List of data centers in Bangalore (Bengaluru) by area and operator
Bengaluru runs 211.9 MW of tracked data center IT load across 29 physical operating buildings, and Data Center Intelligence tracks 123.1 MW more under construction or announced. This page sizes the market, maps the hotspots, sets out who runs colocation and cloud capacity and what rack density means for cooling, and lists the projects that arrive next.
For coverage across other Indian cities, see the India data center list.
Published November 25, 2026
- 36
- Records in the metro
- 211.9 MW
- Operating IT load
- 29
- Physical operating buildings
- 123.1 MW
- Pipeline IT load
Checked 10 November 2026
| Data Center Operator | Data Center Facility | City | Status | IT load Capacity (MW) |
|---|---|---|---|---|
| STT GDC Pte Ltd | STT Bengaluru DC 3 | Bengaluru | Operating | 18 MW |
| SIFY TECHNOLOGIES Ltd. | SIFY Bengaluru | Bengaluru | Operating | 7.6 MW |
| NTT DATA GROUP Corporation | NTT Bangalore 4A | Bengaluru | Operating | 22.4 MW |
| NTT DATA GROUP Corporation | NTT Bangalore 4C | Bengaluru | Under Construction | 22.4 MW |
| CapitaLand Group Pte. Ltd. | Bangalore 01 | Bengaluru | Announced | 32.31 MW |
How many operating data center buildings are in Bangalore?
| Status | Records | IT load (MW) |
|---|---|---|
| Operating | 31 | 211.9 |
| Under Construction | 3 | 68.4 |
| Announced | 2 | 54.7 |
| Total | 36 | 335.0 |
Major hotspots: Whitefield, the airport corridor and the old city clusters
| Area | Records | Operating MW | Pipeline MW |
|---|---|---|---|
| Electronic City and Hosur Road | 4 | 26.6 | – |
| Whitefield and ITPL | 7 | 38.8 | 72.3 |
| Hoskote and KR Puram (east) | 4 | 27.0 | 6.0 |
| Airport corridor (Devanahalli, Yelahanka) | 5 | 44.4 | 44.8 |
| Bidadi (south-west) | 1 | 19.1 | – |
| Central and south city | 9 | 39.3 | – |
| KIADB park (area not specified) | 2 | 10.0 | – |
| No street address recorded | 4 | 6.7 | – |
| Total | 36 | 211.9 | 123.1 |
New capacity moves north and east. Whitefield and the ITPL belt run 38.8 MW and hold 72.3 MW of pipeline, the most of any area. The airport corridor holds 44.8 MW of pipeline across NTT DATA’s Bengaluru 4B and 4C phases. DCI flags the 20.0 MW DigitalOcean cloud-region record within the central and south city total for review.
List of data centers in Bangalore by area
| Area | Facility | Status (DCI record) | Year | IT load (MW) |
|---|---|---|---|---|
| Electronic City and Hosur Road | CtrlS Bengaluru (Bangalore DC) | Operating | 2018 | 12.5 |
| ESDS Bengaluru | Operating | 2020 | 2.0 | |
| NTT DATA Bengaluru 2 | Operating | 2014 | 4.5 | |
| Sify Bengaluru (Electronic City) | Operating | 2011 | 7.6 | |
| Whitefield and ITPL | CapitaLand Bangalore 01 | Announced | 2027 | 32.3 |
| Iron Mountain BLR-1 | Operating | 2023 | 4.0 | |
| L&T BLR1 Whitefield | Under Construction | 2028 | 40.0 | |
| NxtGen Bengaluru (Whitefield) | Operating | 2016 | 6.4 | |
| Nxtra Bangalore Whitefield (BLR1) | Operating | 2015 | 5.4 | |
| Reliance Bangalore DC3 | Operating | 2016 | 5.0 | |
| STT GDC Bengaluru DC3 | Operating | 2019 | 18.0 | |
| Hoskote and KR Puram (east) | BSNL KR Puram IDC | Operating | 2013 | 1.0 |
| NTT DATA Bengaluru 3 | Operating | 2018 | 12.0 | |
| Nxtra Hoskote 1 (BLR2) phase 1 | Operating | 2023 | 14.0 | |
| Nxtra Hoskote 2 (BLR3) | Under Construction | 2026 | 6.0 | |
| Airport corridor (Devanahalli, Yelahanka) | NTT DATA Bengaluru 4A | Operating | 2026 | 22.4 |
| NTT DATA Bengaluru 4B | Announced | 2027 | 22.4 | |
| NTT DATA Bengaluru 4C | Under Construction | 2028 | 22.4 | |
| Sify Bengaluru 02 (Aerospace Park) | Operating | 2025 | 20.0 | |
| Trijit Bangalore Data Center | Operating | 2016 | 2.0 | |
| Bidadi (south-west) | NxtGen Bengaluru (Bidadi) | Operating | 2014 | 19.1 |
| Central and south city | Cyfuture Bangalore DC | Operating | 2023 | 3.0 |
| DigitalOcean BLR1 (cloud region) | Operating | 2016 | 20.0 | |
| Medhacloud Bangalore DC | Operating | 2018 | 1.5 | |
| Micronova Bangalore DC | Operating | 2000 | 1.0 | |
| Nivid Telecom Bangalore DC | Operating | 2001 | 1.0 | |
| Reliance Bangalore DC1 | Operating | 2016 | 5.0 | |
| Reliance Bangalore DC2 | Operating | 2016 | 5.0 | |
| STT GDC Bengaluru DC1 | Operating | 2001 | 1.3 | |
| KIADB park (area not specified) | STT GDC Bengaluru DC2 | Operating | 2009 | 7.0 |
