United States Hyperscale Data Center Market Size and Share

Image © Mordor Intelligence. Reuse requires attribution under CC BY 4.0.

Compare market size and growth of United States Hyperscale Data Center Market with other markets in Technology, Media and Telecom Industry

United States Hyperscale Data Center Market Analysis by Mordor Intelligence

The United States hyperscale data center market size stood at USD 37.368 billion in 2025 and is forecast to reach USD 245.091 billion by 2031, registering a robust 36.82% CAGR over the period. The revenue curve is climbing faster than installed IT load, which is projected to expand from 33.589 thousand MW in 2025 to 73.752 thousand MW by 2031, a 14.01% CAGR that underscores how higher rack-power densities not merely floor space are driving value creation. Operators are re-architecting facilities around liquid-cooled racks exceeding 50 kW, advancing direct-to-chip solutions, and upgrading switchgear to support 32 amp branch circuits for GPU clusters. Competitive momentum is intensifying as self-build giants scale campus projects while colocation specialists chase AI-ready footprints, prompting an uptick in strategic alliances and equity injections topping USD 35 billion since late 2024. Regional growth pockets are shifting westward to Arizona and Nevada where tax incentives, renewable power and drier climates suit next-gen cooling strategies, even as Virginia’s I-95 corridor remains the global traffic core. Policy pressures around water use, Scope 3 disclosures and grid curtailment are simultaneously compelling innovation in closed-loop cooling and nuclear-backed power purchase agreements.

Key Report Takeaways

  • By data center type, self-build facilities captured 59.20% of the United States hyperscale data center market share in 2024, whereas hyperscale colocation is projected to grow at 12.8% CAGR through 2031. 
  • By component, IT infrastructure led with 41.20% revenue share in 2024 while DCIM/BMS solutions are advancing at a 13.7% CAGR to 2031.
  • By tier standard, Tier III sites held 70.40% share in 2024 whereas Tier IV deployments post an 11.4% CAGR forecast to 2031.
  • By end-user industry, cloud and IT accounted for 53.90% of 2024 value, while the government segment is set to expand at 14.90% CAGR on sovereign-cloud mandates.
  • By data center size, massive data center controlled 42.10% revenue in 2024; mega-scale campuses (>60 MW) are on track for a 15.20% CAGR to 2031.
  • By geography, the South US region carried 34.60% share in 2024, while the West US leads future growth at 13.30% CAGR through 2031.

Segment Analysis

By Data Center Type: Self-Build Dominance Faces Colocation Acceleration

Self-build projects remained the backbone of the United States hyperscale data center market, responsible for 59.20% revenue in 2024 as operators prioritized bespoke layouts, proprietary optical fabrics and private substation ownership. Hyperscalers leveraged this control to deploy 800G DR8 optical transceivers six months ahead of colocation peers, shaving network hop latency by 12 µs. Yet the cost to integrate liquid cooling, hardened floors and triple-redundant switchgear now pushes all-in build costs above USD 12.5 million per MW, sparking a 12.8% CAGR surge in colocation as a capital-light alternative.

Colocators such as Digital Realty pre-install shared coolant distribution systems and offer rack densities up to 85 kW, enabling enterprises to ride the AI wave without nine-figure capex outlays. Service-level agreements embed coolant loop redundancy guaranteed at 99.999% availability, a feature once exclusive to bespoke builds. This hybrid landscape is fostering joint-venture models where operators co-own shell space but outsource facility management to colocation specialists.

Image © Mordor Intelligence. Reuse requires attribution under CC BY 4.0.

By Component: IT Infrastructure Leadership Challenged by DCIM Innovation

IT hardware accounted for 41.20% of 2024 spend as Nvidia HGX trays, AMD EPYC Genoa processors and NVMe drives dominated procurement cycles. However DCIM/BMS software, though a smaller slice, is climbing at 13.7% CAGR as AI workloads demand granular telemetry and automated remediation. Contemporary platforms ingest 60,000 data points per rack every 15 seconds, allowing predictive adjustments that cut chilled-water flow by 9% without thermal excursions.

Electrical systems are also undergoing redesign; lithium-ion UPS strings now ship with AI-based state-of-health algorithms that extend life cycles by three years. Mechanical line items show the quickest inflation, with coolant economizers and dielectric immersion tanks posting 18% price increases due to stainless-steel shortages. The United States hyperscale data center market size for mechanical infrastructure is projected to reach USD 54 billion by 2031, reflecting both volume and technology premium.

