Market Concentration
  • 6.2 Strategic Moves
  • 6.3 Market Share Analysis
  • 6.4 Company Profiles (includes Global level Overview, Market level overview, Core Segments, Financials as available, Strategic Information, Market Rank/Share for key companies, Products and Services, and Recent Developments)
    • 6.4.1 Amazon Web Services Inc.
    • 6.4.2 Ark Data Centres Limited
    • 6.4.3 Centersquare Limited
    • 6.4.4 Colt Technology Services Group Limited
    • 6.4.5 CyrusOne LLC
    • 6.4.6 Data4 Group SAS
    • 6.4.7 Digital Realty Trust Inc.
    • 6.4.8 Equinix Inc.
    • 6.4.9 Global Switch Holdings Limited
    • 6.4.10 Google LLC
    • 6.4.11 Iron Mountain Information Management LLC
    • 6.4.12 Kao Data Ltd.
    • 6.4.13 Meta Platforms Inc.
    • 6.4.14 Microsoft Corporation
    • 6.4.15 Next Generation Data Limited
    • 6.4.16 NTT Corporation
    • 6.4.17 STACK Infrastructure Inc.
    • 6.4.18 Telehouse International Corporation of Europe Limited
    • 6.4.19 Vantage Data Centers Management Company LLC
    • 6.4.20 VIRTUS Data Centres Limited

7. MARKET OPPORTUNITIES AND FUTURE OUTLOOK

  • 7.1 White-Space and Unmet-Need Assessment
You Can Purchase Parts Of This Report. Check Out Prices For Specific Sections
Get Price Break-up Now

United Kingdom Data Center Water Consumption Market Report Scope

Data centers in the United Kingdom consume water for cooling, humidification, and various operational needs. This market analysis delves into consumption trends, examining factors such as water sources, types and sizes of data centers, and treatment methods employed to maintain efficiency and comply with regulations.

The United Kingdom Data Center Water Consumption Market Report is Segmented by Source of Water Procurement (Potable Water, Non-Potable Water, Alternate Sources), Data Center Type (Enterprise, Colocation, Cloud Service Providers), Data Center Size (Mega, Massive, Large, Medium, Small), Water Treatment Method (Filtration, Reverse Osmosis, UV Disinfection, Chemical Treatment, Softening), and Geography (England, Scotland, Wales, Northern Ireland). The Market Forecasts are Provided in Terms of Volume (Liters).

By Source of Water Procurement
Potable Water
Non-Potable Water
Alternate Sources
By Data Center Type
Enterprise
Colocation
Cloud Service Providers
By Data Center Size
Mega
Massive
Large
Medium
Small
By Water Treatment Method
Filtration
Reverse Osmosis
UV Disinfection
Chemical Treatment
Softening
By Source of Water Procurement Potable Water
Non-Potable Water
Alternate Sources
By Data Center Type Enterprise
Colocation
Cloud Service Providers
By Data Center Size Mega
Massive
Large
Medium
Small
By Water Treatment Method Filtration
Reverse Osmosis
UV Disinfection
Chemical Treatment
Softening
Need A Different Region or Segment?
Customize Now

Key Questions Answered in the Report

How much water does the United Kingdom data center sector use today?

The United Kingdom data center water consumption market size stands at 214.12 billion liters in 2025 and is set to climb to 331.16 billion liters by 2030.

Which cooling technology is gaining fastest adoption?

Closed-loop direct liquid cooling that can cut makeup water by up to 95% is expanding quickest, especially in AI-focused hyperscale campuses.

Why are operators moving north of London?

Scotland and the Midlands offer lower land costs, abundant renewable power, and easier abstraction licensing, making them attractive alternatives to water-stressed South-East England.

What share of consumption comes from potable water?

Potable municipal supply still accounts for 54.38% of total volume, but non-potable sources such as treated effluent and harvested rainwater are growing at an 11.01% CAGR.

How do regulators judge new site proposals?

Planning authorities require proof of water neutrality or net-positive hydrologic impact, strict discharge compliance, and alignment with the National Framework for Water Resources.

Who leads the shift toward zero-water cooling?

Microsoft has deployed chip-level liquid cooling across all United Kingdom facilities, saving roughly 125 million liters per site each year.