Top 5 Insulated Concrete Form (ICF) Companies
Airlite Plastics Company & Fox Blocks (Fox Blocks)
BASF
Amvic Ireland LTD
Tremco CPG Inc.
BuildBlock Building Systems LLC

Source: Mordor Intelligence
Insulated Concrete Form (ICF) Companies Matrix by Mordor Intelligence
Our comprehensive proprietary performance metrics of key Insulated Concrete Form (ICF) players beyond traditional revenue and ranking measures
The top-player list can differ from the MI Matrix outcome because revenue strength does not always translate into jobsite presence, spec influence, or installer enablement in ICF walls. In practice, the MI view weights visible footprint, dependable delivery, and how well companies convert design intent into repeatable field outcomes. Capability indicators that tend to separate firms include certified training depth, breadth of wall and opening details, asset intensity tied to EPS or related inputs, and proof of code-ready documentation. Many buyers also want direct clarity on how ICF walls affect whole-building energy use and HVAC sizing, since tighter envelopes can change peak loads. Others focus on fire ratings, sound control, and moisture management at openings because those details drive inspection outcomes and call-backs. This MI Matrix by Mordor Intelligence is better for supplier and competitor evaluation than revenue tables alone because it ties scores to execution signals that show up on real projects.
MI Competitive Matrix for Insulated Concrete Form (ICF)
The MI Matrix benchmarks top Insulated Concrete Form (ICF) Companies on dual axes of Impact and Execution Scale.
Analysis of Insulated Concrete Form (ICF) Companies and Quadrants in the MI Competitive Matrix
Comprehensive positioning breakdown
Airlite Plastics Company & Fox Blocks (Fox Blocks)
Installer enablement is one of the clearest growth levers for Fox Blocks, and the company continues to push structured online learning plus live training options that lower contractor error rates. The firm is a top manufacturer in North America and also benefits from a broad physical footprint across the United States and Canada, which reduces freight risk when projects shift schedules. If energy code enforcement tightens in cold climate cities, volume should rise in below-grade and mid-rise walls. Dealer coverage could thin in smaller metros if local crews do not stay active.
BASF
Capacity and material science are the strategic center of gravity for BASF, and the company is investing to expand Neopor output to support higher-volume building insulation demand. BASF, a leading vendor in upstream insulation chemistry, is also pushing recycled-content and lower-footprint EPS inputs that can help projects satisfy public procurement expectations. If embodied-carbon disclosure becomes mandatory in more cities, spec teams may favor these inputs even when wall systems stay constant. The main risk is timing, since the new capacity start-up is scheduled for early 2027 and near-term supply tightness can still surface.
BuildBlock Building Systems LLC
Jobsite simplicity is the differentiator for BuildBlock, which emphasizes interlock design, cut guidance, and integrated system components that reduce improvisation during wall stacking. The product family, part of a major distributor-aligned system, can convert first-time crews because it covers bucking, decking, and specialty needs without forcing mixed brands. If code officials demand clearer compliance documentation, its design-professional resource posture becomes a real advantage. More overseas shipping demand could be a realistic what-if, where knockdown formats help logistics but also increase on-site assembly error if training is thin.
Carlisle Construction Materials (Carlisle Companies Inc.)
Strategy pivot toward building products can translate into more integrated envelope offerings for Carlisle that pair well with ICF walls, especially where roof and wall continuity drives performance outcomes. This diversified building-products player is exploring lower-footprint insulation chemistry with partners, signaling willingness to defend performance while reducing carbon. If commercial owners place higher weight on operational energy plus embodied impacts, Carlisle can bundle compliance narratives across the envelope. The key operational risk is that ICF-specific pull-through may lag if contractor habits stay roofing-centric in core channels.
Tremco CPG Inc.
System bundling across the building envelope is the strategic intent for Tremco CPG, which explicitly frames a multi-surface solution that includes structural exterior walls built with ICF approaches. The company is a major supplier with strong integration capacity and is also expanding manufacturing scale in Asia-Pacific, which signals continued investment appetite and process discipline. If stricter green-building codes reward verified air and water tightness, bundled assemblies become easier to defend during inspection. Coordination complexity is the key risk, since selling systems requires aligned distributor training and consistent warranty administration.
Frequently Asked Questions
What should I check first when selecting an ICF wall system for a mid-rise or multifamily project?
Start with available trained installers in your area and published engineering details for rebar, openings, and floor connections. Then confirm lead times and whether the system supports the wall thickness you need.
How do I compare EPS-based and polyurethane-based ICF options for real projects?
Compare whole-wall thermal performance, fire and smoke constraints in your jurisdiction, and moisture behavior at below-grade walls. Also assess how each system handles window and door opening detailing to avoid thermal bridging.
What are the most common causes of ICF schedule slips?
Late changes to opening layouts, missing accessory parts for bracing and bucking, and undertrained crews are the usual drivers. A strong supplier reduces this risk with repeatable takeoffs, training, and responsive technical support.
How can I reduce risk at window and door openings in ICF walls?
Use opening systems designed to maintain insulation continuity and to stay stable during concrete placement. Require pre-pour checklists that cover bracing, fastening points, and alignment tolerances.
What documentation helps most with permitting and inspection?
Clear installation manuals, tested fire and sound assemblies, and region-appropriate structural tables help inspectors move faster. Provide a concise packet that ties wall sections to the local code references.
When does it make sense to bundle waterproofing, air barrier, and sealants with the ICF wall decision?
Bundling helps when you want fewer interface gaps across the foundation-to-wall transition and fewer warranty disputes. It is most valuable on projects where air and water tightness testing is required or strongly expected.
Methodology
Research approach and analytical framework
Data sourcing: Used company press rooms, investor materials, and filings where available, plus credible trade coverage for project and product signals. Private firms were assessed using observable indicators like training programs, factory footprint statements, and published system capabilities. When direct ICF-only financials were not available, triangulated using segment disclosures and documented expansion activity. The focus stayed on signals tied to ICF wall systems and adjacent accessories within the defined scope.
Local plants, dealers, and field support determine whether ICF blocks and accessories arrive on schedule in each region.
Architects, code officials, and installers repeat systems they trust, reducing inspection friction on ICF walls and openings.
Relative position in ICF wall projects signals specification frequency and repeat purchasing across residential and commercial builds.
EPS molding capacity, accessory availability, and logistics discipline control risk of pour-day delays and wall quality defects.
Post-2023 launches that simplify stacking, openings, tall walls, and carbon profile improvements create measurable jobsite advantage.
Ability to fund training, product testing, and inventory buffers supports reliable delivery through construction cycles.