By Tier Standard: Tier III Dominance Faces Tier IV AI Demands

Tier III still dominates at a 70.40% share, leveraging concurrent maintainability for most cloud applications. Yet mission-critical AI training cycles are nudging budgets toward Tier IV, which promises fault-tolerant topologies with 2N cooling, isolated distribution paths and 96-hour diesel autonomy. Operators calculate that a failed training run can waste USD 30 million in GPU-hours, dwarfing the 15% incremental CAPEX needed for Tier IV.

Designers embed dual coolant plants with cross-connect valves that sustain flow even during pump swap-outs, while fiber meshes feature physically diverse duct banks to satisfy stringent availability targets. PUE remains competitive because modern Tier IV layouts integrate variable-speed drives and thermal-store tanks that shift load off-peak, counterbalancing redundancy overhead.

By End-User Industry: Cloud Dominance Meets Government Acceleration

Cloud and IT providers such as AWS, Azure and Google Cloud represented 53.90% of 2024 demand, scaling generative AI APIs that now contribute up to 12% of total cloud revenue. The United States hyperscale data center market size for government applications is forecast to climb to USD 27 billion by 2031 on a 14.90% CAGR, spurred by zero-trust mandates and classified data repatriation. BFSI firms pursue AI-driven fraud analytics, reserving dedicated pods with ultralow jitter for high-frequency trading.

Manufacturers are piloting digital twins that mirror factory floors in real time, requiring GPU clusters co-located with MES back-ends. Telecom companies, meanwhile, integrate edge colocation to host virtual RAN and network slicing management, tightening synergy between 5G rollouts and core hyperscale centers. Such cross-industry adoption cements the United States hyperscale data center market as a foundational layer of national digital competitiveness.

United States Hyperscale Data Center Market: Market Share by End-user Industry
Image © Mordor Intelligence. Reuse requires attribution under CC BY 4.0.

Note: Segment shares of all individual segments available upon report purchase

By Data Center Size: Massive Facilities Lead Mega-Scale Expansion

Massive-scale sites retained 42.10% share thanks to right-sized risk profiles and incremental phasing agility. Even so, the mega-scale category (>60 MW) is sprinting at 15.20% CAGR, propelled by GPU clusters exceeding 100,000 accelerators that benefit from campus-level network fabrics. Mega campuses optimize capex through shared utility corridors, on-site 400 MVA substations and central liquid plants feeding multiple buildings via concentric steel mains.

Examples include CoreWeave’s USD 6 billion Lancaster project, targeting 90 MW IT load across three halls and shipping cooled glycol back to a 62,000 ton central chiller block. These builds negotiate direct interconnect agreements with transmission operators, bypassing retail tariffs and unlocking 15% energy savings against city-center sites.

Geography Analysis

The South US accounted for 34.60% revenue in 2024, anchored by Northern Virginia’s density where 70% of global internet traffic transits Ashburn cross-connects. Dominion Energy plans 11 GW of additional generation by 2031 to serve data-center loads, demonstrating public-private coordination depth. Georgia extends tax abatements through 2035, lifting project IRRs by 2 percentage points. Texas leverages deregulated ERCOT markets and its 15 GW wind fleet to attract operators eyeing renewable PPAs despite grid intermittency caps.

The West US shows the fastest climb with a 13.30% CAGR outlook. Arizona’s cooler desert nights and aggressive incentives cut chiller hours and accelerate permitting, causing build square footage to surge 76% in 2024. California advances carbon-neutral agendas through SB-253, prompting adoption of on-site solar-plus-storage microgrids and fuel-free backup stacks to avoid diesel bans. Emerging nodes in Nevada and Utah offer abundant land, 230 kV backbone access and seismic-resistant plateaus attractive for mega campuses.

Northeast and Midwest corridors post steady expansion tied to financial trading, logistics and manufacturing digitization. Chicago’s inventory climbed 20.6% in 2024 amid sub-2% vacancy, underpinned by contiguous parcel availability and 345 kV tie-ins. New York’s Local Law 97 charges press operators toward upstate locations with hydro-backed power, while Michigan offers 100% renewables on-ridgeline wind deals. Overall, regional diversification mitigates single-grid exposure and spreads talent pools across the United States hyperscale data center market.

Competitive Landscape

The United States hyperscale data center market is moderately concentrated, with the top five operators—AWS, Microsoft, Google, Meta and Apple—estimated to control roughly 62% of installed IT load through a mix of self-build and strategic colocation leases. These players deepen vertical integration by contracting directly with transformer and switchgear OEMs, thereby front-running lead-time bottlenecks. Colocation majors such as Equinix, Digital Realty and CyrusOne respond with AI-optimized halls featuring 85 kW racks, dielectric coolant baths and 800G fabrics, catalyzing an ecosystem of coolant additive vendors and graphite TIM suppliers.

