Greece Solar Energy Companies: Leaders, Top & Emerging Players and Strategic Moves

Solar energy leaders in Greece, including PPC Renewables SA, TERNA Energy SA, and Mytilineos, compete through project scale, innovative deployment, and strategic alliances. Our analyst view highlights their positioning and approaches, supporting procurement and strategy teams. Full details are available in our Greece Solar Energy Report.

KEY PLAYERS
PPC Renewables SA TERNA Energy SA Mytilineos Energy & Metals SA (METKA EGN) Hellenic Petroleum Renewable Energy Sources SA RWE Renewables Greece (Meton Energy)
Get analysis tailored to your specific needs and decision criteria.

Top 5 Greece Solar Energy Companies

trophy
  • arrow

    PPC Renewables SA

  • arrow

    TERNA Energy SA

  • arrow

    Mytilineos Energy & Metals SA (METKA EGN)

  • arrow

    Hellenic Petroleum Renewable Energy Sources SA

  • arrow

    RWE Renewables Greece (Meton Energy)

Top Greece Solar Energy Major Players

Source: Mordor Intelligence

Greece Solar Energy Companies Matrix by Mordor Intelligence

Our comprehensive proprietary performance metrics of key Greece Solar Energy players beyond traditional revenue and ranking measures

These MI results can diverge from simple capacity or revenue rankings because they put weight on Greece specific delivery signals, not only parent company scale. The scoring favors evidence such as energized projects, PPAs signed, Greece based teams, and assets that can be operated under rising curtailment levels. Greece added record PV in 2024, yet curtailments and tighter control requirements mean execution quality is increasingly decisive for returns. If you are comparing Greece solar companies, two practical questions usually matter first: who can secure grid connection terms and who can keep output stable under cutbacks. Net metering changes and the shift toward net billing are also reshaping rooftop demand and storage attachment rates. This MI Matrix by Mordor Intelligence is better for supplier and competitor evaluation than revenue tables alone because it reflects on the ground deliverability and upgrade readiness.

MI Competitive Matrix for Greece Solar Energy

The MI Matrix benchmarks top Greece Solar Energy Companies on dual axes of Impact and Execution Scale.

Share
Loading chart...

Analysis of Greece Solar Energy Companies and Quadrants in the MI Competitive Matrix

Comprehensive positioning breakdown

PPC Renewables SA

Since 2023 project scale has been the clearest PPC Renewables signal in Greece, with Meton Energy moving from investment decisions into fast energization milestones and new build phases. Grid congestion and curtailment rules raise the value of PV plus storage, so execution discipline and dispatch control readiness matter as much as site access. PPC Renewables, a leading player, can still underperform if connection terms slip or if PPAs are signed before realistic curtailment scenarios are priced. The upside case is a quicker 2025 to 2027 build cadence that locks scarce grid capacity, while the main risk is rising cutbacks during peak solar hours.

Leaders

Mytilineos Energy & Metals SA (METKA EGN)

EPC delivery speed is the Mytilineos differentiator in Greece, especially when utility PV clusters must meet tight energization windows. In October 2023 it was selected to build eight Meton Energy PV projects totaling 490 MWp in Western Macedonia, which anchors credibility with banks and offtakers. If Greece tightens remote control and curtailment compliance, integration know how and SCADA readiness become a silent moat that reduces commissioning friction. The what if scenario is a wider shift toward PV plus storage packages that bundle EPC and grid code assurance, but a real risk is supplier delivery volatility that compresses schedules and damages liquidated damages economics.

Leaders

Hellenic Petroleum Renewable Energy Sources SA

Installed PV depth and a visible Greece pipeline define Hellenic Petroleum Renewable Energy Sources SA, even as it balances upstream legacy exposure with renewables expansion. The group disclosed 354 MW of PV in Greece by end 2024 and active procurement steps for a 200 MW PV project in Alexandroupoli tied to grid connection timing. The firm, operating in a top manufacturer style, can navigate auction style support, permitting sequences, and grid offers when they do not align cleanly. The upside is that acquisitions can accelerate siting and interconnection optionality, yet the critical risk is that delayed connection terms turn signed EPC and module plans into idle inventory and sunk preconstruction cost.

Leaders

TERNA Energy SA

Ownership change has become a strategic lever for TERNA Energy, because capital depth affects how quickly new solar and storage can be pushed through Greek grid bottlenecks. Masdar completed acquisition steps in late 2024 and communicated aggressive capacity ambitions, which may improve financing terms for large PV and hybrid builds. Reported FY 2024 results also point to a larger operating base that can absorb curtailment variability and still protect cash generation. The upside case is faster build out into 2027, while the key risk is public acceptance and permitting fatigue in high saturation regions where land use pushback is rising.

Leaders

RWE Renewables Greece (Meton Energy)

Joint venture structures show how risk can be reduced when Greek projects need both engineering depth and balance sheet credibility. In April 2025, RWE and PPC announced investment decisions for two new PV projects totaling 567 MWp with commissioning targeted in 2027, alongside progress across the earlier Amynteo portfolio. RWE, a major supplier with internal offtake options, can move faster on PPAs and grid sequencing than pure developers. The upside is that high volume deployment wins scarce connection capacity, while the operational risk is that curtailment levels rise faster than storage deployment, eroding realized capture prices.

Leaders

Frequently Asked Questions

Which firms are best suited for utility scale PV with corporate offtake in Greece?

Look for proven PPA signing capability and evidence of energization on large clusters. Also confirm curtailment assumptions are priced into the offtake terms.

What should I check first when selecting a Greece EPC for PV plus storage?

Ask for grid code compliance references, control system capability, and commissioning timelines under real grid constraints. Then verify supplier contracts for inverters and batteries, including spares.

How do grid congestion and curtailment change project design choices in Greece?

They push developers toward better forecasting, remote control readiness, and storage pairing where it is economic. They also increase the value of flexible interconnection strategies and staged energization plans.

What changes matter most for rooftop and small commercial solar in Greece right now?

Policy shifts from net metering toward net billing change payback math and often increase storage attachment interest. Buyers should confirm eligibility rules, export limits, and how compensation is calculated.

How can buyers reduce quality risk when sourcing modules and inverters for Greece projects?

Use bankable suppliers with clear warranty backing and local service pathways. Require documented serial tracking, acceptance testing, and clear responsibility for performance shortfalls.

When does CSP become relevant in Greece versus PV plus batteries?

CSP becomes relevant when evening supply and inertia value are prioritized and land and permitting allow it. For most sites, PV plus batteries remains simpler, faster to build, and easier to finance.


Methodology

Research approach and analytical framework

Data Sourcing & Research Approach

Used public filings, investor releases, company press rooms, and credible journalism for post 2023 developments. Private firm scoring relied on observable project milestones, site activity, PPAs, certifications, and local channel signals. Where Greece specific numbers were limited, multiple sources were triangulated and conservative scoring was used. Component firms were assessed on Greece channel presence and support signals rather than global shipment claims.

Impact Parameters
1
Presence & Reach

Greece siting, local teams, channels, and grid connected references reduce delivery uncertainty.

2
Brand Authority

Recognition with Greek banks, offtakers, regulators, and EPC primes improves win rates and financing speed.

3
Share

Relative Greece revenue, MW delivery, or contracted proxies indicate staying power in tenders and PPAs.

Execution Scale Parameters
1
Operational Scale

Owned assets, O&M capability, and supply chain control improve uptime under curtailment and grid controls.

2
Innovation & Product Range

PV plus storage, curtailment control readiness, and new module or inverter approaches since 2023 support value capture.

3
Financial Health / Momentum

Greece linked cash generation or observable funding strength supports warranty, O&M, and reinvestment capacity.