List of data centers in Canada by city, operator and project status
Canada runs 2,213 MW of tracked data center IT load across 218 physical operating buildings, and Data Center Intelligence tracks 10,108 MW more under construction or announced. This page sizes the market, maps the provincial and city hotspots, sets out who builds colocation and cloud capacity and how operators cool it, and names the phases that arrive next.
Published November 20, 2026
- 353
- Records tracked
- 2,213 MW
- Operating IT load
- 10,108 MW
- Pipeline IT load
- 218
- Physical operating buildings
Data checked as of 12 November 2026
How many operating data center buildings are in Canada?
Quebec and Ontario carry the market. Quebec and Ontario run 1,707 MW, 77% of operating IT load. Greater Montreal (731 MW) sits slightly ahead of the Greater Toronto Area (668 MW).
The pipeline is large and moving west. Projects under construction and announced total 10,108 MW, 4.6 times today's operating load, and Alberta and Saskatchewan hold most of it.
Colocation dominates, cloud builds big. DCI classifies 316 records as colocation and 21 as cloud provider sites, and Microsoft builds the largest cloud pipeline at 970 MW.
Density is rising. Operating sites average under 10 kW per rack across 218 of 264 records, while the median phase-under-construction record is 35 kW.
| Facility | Operator | City | Status | IT load |
|---|---|---|---|---|
| TOR-1 data center | eStruxture Data centers Inc. | Toronto | Commissioned | 10 MW |
| Kelowna DC | Hut 8 Corp. | Kelowna | Commissioned | 2.4 MW |
| Etobicoke DC - YYZ2 | Compass Datacenters LLC | Toronto | Commissioned | 30 MW |
| Canal Flats DC | IREN Limited | Canal Flats | Commissioned | 20 MW |
| Quebec City (QC23) Data Center | Vantage Data Centers Management Company, LLC | Quebec | Commissioned | 16 MW |
| Status | Records | IT load (MW) |
|---|---|---|
| Operating | 264 | 2,213.5 |
| Under Construction | 45 | 3,809.0 |
| Announced | 35 | 6,299.1 |
| Planned | 8 | — |
| Cancelled | 1 | — |
| Total | 353 | 12,321.5 |
Most sites are small. The median operating record runs 3.0 MW, with 5 kW per rack, and 30 operating records sit below 1 MW. Of the 93 operating records with a 2016 commissioning year, 23 carry exactly 1.0 MW, which DCI treats as estimates for older, smaller sites rather than measured values.
Data centers in Canada by province and city
Quebec leads on operating load with 979.7 MW, and Ontario leads on record count with 123. Ontario also holds 2,334.0 MW of pipeline, but Alberta now holds the largest pipeline in the country.
| Province or territory | Records | Operating | Under construction | Announced | Operating MW | Pipeline MW |
|---|---|---|---|---|---|---|
| Quebec | 97 | 81 | 13 | 2 | 979.7 | 696.2 |
| Ontario | 123 | 98 | 19 | 5 | 727.5 | 2,334.0 |
| British Columbia | 48 | 41 | 4 | 3 | 244.6 | 526.6 |
| Manitoba | 10 | 8 | 0 | 0 | 122.7 | 0.0 |
| Alberta | 48 | 25 | 7 | 13 | 75.9 | 4,027.8 |
| New Brunswick | 4 | 4 | 0 | 0 | 53.5 | 0.0 |
| Nova Scotia | 5 | 4 | 0 | 1 | 8.2 | 331.8 |
| Saskatchewan | 14 | 2 | 2 | 9 | 1.2 | 2,190.2 |
| Prince Edward Island | 1 | 1 | 0 | 0 | 0.2 | 0.0 |
| Location not recorded | 1 | 0 | 0 | 0 | 0.0 | 0.0 |
| Northwest Territories | 2 | 0 | 0 | 2 | 0.0 | 1.5 |
| Total | 353 | 264 | 45 | 35 | 2,213.5 | 10,108.0 |
At city level, Greater Montreal and the Greater Toronto Area together hold 63% of national operating load. The Greater Toronto Area adds 1,183.6 MW of pipeline and the Quebec City area 532.0 MW, while Greater Montreal adds only 72.2 MW.