Strategic maneuvers center on capital deployment: Vantage’s USD 9.2 billion equity raise and Aligned’s USD 12 billion funding round in early 2025 exemplify investor appetite for AI-ready assets with 20-year yield visibility. M&A activity continues as smaller players armed with entitlement landbanks but lacking build capital become targets for private-equity backed consolidators. Operators also fortify supply resilience by booking multiyear GPU allotments and co-developing HBM packaging lines with silicon fabs.

Technology differentiation pivots on thermal solutions and automation. Patent trends show a rise in plate-to-chip fluid couplers and coolant dielectric formulations. AI-driven BMS suites now execute closed-loop set-point control, trimming energy spend by 6-8% year-on-year. Sustainability remains a competitive signal; AWS’s nuclear-powered Pennsylvania campus and Switch’s LEED-Platinum Las Vegas site headline the race to sub-1.1 PUE. As regulatory scrutiny escalates, operators embed life-cycle carbon dashboards into tenant portals, providing granular emissions accounting.

United States Hyperscale Data Center Industry Leaders

  1. Amazon Web Services, Inc. (AWS)

  2. Microsoft Corporation

  3. Google LLC

  4. Meta Platforms Inc.

  5. Digital Realty Trust Inc.

  6. *Disclaimer: Major Players sorted in no particular order
United States Hyperscale Data Center Market
Image © Mordor Intelligence. Reuse requires attribution under CC BY 4.0.
Need More Details on Market Players and Competitors?
Download PDF

Recent Industry Developments

  • May 2025: Microsoft Corporation announced plans to invest approximately USD 80 billion in AI-powered data centers for fiscal year 2025. Over 50% of this funding is allocated to facilities within the United States. This initiative represents the company's largest annual capital expenditure to date, emphasizing the extensive infrastructure required to manage AI operations.
  • April 2025: Amazon Web Services (AWS) announced plans to invest approximately USD 11 billion in Georgia to develop new data center facilities. This initiative highlights the company's strategic focus on expanding its infrastructure in regions offering advantageous power resources and regulatory frameworks. The investment underscores AWS's long-term commitment to enhancing its global operational capabilities.
  • February 2025: Meta Platforms, Inc. announced plans to invest approximately USD 60-65 billion in developing advanced data center infrastructure. This initiative focuses on creating facilities specifically designed to support artificial intelligence workloads, reflecting the company's commitment to accelerating its AI advancements.
  • January 2025: OpenAI, Microsoft Corporation, and their collaborators have introduced the Stargate Project, a groundbreaking initiative to invest USD 500 billion over four years in developing AI data centers. With USD 100 billion allocated for 2025, this effort signifies an unparalleled commitment to advancing specialized AI infrastructure on a massive scale.
  • August 2024: Alphabet Inc.'s Google has significantly expanded its artificial intelligence (AI) training infrastructure in Iowa. The Council Bluffs campus is nearing an IT capacity of 300 MW, with projections indicating it will exceed 500 MW by 2025. This development highlights the immense scale of resources required to support AI advancements.
  • April 2025: CoreWeave, Inc. has raised approximately USD 650 million to accelerate its growth in the GPU cloud industry. This funding strengthens its position as a leading provider of high-performance computing infrastructure, specifically designed for artificial intelligence applications.

Table of Contents for United States Hyperscale Data Center Industry Report

1. INTRODUCTION

  • 1.1 Study Assumptions and Market Definition
  • 1.2 Scope of the Study

2. RESEARCH METHODOLOGY

3. EXECUTIVE SUMMARY

4. MARKET LANDSCAPE

  • 4.1 Market Overview
  • 4.2 Market Drivers
    • 4.2.1 AI / ML rack-power density explosion (Greater than 50 kW / rack)
    • 4.2.2 Public-sector sovereign-cloud zones (DoD JWCC, FedRAMP High)
    • 4.2.3 5G edge-core convergence spurring secondary-market builds
    • 4.2.4 GenAI inference clusters demanding campus-scale liquid-cooling
    • 4.2.5 SMR-backed green PPAs lowering lifetime PUE
    • 4.2.6 Tax-incentive fast-track data-center corridors (TX, GA, OH)
  • 4.3 Market Restraints
    • 4.3.1 Water-use restrictions on evaporative cooling (West Coast)
    • 4.3.2 GPU / optic supply-chain bottlenecks
    • 4.3.3 Heat- and carbon-levies (NYC Local Law 97, CA SB-253)
    • 4.3.4 Local-grid curtailment rules capping greater than 30 MW draws
  • 4.4 Value / Supply-Chain Analysis
  • 4.5 Technological Outlook

5. ARTIFICIAL INTELLIGENCE (AI) INCLUSION IN HYPERSCALE DATA CENTER (Sub-segments are subject to change depending on Data Recency)

  • 5.1 AI Workload Impact: Rise of GPU-Packed Racks and High Thermal Load Management
  • 5.2 Rapid Shift toward 400G and 800G Ethernet – Local OEM Integration and Compatibility Demands
  • 5.3 Innovations in Liquid Cooling: Immersion and Cold Plate Trends
  • 5.4 AI-Based Data Center Management (DCIM) Adoption – Role of Cloud Providers

6. REGULATORY AND COMPLIANCE FRAMEWORK

7. KEY DATA CENTER STATISTICS

  • 7.1 Existing Hyperscale Data Center Facilities in United States (in MW) (Hyperscale S
  • 7.2 List of Upcoming Hyperscale Data Center in United States
  • 7.3 List of Hyperscale Data Center Operators in the United States
  • 7.4 Analysis on Data Center CAPEX in United States

8. MARKET SIZE AND GROWTH FORECASTS (VALUE AND VOLUME)

  • 8.1 By Data Center Type
    • 8.1.1 Hyperscale Self-build
    • 8.1.2 Hyperscale Colocation
  • 8.2 By Component
    • 8.2.1 IT Infrastructure
    • 8.2.1.1 Server Infrastructure
    • 8.2.1.2 Storage Infrastructure
    • 8.2.1.3 Network Infrastructure
    • 8.2.2 Electrical Infrastructure
    • 8.2.2.1 Power Distribution Unit
    • 8.2.2.2 Transfer Switches and Switchgears
    • 8.2.2.3 UPS Systems
    • 8.2.2.4 Generators
    • 8.2.2.5 Other Electrical Infrastructure
    • 8.2.3 Mechanical Infrastructure
    • 8.2.3.1 Cooling Systems
    • 8.2.3.2 Racks
    • 8.2.3.3 Other Mechanical Infrastructure
    • 8.2.4 General Construction
    • 8.2.4.1 Core and Shell Development
    • 8.2.4.2 Installation and Commissioning
    • 8.2.4.3 Design Engineering
    • 8.2.4.4 Fire, Security and Safety Systems
    • 8.2.4.5 DCIM / BMS Solutions
  • 8.3 By Tier Standard
    • 8.3.1 Tier III
    • 8.3.2 Tier IV
  • 8.4 By End-user Industry
    • 8.4.1 Cloud and IT
    • 8.4.2 Telecom
    • 8.4.3 Media and Entertainment
    • 8.4.4 Government
    • 8.4.5 BFSI
    • 8.4.6 Manufacturing
    • 8.4.7 E-Commerce
    • 8.4.8 Other End Users
  • 8.5 By Data Center Size
    • 8.5.1 Large (Less than equal to 25 MW)
    • 8.5.2 Massive (Greater than 25 MW and less than equal to 60 MW)
    • 8.5.3 Mega (Greater than 60 MW)
  • 8.6 By Geography
    • 8.6.1 Northeast US
    • 8.6.2 Midwest US
    • 8.6.3 South US
    • 8.6.4 West US

9. COMPETITIVE LANDSCAPE

  • 9.1 Market Share Analysis
  • 9.2 Company Profiles {(includes Global-level Overview, Market-level Overview, Core Segments, Financials as available, Strategic Information, Market Rank/Share, Products and Services, Recent Developments)}
    • 9.2.1 Amazon Web Services
    • 9.2.2 Microsoft Corporation
    • 9.2.3 Alphabet Inc. (Google)
    • 9.2.4 Meta Platforms Inc.
    • 9.2.5 Oracle Corporation
    • 9.2.6 Digital Realty Trust Inc.
    • 9.2.7 Equinix Inc.
    • 9.2.8 NTT Ltd.
    • 9.2.9 CyrusOne Inc.
    • 9.2.10 Vantage Data Centers LLC
    • 9.2.11 QTS Data Centers
    • 9.2.12 Switch Inc.
    • 9.2.13 STACK Infrastructure
    • 9.2.14 Iron Mountain Data Centers
    • 9.2.15 Flexential Corp.
    • 9.2.16 CoreWeave Inc.
    • 9.2.17 Arista Networks Inc.
    • 9.2.18 Dell Technologies Inc.
    • 9.2.19 Hewlett Packard Enterprise
    • 9.2.20 Cisco Systems Inc.
    • 9.2.21 Lenovo Group Ltd.
    • 9.2.22 Alibaba Group Holding Ltd.
    • 9.2.23 Tencent Holdings Ltd.
    • 9.2.24 Baidu Inc.
    • 9.2.25 GDS Holdings Ltd.
    • 9.2.26 Scala Data Centers

10. MARKET OPPORTUNITIES AND FUTURE OUTLOOK

  • 10.1 White-space and Unmet-Need Assessment
You Can Purchase Parts Of This Report. Check Out Prices For Specific Sections
Get Price Break-up Now

United States Hyperscale Data Center Market Report Scope

Hyperscale data centers, also known as Enterprise Hyperscale facilities, are large-scale infrastructures owned and managed by the companies they support. These centers deliver a wide range of scalable applications and storage services to meet the needs of individuals and businesses. Designed for efficiency, they house thousands of servers alongside critical hardware like routers, switches, and storage disks. To ensure seamless operations, these facilities are equipped with advanced support systems, including power and cooling solutions, uninterruptible power supplies (UPS), and air distribution networks.

The United States Hyperscale Datacenter Market is Segmented by Data Center Type (Hyperscale Colocation, Enterprise/Hyperscale Self Build), By Service Type (IaaS ( Infrastructure-as-a-Service), PaaS ( Platform-as-a-Service), SaaS( Software-as-a-Service)), By End User (Cloud & IT, Telecom, Media & Entertainment, Government, BFSI, Manufacturing, E-Commerce, Other End User). The Report Offers the Market Size and Forecasts for all the Above Segments in Terms of USD (millions).

By Data Center Type
Hyperscale Self-build
Hyperscale Colocation
By Component
IT Infrastructure Server Infrastructure
Storage Infrastructure
Network Infrastructure
Electrical Infrastructure Power Distribution Unit
Transfer Switches and Switchgears
UPS Systems
Generators
Other Electrical Infrastructure
Mechanical Infrastructure Cooling Systems
Racks
Other Mechanical Infrastructure
General Construction Core and Shell Development
Installation and Commissioning
Design Engineering
Fire, Security and Safety Systems
DCIM / BMS Solutions
By Tier Standard
Tier III
Tier IV
By End-user Industry
Cloud and IT
Telecom
Media and Entertainment
Government
BFSI
Manufacturing
E-Commerce
Other End Users
By Data Center Size
Large (Less than equal to 25 MW)
Massive (Greater than 25 MW and less than equal to 60 MW)
Mega (Greater than 60 MW)
By Geography
Northeast US
Midwest US
South US
West US
By Data Center Type Hyperscale Self-build
Hyperscale Colocation
By Component IT Infrastructure Server Infrastructure
Storage Infrastructure
Network Infrastructure
Electrical Infrastructure Power Distribution Unit
Transfer Switches and Switchgears
UPS Systems
Generators
Other Electrical Infrastructure
Mechanical Infrastructure Cooling Systems
Racks
Other Mechanical Infrastructure
General Construction Core and Shell Development
Installation and Commissioning
Design Engineering
Fire, Security and Safety Systems
DCIM / BMS Solutions
By Tier Standard Tier III
Tier IV
By End-user Industry Cloud and IT
Telecom
Media and Entertainment
Government
BFSI
Manufacturing
E-Commerce
Other End Users
By Data Center Size Large (Less than equal to 25 MW)
Massive (Greater than 25 MW and less than equal to 60 MW)
Mega (Greater than 60 MW)
By Geography Northeast US
Midwest US
South US
West US
Need A Different Region or Segment?
Customize Now

Key Questions Answered in the Report

How fast is the United States hyperscale data center market growing?

The market is projected to expand from USD 37.37 billion in 2025 to USD 245.09 billion by 2031 at a 36.82% CAGR, driven mainly by AI infrastructure demand.

Which region will post the highest growth?

The West US is forecast to lead with a 13.30% CAGR through 2030 thanks to Arizona’s AI-centric build incentives and abundant land availability.

Why are rack-power densities increasing?

AI and machine-learning workloads require GPU-intensive racks exceeding 50 kW, prompting adoption of liquid cooling and higher-voltage power distribution.

What is the main challenge to capacity expansion?

GPU and optical transceiver supply shortages have extended delivery times up to 18 months, delaying 2.5 GW of planned capacity.

How are operators addressing sustainability regulations?

Strategies include closed-loop cooling to curb water use, nuclear or renewable PPAs to cut carbon footprints, and advanced DCIM tools for real-time efficiency optimization.

Which facility tier is gaining traction for AI workloads?

Tier IV builds are rising at 11.4% CAGR because fault-tolerant architectures minimize costly interruptions during long AI training jobs.

Page last updated on: