Top 5 Spain Renewable Energy Companies
Iberdrola SA
Siemens Gamesa Renewable Energy SA
Acciona SA
Red Electrica Corporacion SA
Cobra Group

Source: Mordor Intelligence
Spain Renewable Energy Companies Matrix by Mordor Intelligence
Our comprehensive proprietary performance metrics of key Spain Renewable Energy players beyond traditional revenue and ranking measures
This MI Matrix can diverge from simple top player lists because it rewards Spain specific operating signals, not only installed megawatts. Grid rights, offtake quality, and delivery capacity often matter more than name recognition when curtailment risk rises and negative price hours appear. Companies with strong maintenance, repowering, and storage roadmaps can score higher on Execution even if their Spain footprint is still growing. Spain's renewable buildout is now shaped by three practical indicators: ability to secure grid access, ability to finance projects under tighter PPA pricing, and ability to add flexibility through storage or hybridization. Many buyers also ask who can deliver bankable corporate PPAs in Spain and who can reduce curtailment exposure through batteries or better interconnection. This MI Matrix by Mordor Intelligence is better for supplier and competitor evaluation than revenue tables because it centers on delivery capability and asset readiness, not historical size alone.
MI Competitive Matrix for Spain Renewable Energy
The MI Matrix benchmarks top Spain Renewable Energy Companies on dual axes of Impact and Execution Scale.
Analysis of Spain Renewable Energy Companies and Quadrants in the MI Competitive Matrix
Comprehensive positioning breakdown
Iberdrola SA
Construction activity in eastern Spain signals continued capacity scale even as permitting tightens. Iberdrola, a leading player, is pushing new solar build in Valencia while reporting very large renewable capacity in Spain during 2025, which supports strong buyer confidence for long tenor PPAs. Regulation risk sits in curtailment exposure and evolving grid connection rules, so storage pairing and flexible offtake terms matter. If interconnection progress accelerates, Iberdrola can recycle capital faster into new sites. The main operational risk is schedule slippage from environmental approvals and local opposition.
Acciona Energa SA
Contracting discipline has become a clear strategic theme as price volatility persists across Spain. The company, a major player, is signing multi-year PPAs that anchor new solar and wind output from projects expected to enter service in 2024 and 2025. Asset rotation is also visible and can protect balance sheet headroom if merchant pricing stays weak. Execution risk remains turbine supply timing and grid readiness in crowded nodes. If corporate demand rebounds, its contracted portfolio can re-rate faster than peers focused on spot exposure.
Endesa SA
Strong 2024 earnings give Endesa room to prioritize networks and selective renewable build in Spain. Through its renewable arm, the company is a leading service provider that manages a large installed base and continues adding capacity, while guiding investment to 2026 and beyond. Its partnership approach is also clear through the partial sale tied to a multi gigawatt solar portfolio structure, which can recycle capital while keeping control. The key risk is slower grid reinforcement that delays interconnections and drives curtailment. If demand from data centers rises, contracted offtake can improve plant utilization.
Red Elctrica Corporacin SA (REE)
Grid investment acceleration is the clearest indicator of near term system readiness for more wind and solar. Spain's transmission operator increased 2024 investment and highlighted progress on cross border links including the Bay of Biscay connection and a Portugal interconnection. EIB support for the new France interconnector reinforces that trajectory and improves confidence in future export capacity. If reinforcement stays on schedule, curtailment risk eases for developers across saturated nodes. The main operational risk is permit and construction delays on strategic lines that push volatility back onto generators.
Enel Green Power Espaa
Managing about 10.2 GW of installed renewable capacity in Spain supports low cost optimization, yet partnership structures are now central. The company operates through a renewable subsidiary model. Capital recycling is visible via the Masdar transaction around a 2 GW operating solar PV portfolio vehicle, which keeps operational control while freeing funds. If wholesale price cannibalization deepens, portfolio level dispatch and hydro flexibility become more valuable. The main risk is congestion in high build regions, which can reduce realized output during peak solar hours.
Frequently Asked Questions
What should a corporate buyer check before signing a renewable PPA in Spain?
Confirm grid connection status, curtailment provisions, and how negative price hours are treated in the contract. Ask for evidence of permitting maturity and the delivery schedule tied to milestones.
How do you compare two solar or wind developers in Spain without relying on size alone?
Look at confirmed connection rights, EPC readiness, and the ability to add storage or hybridize to reduce revenue compression. Review track record for delivering COD close to the announced date.
What are the most common execution risks for new renewable plants in Spain?
Environmental approvals can take longer than planned, and transformer and line availability can delay energization. Congestion in high build regions can force curtailment even after COD.
When does battery storage materially improve a Spain solar project?
Storage helps most when daytime prices are frequently low and curtailment is common at the node. It also strengthens offtake negotiations by enabling shaped delivery closer to buyer load.
How should an operator evaluate a wind repowering proposal in Spain?
Verify grid and civil scope constraints, since foundations and evacuation upgrades often drive cost and schedule. Demand an output estimate that reflects modern turbine performance and realistic downtime assumptions.
What is the fastest way to reduce curtailment exposure in Spain for an operating plant?
Pursue storage add ons where feasible and improve forecasting and dispatch coordination with the system operator. In parallel, renegotiate offtake terms that share curtailment and price floor risk more fairly.
Methodology
Research approach and analytical framework
Data sourcing used public company disclosures, investor releases, regulatory filings, and credible journalism from 2023 onward. Private company scoring used observable project approvals, contracts, and commissioning signals. Where numbers conflicted, priority was given to primary disclosures and regulator referenced statements. Triangulation was used when only partial Spain specific detail was available.
Spain site count, grid nodes, and multi region execution across autonomous communities reduce curtailment concentration risk.
Utilities, corporates, and regulators prefer counterparties with proven compliance and predictable delivery in Spain permitting conditions.
Relative Spain scale in generation, EPC, equipment supply, and grid operation signals influence over project timing and pricing.
Control of plants, crews, service teams, and grid assets determines whether projects reach COD on schedule in Spain.
Storage pairing, repowering approaches, and new PPA structures since 2023 improve capture prices under Spain solar oversupply.
Spain linked earnings and funding access indicate resilience when prices fall and connection delays extend project cycles.