| Metro area or city | Records | Operating | Operating MW | Share of national | Pipeline MW |
|---|---|---|---|---|---|
| Greater Montreal | 64 | 60 | 731.4 | 33% | 72.2 |
| Greater Toronto Area | 98 | 81 | 667.8 | 30% | 1,183.6 |
| Winnipeg | 10 | 8 | 122.7 | 6% | 0.0 |
| Metro Vancouver | 28 | 26 | 96.8 | 4% | 32.5 |
| Quebec City area | 14 | 8 | 81.0 | 4% | 532.0 |
| Sherbrooke | 6 | 3 | 64.0 | 3% | 64.0 |
| Calgary area | 14 | 12 | 54.8 | 2% | 60.0 |
| Mackenzie | 1 | 1 | 50.0 | 2% | 0.0 |
| Saint-André | 1 | 1 | 47.0 | 2% | 0.0 |
| Kamloops | 7 | 5 | 39.4 | 2% | 27.9 |
The pipeline is moving west. Alberta runs only 75.9 MW today but holds 3,744 MW of announced projects, mostly large power-led campuses around Edmonton (2,078 MW in the Edmonton area). Saskatchewan runs 1.2 MW and holds 2,190.2 MW in the pipeline, with all of it in Bell Canada's Regina-area records.
Colocation, cloud and cooling in Canadian data centers
Leading colocation operators in Canada
DCI classifies 316 records as colocation, 21 as cloud provider sites, 5 as enterprise sites and 4 as edge sites. Some of the top colocation operators are Vantage, Equinix, eStruxture, Les.net, Keel Infrastructure, IREN, and Cologix. Equinix and Cologix have the widest footprints, with 16 and 23 operating records, respectively.
| Operator | Operating records | Provinces | Operating MW | Share | Pipeline MW |
|---|---|---|---|---|---|
| Vantage | 9 | Quebec | 173.0 | 8% | 32.0 |
| Equinix | 16 | Alberta, British Columbia, Manitoba, New Brunswick, Ontario, Quebec | 136.6 | 6% | 0.0 |
| eStruxture | 15 | Alberta, British Columbia, Ontario, Quebec | 129.1 | 6% | 60.0 |
| Les.net | 5 | Manitoba | 108.7 | 5% | 0.0 |
| Keel Infrastructure | 8 | Quebec | 106.0 | 5% | 92.0 |
| IREN | 3 | British Columbia | 101.0 | 5% | 0.0 |
| Cologix | 23 | British Columbia, Ontario, Quebec | 99.7 | 5% | 0.0 |
| Brookfield Infrastructure | 2 | Ontario, Quebec | 87.0 | 4% | 0.0 |
| Summit Hosting | 1 | Ontario | 84.0 | 4% | 0.0 |
Cloud providers anchor Montreal, Toronto and Quebec City
AWS operates its YUL55 campus in Varennes, with more than 50 MW of capacity across two buildings. Microsoft runs 40 MW at its Mont-Royal site and builds the largest cloud pipeline in the country: Etobicoke (250 MW) and two YTO14 Markham phases (120 MW each) for Q4 2026, plus four Quebec City-area phases of 120 MW each for 2027 to 2029. Oracle runs two small sites that DCI records as enterprise, 5 MW in Montreal and 3 MW in Markham. DCI records no Google-owned building in Canada.
Which Canadian colocation sites meet the rack and backup power requirements?
Today's operating sites run at low density: 218 of 264 operating records average under 10 kW per rack, and only 19 record 15 kW or more. The pipeline breaks from that pattern, with the median phase under construction at 35 kW per rack. Redundancy remains basic: 237 operating records list N+1 power; only 17 list 2N, and 9 list N+2.
Among the denser operating sites, operators use a mix of cooling technologies. Bit Digital runs direct liquid cooling for AI workloads at MTL3 in Montreal; DMG Blockchain runs hydro-powered direct liquid cooling at Christina Lake; and OVHcloud runs server-level water cooling at TOR1 in Cambridge. Vantage runs closed-loop chillers with air cooling at Montreal III and outside-air free cooling at QC23 in Quebec City, and Equinix runs free cooling with hot- and cold-aisle containment at MT1 and MT2.
Testing one buyer brief: an operating colocation hall in the Greater Toronto Area or Greater Montreal with current IT load, an average of at least 15 kW per rack, power redundancy better than N+1 (2N or N+2) and N+1 or better cooling redundancy.
| Facility | City | kW/rack | Power redundancy | Cooling redundancy | Cooling method |
|---|---|---|---|---|---|
| Qu Data Centres - DC1 | Calgary | 80 | N+1 | N+1 | — |
| Qu Data Centres - DC2 | Edmonton | 80 | N+1 | N+1 | — |
| Bell Canada Merritt DC | Merritt | 80 | N+1 | N+1 | Chiller-based cooling |
| Vantage Montreal III (QC61) Data Center | Pointe-Claire | 60 | N+1 | N+1 | Closed-loop chillers and air cooling |
| Bell Canada Kamloops DC1 | Kamloops | 60 | N+1 | N+1 | — |
| Bit Digital MTL3 DC | Montreal | 60 | N+1 | N+1 | Direct liquid cooling for AI workloads |
| Wiikwemkoong Unceded Territory DC1 | Wiikwemkoong Unceded Territory | 60 | N+1 | N+1 | — |
| Compass Datacenters ROOT Montreal MTL-R2 | Montreal | 40 | N+1 | N+1 | — |
| Nordik Data Centers NDC1 | Shawinigan | 40 | N+1 | N+1 | — |
| DMG Blockchain Christina Lake DC1 | Christina Lake | 35 | N+1 | N+1 | Hydro direct liquid cooling deployed for servers |
| Related Companies Canada DC1 | Cambridge | 25 | N+1 | N+1 | — |
| Tech Futures Vancouver (YVR1) DC | Vancouver | 20 | N+1 | N+1 | — |
| Vantage Quebec City (QC23) Data Center | Quebec City | 16 | N+2 | N+1 | Outside-air free cooling and hot-aisle/cold-aisle containment |
| Enovum MTL02 DC | Pointe-Claire | 16 | 2N | N+1 | — |
| Cologix TOR5 | Markham | 16 | N+1 | N+1 | — |
| Keel Infrastructure Magog DC - Phase 2 | Magog | 15 | N+1 | N+1 | — |
| OVHcloud TOR1 Data Center | Cambridge | 15 | 2N | N+1 | Server-level water cooling |
| Equinix MT2 Montreal IBX Data Center | Vaudreuil-Dorion | 9 | 2N | N+2 | Free cooling and hot/cold-aisle containment; exact cooling plant not disclosed |
| Equinix MT1 Montreal IBX Data Center | Montreal | 5 | 2N | N+2 | Free cooling and hot/cold-aisle containment; exact cooling plant not disclosed |
Canadian data center projects and expected opening dates
Where new investment goes
Bell Canada holds the largest pipeline at 2,596.01 MW, and power-led developers in Alberta follow: Capital Power, Beacon Data Centres, Meta and Synapse Data Center. DCI records USD 13.6 billion of pipeline investment for Capital Power and USD 10.8 billion for Microsoft. DCI monitors Bell's Saskatchewan records daily for published updates: they total 2,190.2 MW, including 984.8 MW for Building 2 alone. DCI records Bell's Kamloops DC1 as operating at 22 MW and 60 kW per rack.
| Operator | Provinces | Operating MW | Pipeline MW | Recorded pipeline investment (USD bn) |
|---|---|---|---|---|
| Bell Canada | British Columbia, Saskatchewan | 22.0 | 2,596.01 | 10.6 |
| Capital Power | Alberta | 0.0 | 1,245.0 | 13.6 |
| Microsoft | Ontario, Quebec | 40.0 | 970.0 | 10.8 |
| Beacon Data Centres | Alberta | 0.0 | 952.4 | 9.3 |
| Meta | Alberta | 0.0 | 833.3 | 9.2 |
| Synapse Data Center | Alberta | 0.0 | 792.2 | 7.7 |
| Red Jar Energy Partners | Ontario | 0.0 | 650.4 | 6.7 |
| Prologis | Ontario | 0.0 | 396.0 | 4.1 |
| EverWind | Nova Scotia | 0.0 | 331.8 | 8.0 |
| HIVE Digital | New Brunswick, Ontario, Quebec | 72.0 | 246.2 | 2.3 |
Under construction: phases of 20 MW or more and their suppliers
Operators build 45 phases that add 3,809 MW. Of these, 25 are 20 MW or larger and together add 3,614 MW, 95% of the construction pipeline. Only 13 name a contractor. Suppliers can use the table below as a target list: phases with named firms show whom to approach, and phases with none recorded have no verified contractor named in DCI.
Phases of 20 MW IT or more under construction, with phase dates and recorded contractors.
| Phase | City | Expected IT load (MW) | Expected date | