List of data centers in South Africa by city, operator and project status
South Africa runs 528.04 MW of tracked data center IT load today, and Data Center Intelligence tracks 668.18 MW of expected IT load under construction, announced or planned. This page sizes the market, maps the hotspots, sets out who runs colocation and cloud capacity and how operators cool it, and lists the projects that arrive next.
Published November 25, 2026
- 78
- Records tracked
- 528.04 MW
- Operating IT load
- 668.18 MW
- Expected IT load
- 63
- Checked live buildings
Mordor Intelligence, Data Center Intelligence research team. DCI South Africa records, November 2026.
| Data Center Operator | Data Center Facility | City | Status | Operational IT load Capacity |
|---|---|---|---|---|
| Digital Parks Africa (PTY) LTD. | ZA - Samrand Datacentre | Gauteng | Commissioned | 18 MW |
| NTT DATA GROUP Corporation | Bryanston Data Center | Gauteng | Commissioned | 1.33 MW |
| Africa Data Centres | CPT1, Cape Town Data Centre | Cape Town | Commissioned | 9 MW |
| Teraco Data Environments | JB1 (East & West) | Gauteng | Commissioned | 35 MW |
| Amazon Web Services, Inc. | Amazon AWS CPT - Atlantic | Cape Town | Commissioned | 50 MW |
| Teraco Data Environments | JB7 | Gauteng | Under Construction | 30.08 MW (expected Q4 2026) |
How many operating data center buildings are in South Africa?
| Status | Records | IT load (MW) |
|---|---|---|
| Operating | 68 | 528.04 |
| Under Construction | 4 | 52.88 |
| Announced | 4 | 615.30 |
| Planned | 2 | – |
| Total | 78 | 1,196.22 |
Major hotspots: Gauteng leads, Cape Town follows
| City | Records | Checked live | Under construction | Announced | Planned | Operating MW |
|---|---|---|---|---|---|---|
| Gauteng (all) | 44 | 34 | 4 | 3 | 0 | 375.6 |
| Johannesburg | 32 | 24 | 3 | 2 | 0 | 282.7 |
| Centurion | 6 | 4 | 1 | 1 | 0 | 54.9 |
| Midrand | 2 | 2 | 0 | 0 | 0 | 2.0 |
| Ekurhuleni | 1 | 1 | 0 | 0 | 0 | 19.0 |
| Kempton Park | 1 | 1 | 0 | 0 | 0 | 13.0 |
| Samrand | 1 | 1 | 0 | 0 | 0 | 3.0 |
| Sandton | 1 | 1 | 0 | 0 | 0 | 1.0 |
| Cape Town (incl. Bellville) | 23 | 20 | 0 | 1 | 1 | 139.0 |
| Durban (incl. Umhlanga) | 9 | 7 | 0 | 0 | 1 | 10.7 |
| Bloemfontein | 1 | 1 | 0 | 0 | 0 | 1.5 |
| Gqeberha | 1 | 1 | 0 | 0 | 0 | 1.3 |
| Total | 78 | 63 | 4 | 4 | 2 | 528.0 |
Outside Gauteng and Cape Town, the list thins out. Durban has 9 records but only 10.7 MW running, and its largest prospect is a planned campus with no operator recorded. Cape Town has 1 announced record, Cosmas Data Cities Cape Town DC1, at 360.0 MW, matching the one Cape Town campus Cavaleros has announced. Its planned record is an Equinix site with no recorded capacity.
Largest operating data centers in Gauteng
| Facility | Operator | City | IT load (MW) | Tier type recorded | kW/rack | Power redundancy | Opened |
|---|---|---|---|---|---|---|---|
| ADC JHB2 Samrand | Africa Data Centre | Centurion | 35.0 | Tier 4 | 7 | N+1 | 2018 |
| Teraco JB3 | Teraco | Johannesburg | 35.0 | Tier 3 | 7.5 | N+1 | 2021 |
| Teraco JB1 (East and West) | Teraco | Johannesburg | 35.0 | Tier 3 | 4 | N+1 | 2010 |
| Teraco JB5 | Teraco | Johannesburg | 22.1 | Tier 3 | 14 | 2N | 2025 |
| Vantage JNB2 | Vantage | Johannesburg | 20.0 | Tier 4 | 14 | N+1 | 2025 |
| Teraco JB4 | Teraco | Ekurhuleni | 19.0 | Tier 3 | 20 | 2N | 2022 |
| Digital Parks Africa ZA-Samrand | Digital Parks Africa | Centurion | 18.0 | Tier 3 | 4 | 2N | 2017 |
| Vantage JNB1, building 2 | Vantage | Johannesburg | 16.0 | Tier 4 | 6 | N+1 | 2024 |
| Vantage JNB1, building 1 | Vantage | Johannesburg | 16.0 | Tier 4 | 6 | N+1 | 2022 |
Colocation, cloud and cooling in South Africa
Colocation operators run the market
| Operator | Records | Areas | Operating | Pipeline | Total |
|---|---|---|---|---|---|
| Cavaleros (Cosmas Data Cities) | 2 | Cape Town, Gauteng | 0.0 | 560.0 | 560.0 |
| Teraco | 11 | Cape Town, Durban, Gauteng | 111.1 | 30.1 | 141.2 |
| Africa Data Centres | 6 | Cape Town, Gauteng | 103.0 | 5.0 | 108.0 |
| Vantage | 4 | Gauteng | 52.0 | 16.0 | 68.0 |
| AWS | 1 | Cape Town | 50.0 | 0.0 | 50.0 |
| Microsoft | 1 | Gauteng | 0.0 | 50.0 | 50.0 |
| BCX | 4 | Durban, Gauteng | 24.1 | 0.0 | 24.1 |
| NTT DATA | 9 | Bloemfontein, Cape Town, Durban, Gauteng, Gqeberha | 22.8 | 0.0 | 22.8 |
| Digital Parks Africa | 2 | Gauteng | 21.0 | 0.0 | 21.0 |
| Open Access Data Centres | 4 | Cape Town, Durban, Gauteng | 15.3 | 0.0 | 15.3 |
Cloud providers: one operating, one announced
Which Gauteng facilities meet the buyer’s rack density and cooling technology needs?
