Bengaluru runs 211.9 MW of tracked data center IT load across 29 physical operating buildings, and Data Center Intelligence tracks 123.1 MW more under construction or announced. This page sizes the market, maps the hotspots, sets out who runs colocation and cloud capacity and what rack density means for cooling, and lists the projects that arrive next.

For coverage across other Indian cities, see the India data center list.

Published November 25, 2026

36
Records in the metro
211.9 MW
Operating IT load
29
Physical operating buildings
123.1 MW
Pipeline IT load

Checked 10 November 2026

Example data center records in Bengaluru
Mordor Intelligence, Data Center Intelligence research team. DCI India records, reviewed 10 November 2026.
Data Center OperatorData Center FacilityCityStatusIT load Capacity (MW)
STT GDC Pte LtdSTT Bengaluru DC 3BengaluruOperating18 MW
SIFY TECHNOLOGIES Ltd.SIFY BengaluruBengaluruOperating7.6 MW
NTT DATA GROUP CorporationNTT Bangalore 4ABengaluruOperating22.4 MW
NTT DATA GROUP CorporationNTT Bangalore 4CBengaluruUnder Construction22.4 MW
CapitaLand Group Pte. Ltd.Bangalore 01BengaluruAnnounced32.31 MW

How many operating data center buildings are in Bangalore?

A spread-out operator base. Sify, STT GDC and NxtGen together run 37.5% of operating IT load. NTT DATA is the largest operator, with 38.9 MW, or 18.4% of the city total.
Low density today, high density next. 28 of 31 operating records average under 10 kW per rack, while the largest pipeline phases record 16–70 kW per rack.
Two corridors carry the pipeline. Whitefield and the airport corridor hold 95.1% of the 123.1 MW pipeline, led by NTT DATA’s Bengaluru 4B and 4C phases, totaling 44.8 MW, and L&T’s 40 MW BLR1.
Data Center Intelligence (DCI) tracks 36 data center records in the Bengaluru metro from 23 named operators. Of these, 31 are operating, 3 are under construction, and 2 are announced.
Bengaluru metro data center records by status
Bengaluru metro data center records by status, checked 10 November 2026.
StatusRecordsIT load (MW)
Operating31211.9
Under Construction368.4
Announced254.7
Total36335.0

Major hotspots: Whitefield, the airport corridor and the old city clusters

Operating capacity spreads across the city. The airport corridor leads with 44.4 MW, followed by central and south city at 39.3 MW and Whitefield and ITPL at 38.8 MW. Hoskote and KR Puram have 27.0 MW, Electronic City and Hosur Road have 26.6 MW, and Bidadi has 19.1 MW.
Records and capacity by area
Records and capacity by area, checked 10 November 2026.
AreaRecordsOperating MWPipeline MW
Electronic City and Hosur Road426.6–
Whitefield and ITPL738.872.3
Hoskote and KR Puram (east)427.06.0
Airport corridor (Devanahalli, Yelahanka)544.444.8
Bidadi (south-west)119.1–
Central and south city939.3–
KIADB park (area not specified)210.0–
No street address recorded46.7–
Total36211.9123.1

New capacity moves north and east. Whitefield and the ITPL belt run 38.8 MW and hold 72.3 MW of pipeline, the most of any area. The airport corridor holds 44.8 MW of pipeline across NTT DATA’s Bengaluru 4B and 4C phases. DCI flags the 20.0 MW DigitalOcean cloud-region record within the central and south city total for review.

List of data centers in Bangalore by area

Selected DCI records in the Bengaluru metro, grouped by area.
Selected DCI records in the Bengaluru metro, grouped by area, checked 10 November 2026.
AreaFacilityStatus (DCI record)YearIT load (MW)
Electronic City and Hosur RoadCtrlS Bengaluru (Bangalore DC)Operating201812.5
ESDS BengaluruOperating20202.0
NTT DATA Bengaluru 2Operating20144.5
Sify Bengaluru (Electronic City)Operating20117.6
Whitefield and ITPLCapitaLand Bangalore 01Announced202732.3
Iron Mountain BLR-1Operating20234.0
L&T BLR1 WhitefieldUnder Construction202840.0
NxtGen Bengaluru (Whitefield)Operating20166.4
Nxtra Bangalore Whitefield (BLR1)Operating20155.4
Reliance Bangalore DC3Operating20165.0
STT GDC Bengaluru DC3Operating201918.0
Hoskote and KR Puram (east)BSNL KR Puram IDCOperating20131.0
NTT DATA Bengaluru 3Operating201812.0
Nxtra Hoskote 1 (BLR2) phase 1Operating202314.0
Nxtra Hoskote 2 (BLR3)Under Construction20266.0
Airport corridor (Devanahalli, Yelahanka)NTT DATA Bengaluru 4AOperating202622.4
NTT DATA Bengaluru 4BAnnounced202722.4
NTT DATA Bengaluru 4CUnder Construction202822.4
Sify Bengaluru 02 (Aerospace Park)Operating202520.0
Trijit Bangalore Data CenterOperating20162.0
Bidadi (south-west)NxtGen Bengaluru (Bidadi)Operating201419.1
Central and south cityCyfuture Bangalore DCOperating20233.0
DigitalOcean BLR1 (cloud region)Operating201620.0
Medhacloud Bangalore DCOperating20181.5
Micronova Bangalore DCOperating20001.0
Nivid Telecom Bangalore DCOperating20011.0
Reliance Bangalore DC1Operating20165.0
Reliance Bangalore DC2Operating20165.0
STT GDC Bengaluru DC1Operating20011.3
KIADB park (area not specified)STT GDC Bengaluru DC2Operating20097.0
Teleindia (DataSamudra) Bangalore DCOperating20163.0
No street address recordedITI Bengaluru DCOperating20090.7
NetForChoice Bengaluru DCOperating20161.0
Renaissance Bangalore DCOperating20002.0
SOLOIDC Bangalore DCOperating20162.0

