Tier 4 data centers in Hong Kong and how to check their certification

Ask whether Hong Kong has a Tier IV data center, and you will hear two answers. DCI records 10 operating facilities at Tier 4, together running 267.6 MW, about a sixth of the city’s IT load. Separately, NTT Hong Kong Financial Data Center holds Uptime Institute Tier IV Certification of Design Documents, awarded on 3 June 2014. DCI records its tier as Tier 2; the design award and DCI classification are separate fields.

Published November 25, 2026

10 sites, 267.6 MW
Recorded Tier 4, operating
4 projects, 120.9 MW
Recorded Tier 4, pipeline
1
Uptime Tier IV awards on record
1 (Equinix HK6)
Tier 4 sites with confirmed liquid cooling

Mordor Intelligence, Data Center Intelligence research team. Facility checks November 2026.

Key takeaways

  • Tier 4 by record, not by certificate.
    Hong Kong’s 10 Tier 4 facilities are Tier 4 in their design records; NTT Hong Kong Financial Data Center separately holds a Tier IV design award in DCI’s records.
  • One design award is recorded.
    NTT Hong Kong Financial Data Center holds Tier IV Certification of Design Documents from Uptime Institute.
  • AI-ready Tier 4 space is scarce today.
    Only Equinix HK6 has confirmed liquid cooling.
  • High density arrives from 2027.
    All four Tier 4 projects in the pipeline are designed for 60–100 kW per rack.

Tier IV, Rated 4 and “Tier 4”: what the labels mean

Uptime Institute’s Tier Standard defines four levels. Tier I provides basic capacity with a single path for power and cooling. Tier II adds redundant capacity components. Tier III is concurrently maintainable: any component can be taken out for maintenance without shutting down IT load. Tier IV is fault-tolerant: the failure of any single component or path does not interrupt IT load, which, in practice, means independent, simultaneously active power and cooling paths.
Three different things are often referred to as “Tier 4”. An Uptime Tier IV award is issued for a specific building, separately for its design, its constructed facility, and its operations. TIA-942 is a separate standard that rates facilities from Rated 1 to Rated 4. A recorded or marketed tier is the design level an operator states for a building. Only the first is a third-party Tier IV certification, which is why the difference matters to a buyer paying for fault tolerance.

Does Hong Kong have Tier 4 data centers?

On design records, yes: DCI records 10 of Hong Kong’s 95 operating data centers at Tier 4, with 267.6 MW of IT load. For certification, DCI records Tier IV Certification of Design Documents for NTT Hong Kong Financial Data Center. Most of the facilities hold ISO 27001 and ISO 9001, AsiaSat’s Tai Po DC1 holds ISO/IEC 27001, and BDx’s HKG8 holds PCI DSS, TVRA, ISO 14001, and a TIA-942-C Rated 3 certificate.

Which Hong Kong facilities does DCI list as Tier 4?

Nine operators run these 10 facilities, most of which are colocation sites. They cluster in Tseung Kwan O, Tsuen Wan and Kwai Chung.
Operating Tier 4 facilities, ranked by IT load
Operating Hong Kong data centers recorded as Tier 4, ranked by IT load, checked November 2026.
FacilityOperatorLocalityIT load (MW)OpenedRack density (kW)Power redundancy
The Mega IDCSUNeVisionTseung Kwan O50.0202412N+1
AirTrunk HKG2AirTrunkEast New Territories47.4202420N+1
Tsuen Wan West Campus (1 building)Goodman GroupTsuen Wan38.9202210N+1
Cloud Computing ComplexhkcoloTseung Kwan O32.820113N+1
HK1 Phase 2DayOne (GDS)Kwai Chung32.5Q4 202413N+1
UniCom Global Intelligent – Cloud Data CenterChina Unicom (Hong Kong)Tseung Kwan O27.020166N+1
The Mega GatewaySUNeVisionTsuen Wan14.1202310N+1
HK6EquinixTsuen Wan12.5Q2 20266N+1
HKG8BDxKwai Chung11.320238 avg, 15 maxN+1
Tai Po DC1AsiaSatTai Po1.120115.62N

HKG8 rack density is taken from BDx’s data sheet. Goodman’s Tsuen Wan West campus has three buildings, each rated at 38.9 MW; only one is recorded at Tier 4, so a buyer should match any tier claim to the exact building and phase.

Not on the list: Vantage HKG3

Vantage Data Centers’ Kwai Chung (HKG3) facility often appears in Hong Kong tier comparisons. DCI records it at Tier 3: 14.0 MW of IT load, opened in 2014, with N+1 and N+2 power redundancy, N+1 cooling, and 6.5 kW per rack. It holds ISO 20000, ISO 27001, ISO 9001, ISO 14001, PCI DSS, TVRA and SOC 2.

How much Hong Kong capacity does DCI classify as Tier 4?

Hong Kong’s 95 operating projects run 1,642.6 MW. Tier 3 and Tier 4 account for 70% of that load, while Tier 1 and Tier 2 make up more than half of all sites but only 30% of capacity; many of them are roughly 1-MW enterprise halls run by banks, airlines, and public bodies.
Hong Kong data centers by recorded tier
Hong Kong data centers by recorded tier, checked November 2026.
TierOperating projectsOperating IT load (MW)Under construction (MW)Announced (MW)Share of operating load
Tier 410267.6105.015.916.3%
Tier 330883.1190.165.053.8%
Tier 245344.2––21.0%
Tier 110147.8––9.0%

New capacity is built only for Tier 3 and Tier 4. The pipeline totals 376.0 MW across 11 projects, with Tier 4 accounting for about a third, 120.9 MW across 4 projects.

Which Tier 4 data centers are best suited to AI workloads?

For AI and high-performance computing, the tier label matters less than two design facts: at least 30 kW per rack, and liquid cooling. No operating Tier 4 facility in Hong Kong has both, on current evidence.
Equinix HK6: the only Tier 4 building with confirmed liquid cooling. It opened on 16 June 2026 with direct-to-chip cooling, 1,000 cabinets in its first phase and 3,550 at full build-out. Its recorded 6 kW is a hall average, so ask for the power available on liquid-cooled racks.
DayOne HK1 Phase 2: DayOne has stated that it has liquid cooling for its Kwai Chung campus, but not for this building specifically, and its recorded density is 13 kW.
The rest: BDx’s HKG8 is air-cooled on its own data sheet; AirTrunk’s HKG2 records 20 kW; and the remaining sites record 3–12 kW, with no cooling method published.

Where liquid cooling runs in Hong Kong today

A buyer whose first requirement is liquid cooling, rather than the Tier 4 label, has more choice. Four facilities recorded at Tier 3 or below have published liquid-cooling deployments.
Hong Kong data centers with liquid cooling confirmed by the operator
Hong Kong data centers with liquid cooling confirmed by the operator, checked November 2026.
FacilityOperatorLocalityRecorded tierLiquid cooling
HK6EquinixTsuen WanTier 4Direct-to-chip, opening in June 2026
Hong Kong data center Phase 1Global SwitchTseung Kwan OTier 3Direct-to-chip and rear-door heat exchangers since September 2024; up to 100 kW per rack in demand
Hong Kong IBX HK1EquinixTsuen WanTier 3Liquid cooling added with Schneider Electric, Dell Technologies and CLP in 2025
Financial Datacenter (FDC)NTT DATATseung Kwan OTier 2Direct liquid cooling for HPC above 50 kW per rack, since April 2024
Tai Po Data CenterNTT DATATai PoTier 1Direct liquid cooling for HPC above 50 kW per rack, since April 2024

Planned Tier 4 data center projects in Hong Kong

All four Tier 4 projects in the pipeline are designed for 60–100 kW per rack, and 9 of the 11 projects under construction or announced across all tiers plan 30 kW or more. None of the four Tier 4 operators has yet published a cooling method, although densities at this level point to liquid cooling.
Tier 4 projects under construction and announced
Tier 4 data center projects under construction and announced in Hong Kong, checked November 2026.
ProjectOperatorLocalityStatusIT load (MW)Rack density (kW)Expected
Mega IDC Phase 2SUNeVisionTseung Kwan OUnder construction65.0802027–2028
HKG09Goodman GroupKwai ChungUnder construction28.0602029
Tuen Mun Data CenterTPG Angelo GordonTuen MunAnnounced15.91002028
Tower 3 (Phases 1 and 2)iTech TowersFanlingUnder construction12.0702027

DCI dates Mega IDC Phase 2 to 2027; SUNeVision told shareholders in June 2026 that it is accelerating Phases 2 and 3 toward operation in 2028. Grand Ming Group, which owns iTech Towers, describes Tower 3 as a Tier IV-ready design with 2N power.

The largest project in the wider pipeline is China Telecom Global’s 84.0 MW TKO2 Phase 2 in Tseung Kwan O, a Tier 3 project due in 2026 at 70 kW per rack.

Note: data as of November 2026.

How to check a Tier 4 claim before you sign

  • 01Ask for the award.
    Obtain the Uptime Tier award or design certificate from the operator, and verify that it identifies the exact building and phase you are buying.
  • 02Review the single-line design.
    Confirm that power and cooling paths are genuinely independent, not N+1, before paying a Tier IV premium.
  • 03Confirm cooling and per-rack power.
    For AI workloads, ask for the cooling method and the power available on liquid-cooled racks, not the hall average.
  • 04Confirm space and dates.
    Check that the space and power you need are available on your required dates.

Questions about Tier 4 data centers in Hong Kong

  • 01

    Are there Tier 4 data centers in Hong Kong?

    DCI records 10 operating Hong Kong data centers at Tier 4, with 267.6 MW of IT load, led by SUNeVision’s The Mega IDC and AirTrunk HKG2. NTT Hong Kong Financial Data Center separately holds a Tier IV design award in DCI records.

  • 02

    Does any Hong Kong data center hold Uptime Institute Tier IV certification?

    DCI records Tier IV Certification of Design Documents for NTT Hong Kong Financial Data Center. This is a design award. Buyers should check the award for the exact building and ask separately for certification of the constructed facility.

  • 03

    Which Hong Kong data centers use liquid cooling?

    Five facilities have liquid cooling confirmed by their operators: Equinix HK6 and HK1, Global Switch’s Tseung Kwan O data center, and NTT DATA’s Financial Datacenter and Tai Po Data Center. Only HK6 is recorded at Tier 4.

  • 04

    Is Vantage HKG3 a Tier 4 data center?

    No. DCI records Vantage’s Kwai Chung (HKG3) facility at Tier 3, with 14.0 MW of IT load, N+1 and N+2 power redundancy, and N+1 cooling.

  • 05

    How many data centers are in Hong Kong?

    DCI tracks 106 Hong Kong data center projects run by 52 operators: 95 operating, 9 under construction, and 2 announced.

  • 06

    Does Data Center Intelligence offer a free trial?

    Yes. The DCI team starts with a 30-minute walkthrough tailored to your market, then opens a trial for your team.

Explore the Hong Kong projects in DCI.

DCI holds the full Hong Kong list with filters for locality, operator, status, tier, rack density, and power and cooling redundancy, along with addresses and coordinates for each project. A demonstration walks through the facilities and projects that match your market or supplier brief. For a new development, use the DCI site selection tool to compare candidate locations against your project requirements. For addresses and district coverage across all recorded tiers, see the Hong Kong data center list.

Scheduling takes two minutes. No commitment.