| Facility | City | kW/rack | Power redundancy | Cooling redundancy | Cooling method |
|---|---|---|---|---|---|
| Teraco JB4 | Ekurhuleni | 20 | 2N | N+1 | Chilled water, free-air cooling; liquid-to-liquid cooling enabled |
| ADC CPT2 (expansion) | Cape Town | 18 | 2N | N+1 | – |
| Equinix JN1 Phase 2 (under construction, 2027) | Johannesburg | 16.5 | N+1 | N+2 | – |
| ADC JHB1 Midrand Phase 1 | Johannesburg | 15.2 | N+1 | N+1 | Hot-aisle/cold-aisle containment |
| ADC JHB1 Midrand (probable duplicate record) | Johannesburg | 15 | N+1 | N+1 | Hot-aisle/cold-aisle containment |
| Visa South Africa DC1 | Johannesburg | 15 | 2N | N+1 | – |
| Teraco JB5 | Johannesburg | 14 | 2N | N+1 | Chilled water with free-air cooling |
| Teraco CT2 Phase 2 | Cape Town | 14 | N+1 | N+1 | Chilled water with free-air cooling |
| Vantage JNB2 | Johannesburg | 14 | N+1 | N+2 | Chilled water with air-cooled chillers and economizer |
| DPA Samrand | Samrand | 14 | N+1 | N+1 | Dual-circuit cooling |
| AWS Cape Town (Atlantic) | Cape Town | 12 | N+1 | N+1 | – |
One site passes. Teraco JB4 in Ekurhuleni is the only operating colocation facility in Gauteng that meets all three requirements on DCI-recorded values. Those three values are DCI estimates: Teraco’s published material confirms a 30 MW Phase 2 of six 5 MW halls with liquid-to-liquid cooling, but does not publish rack density or redundancy for the phase. ADC CPT2 in Cape Town meets the density and redundancy criteria but fails on geography, and DCI records UPS-only backup power for it. Teraco JB5 and Vantage JNB2 fall just below the density threshold at 14 kW, while ADC JHB1 Midrand meets the density requirement but records only N+1 power. Equinix JN1 Phase 2 (16.5 kW) is still under construction and records N+1 power. Visa South Africa DC1 meets the technical criteria but fails as an enterprise facility rather than a colocation option; its capacity, density and redundancy values are DCI estimates, as Visa has not published them.
Resilience and efficiency
| Certification recorded | Records |
|---|---|
| ISO 27001 (information security) | 75 |
| PCI DSS (payment card security) | 54 |
| ISO 50001 (energy management) | 32 |
| ISAE 3402 or similar assurance report | 27 |
| ISO 14001 (environment) | 25 |
| ISO 22301 (business continuity) | 21 |
| SOC 1 or SOC 2 report | 8 |
| TIA-942 Rated-3 (operator-stated) | 5 |
Backup power. 74 records list generators plus UPS. Three list UPS only: ADC CPT2 (expansion), Xneelo Samrand DC1 and Xneelo Samrand DC2. Buyers should ask each operator for generator autonomy in hours and fuel contract terms, which DCI does not record.
Efficiency. Of the 68 operating records, 28 carry a site-specific PUE, ranging from 1.36 to 1.58 with a median of 1.44. Equinix JN1 Phase 2, under construction, records a design PUE of 1.30, which is not included. The remaining 40 operating records use a DCI estimate of 1.55 for older or smaller sites. These estimates are excluded from the range and median and have not been independently verified. Buyers should compare facilities on measured PUE, allowing for differences in measurement periods and operating conditions.
Future developments: phased builds and the calendar
The next additions
Phased and modular builds raise density
| Campus | Phase or building | Status | IT load (MW) | Year | Tier type recorded | kW/rack | Power/cooling redundancy |
|---|---|---|---|---|---|---|---|
| Equinix JN1 | Equinix JN1 Phase 1 | Operating | 2.7 | 2024 | Tier 4 | 6 | N+1 / N+1 |
| Equinix JN1 | Equinix JN1 Phase 2 | Under Construction | 5.3 | 2027 | Tier 4 | 16.5 | N+1 / N+2 |
| Equinix JN1 | Equinix JN1 Phase 3 | Announced | 5.3 | 2028 | Tier 4 | 17 | N+1 / N+1 |
| Vantage JNB1 | Vantage JNB1, building 1 | Operating | 16.0 | 2022 | Tier 4 | 6 | N+1 / N+1 |
| Vantage JNB1 | Vantage JNB1, building 2 | Operating | 16.0 | 2024 | Tier 4 | 6 | N+1 / N+1 |
| Vantage JNB1 | Vantage JNB1, building 3 | Under Construction | 16.0 | 2027 | Tier 4 | 70 | N+1 / N+2 |
| xneelo Samrand | xneelo Samrand DC1 | Operating | 0.9 | 2013 | Tier 3 | 3 | 2N / N+1 |
| xneelo Samrand | xneelo Samrand DC2 | Under Construction | 1.5 | 2026 | Tier 3 | 70 | 2N / N+1 |
Density changes phase by phase. Vantage’s first two JNB1 buildings record 6 kW per rack; the third records 70 kW. Xneelo’s Samrand DC1 records 3 kW; DC2 records 70 kW. Equinix JN1 rises from 6 kW in Phase 1 to 16.5–17 kW in Phases 2 and 3. A campus-level figure hides all of this.
When new capacity arrives
| Year | Under construction, due (MW) | Announced or planned, target (MW) |
|---|---|---|
| 2026 (Q4, forecast) | 31.6 + 5.0 ADC CPT2 expansion | – |
| 2027 (forecast) | 21.3 (Vantage JNB1 building 3 16.0 + Equinix JN1 Phase 2 5.3) | – |
| 2028 (forecast) | – | 615.3 (Cosmas CPT DC1 360.0, Cosmas JHB DC1 200.0*, Microsoft 50.0, Equinix JN1 Phase 3 5.3) |
Two things to watch
- Q4 2026 handovers.Teraco JB7 and Xneelo Samrand DC2 both fall due in the fourth quarter of 2026. Their handover sets Gauteng’s high-density supply for 2027.
- Cosmas Data Cities.The two Cosmas Data Cities records hold 560.0 MW, 91% of announced load, and match the two campuses Cavaleros has announced: Johannesburg (Samrand, 200 MW) and Cape Town (360 MW). The DC2 records that raised a duplication question are no longer in the datasheet, so expected IT load is 668.18 MW. A construction start at either campus will change South Africa’s pipeline more than any other event.
Questions about data centers in South Africa
01
How many data centers are in South Africa?
DCI tracks 78 data center records in South Africa: 68 operating (528.04 MW), 4 under construction (52.88 MW), 4 announced (615.3 MW), and 2 planned (no IT load disclosed).
Which South African city has the most data centers? Johannesburg, within Gauteng. Gauteng holds 44 records and 375.6 MW of operating IT load; Cape Town holds 23 records and 139.0 MW.
02
Who is the largest data center operator in South Africa?
Teraco, with 111.1 MW of operating IT load across 10 operating records in Gauteng, Cape Town and Durban.
03
Which data centers in Johannesburg support high-density racks?
Among operating sites, Teraco JB4 phase 2 records 20 kW per rack, ADC JHB1 Midrand Phase 1 15.2 kW, and Teraco JB5 and Vantage JNB2 14 kW. Vantage’s third JNB1 building, due in 2027, records 70 kW.
04
Which cooling technologies do South African data centers use?
Chilled water dominates the denser halls, often paired with free-air cooling or economizers. Teraco enables liquid-to-liquid cooling at JB4.
05
Who is building South Africa’s new data centers?
DCI records Abbeydale Construction, B2 Architects and EDS Engineers on Teraco JB7, and CKR Consulting Engineers, WBHO Construction and Turner & Townsend on Vantage JNB1’s third building. Microsoft’s Centurion site names no contractors.
06
Does Data Center Intelligence offer a free trial?
Yes. The DCI team starts with a 30-minute walkthrough tailored to your market, then opens a trial for your team.
Explore the South African projects in DCI.
DCI holds the full South African list with filters for city, operator, status, capacity, rack density, redundancy, tier type, and expected year. A demonstration walks through the facilities and projects that match your brief. For a new development, use the DCI site selection tool to compare candidate locations against your project requirements.
Scheduling takes two minutes. No commitment.