| Teleindia (DataSamudra) Bangalore DC | Operating | 2016 | 3.0 | |
| No street address recorded | ITI Bengaluru DC | Operating | 2009 | 0.7 |
| NetForChoice Bengaluru DC | Operating | 2016 | 1.0 | |
| Renaissance Bangalore DC | Operating | 2000 | 2.0 | |
| SOLOIDC Bangalore DC | Operating | 2016 | 2.0 |
Colocation operators, cloud sites and cooling in Bangalore
Colocation operators run the market
| Operator | Operating records | Operating MW | Share of listed operators | Pipeline MW |
|---|---|---|---|---|
| NTT DATA | 3 | 38.9 | 20.24% | 44.8 |
| Sify | 2 | 27.6 | 14.36% | – |
| STT GDC | 3 | 26.3 | 13.68% | – |
| NxtGen | 2 | 25.5 | 13.27% | – |
| DigitalOcean | 1 | 20.0 | 10.41% | – |
| Nxtra (Airtel) | 2 | 19.4 | 10.09% | 6.0 |
| Reliance Communications | 3 | 15.0 | 7.80% | – |
| CtrlS | 1 | 12.5 | 6.50% | – |
| Iron Mountain | 1 | 4.0 | 2.08% | – |
| Cyfuture | 1 | 3.0 | 1.56% | – |
Bangalore data center projects and planned opening dates
The next additions
| Area | Facility | Status (DCI record) | Year due | IT load (MW) |
|---|---|---|---|---|
| Hoskote and KR Puram (east) | Nxtra Hoskote 2 (BLR3) | Under Construction | 2026 | 6.0 |
| Whitefield and ITPL | CapitaLand Bangalore 01 | Announced | 2027 | 32.3 |
| Airport corridor (Devanahalli, Yelahanka) | NTT DATA Bengaluru 4B | Announced | 2027 | 22.4 |
| Whitefield and ITPL | L&T BLR1 Whitefield | Under Construction | 2028 | 40.0 |
| Airport corridor (Devanahalli, Yelahanka) | NTT DATA Bengaluru 4C | Under Construction | 2028 | 22.4 |
When new capacity arrives
| Year due | Records | IT load (MW) |
|---|---|---|
| 2026 | 1 | 6.0 |
| 2027 | 2 | 54.7 |
| 2028 | 2 | 62.4 |
| Total | 5 | 123.1 |
The back end of the calendar is heaviest. 2028 carries the most new load, at 62.4 MW, because L&T BLR1, the largest single phase in the pipeline, falls due that year alongside NTT DATA 4C.
Three things to watch
- 01L&T BLR1.At 40 MW, the Whitefield phase becomes the largest single build in the city when it delivers in 2028.
- 02NTT DATA 4B and 4C.The two future phases total 44.8 MW: 4B is announced and 4C is under construction. With the operating 4A phase, the three phases total 67.2 MW.
- 03High-density capacity.NTT DATA’s operating 4A phase records 70 kW per rack. Future phases at NTT DATA and Nxtra add high-density supply to a city where most operating records remain below 10 kW per rack.
Questions about data centers in Bangalore
01
How many data centers are there in Bangalore?
DCI tracks 36 data center records in the Bengaluru metro: 31 operating, 3 under construction and 2 announced. These include 29 physical operating buildings.
02
Are Bangalore and Bengaluru data center listings the same?
Yes, they cover the same city. DCI found one building, Medhacloud’s Krishna Garden facility, recorded under each name. Match records on street address, not name.
03
Which areas of Bangalore have the most data center capacity?
The airport corridor leads with 44.4 MW of operating IT load, followed by central and south city (39.3 MW) and Whitefield and ITPL (38.8 MW). Whitefield (72.3 MW) and the airport corridor (44.8 MW) hold the largest pipelines.
04
Which is the largest data center in Bangalore?
Among operating records, NTT DATA Bengaluru 4A has 22.4 MW, while Sify Bengaluru 02 and DigitalOcean BLR1 each record 20.0 MW. L&T BLR1 is the largest single future phase at 40.0 MW. NTT DATA’s future 4B and 4C phases total 44.8 MW; together with operating 4A, the campus total is 67.2 MW. NTT DATA is the largest operating operator at 38.9 MW.
05
Which Bangalore data centers support high-density racks?
NTT DATA’s Bengaluru 4A and 4B and Nxtra’s Hoskote 2 (BLR3) record 70 kW per rack, L&T BLR1 18 kW, and CapitaLand Bangalore 01 16 kW. DCI records cooling redundancy but not the cooling method, so confirm cooling with the operator for each hall.
06
Does Data Center Intelligence offer a free trial?
Yes. The DCI team starts with a 30-minute walkthrough tailored to your market, then opens a trial for your team.
Explore the Bangalore projects in DCI
DCI holds the full Bengaluru list with filters for area, operator, status, capacity, rack density, redundancy and expected year, and tracks status changes on each phase. A demonstration walks through the facilities and projects that match your brief.