Colocation operators, cloud sites and cooling in Bangalore

Colocation operators run the market

Colocation and hosting operators run almost all of Bengaluru’s recorded capacity. NTT DATA leads with 38.9 MW across three operating records, followed by Sify (27.6 MW) and STT GDC (26.3 MW). Nxtra (Airtel) and NTT DATA are the only leading operators with a recorded pipeline, and NTT DATA’s 44.8 MW pipeline is the largest of any operator.
The ten largest operators by operating IT load
Shares use their combined 192.2 MW, not the full city total.
The ten largest Bangalore operators by operating IT load, checked 10 November 2026.
OperatorOperating recordsOperating MWShare of listed operatorsPipeline MW
NTT DATA338.920.24%44.8
Sify227.614.36%–
STT GDC326.313.68%–
NxtGen225.513.27%–
DigitalOcean120.010.41%–
Nxtra (Airtel)219.410.09%6.0
Reliance Communications315.07.80%–
CtrlS112.56.50%–
Iron Mountain14.02.08%–
Cyfuture13.01.56%–

Bangalore data center projects and planned opening dates

The next additions

Nxtra’s Hoskote 2 (6.0 MW) is due in 2026. CapitaLand Bangalore 01 (32.3 MW) and NTT DATA 4B follow in 2027. L&T BLR1 (40.0 MW) and NTT DATA 4C are due in 2028.
Phases under construction or announced, by year due
Bangalore phases under construction or announced, by year due, checked 10 November 2026.
AreaFacilityStatus (DCI record)Year dueIT load (MW)
Hoskote and KR Puram (east)Nxtra Hoskote 2 (BLR3)Under Construction20266.0
Whitefield and ITPLCapitaLand Bangalore 01Announced202732.3
Airport corridor (Devanahalli, Yelahanka)NTT DATA Bengaluru 4BAnnounced202722.4
Whitefield and ITPLL&T BLR1 WhitefieldUnder Construction202840.0
Airport corridor (Devanahalli, Yelahanka)NTT DATA Bengaluru 4CUnder Construction202822.4

When new capacity arrives

IT load due by year
Bangalore IT load due by year, checked 10 November 2026.
Year dueRecordsIT load (MW)
202616.0
2027254.7
2028262.4
Total5123.1

The back end of the calendar is heaviest. 2028 carries the most new load, at 62.4 MW, because L&T BLR1, the largest single phase in the pipeline, falls due that year alongside NTT DATA 4C.

Three things to watch

  • 01L&T BLR1.
    At 40 MW, the Whitefield phase becomes the largest single build in the city when it delivers in 2028.
  • 02NTT DATA 4B and 4C.
    The two future phases total 44.8 MW: 4B is announced and 4C is under construction. With the operating 4A phase, the three phases total 67.2 MW.
  • 03High-density capacity.
    NTT DATA’s operating 4A phase records 70 kW per rack. Future phases at NTT DATA and Nxtra add high-density supply to a city where most operating records remain below 10 kW per rack.

Questions about data centers in Bangalore

  • 01

    How many data centers are there in Bangalore?

    DCI tracks 36 data center records in the Bengaluru metro: 31 operating, 3 under construction and 2 announced. These include 29 physical operating buildings.

  • 02

    Are Bangalore and Bengaluru data center listings the same?

    Yes, they cover the same city. DCI found one building, Medhacloud’s Krishna Garden facility, recorded under each name. Match records on street address, not name.

  • 03

    Which areas of Bangalore have the most data center capacity?

    The airport corridor leads with 44.4 MW of operating IT load, followed by central and south city (39.3 MW) and Whitefield and ITPL (38.8 MW). Whitefield (72.3 MW) and the airport corridor (44.8 MW) hold the largest pipelines.

  • 04

    Which is the largest data center in Bangalore?

    Among operating records, NTT DATA Bengaluru 4A has 22.4 MW, while Sify Bengaluru 02 and DigitalOcean BLR1 each record 20.0 MW. L&T BLR1 is the largest single future phase at 40.0 MW. NTT DATA’s future 4B and 4C phases total 44.8 MW; together with operating 4A, the campus total is 67.2 MW. NTT DATA is the largest operating operator at 38.9 MW.

  • 05

    Which Bangalore data centers support high-density racks?

    NTT DATA’s Bengaluru 4A and 4B and Nxtra’s Hoskote 2 (BLR3) record 70 kW per rack, L&T BLR1 18 kW, and CapitaLand Bangalore 01 16 kW. DCI records cooling redundancy but not the cooling method, so confirm cooling with the operator for each hall.

  • 06

    Does Data Center Intelligence offer a free trial?

    Yes. The DCI team starts with a 30-minute walkthrough tailored to your market, then opens a trial for your team.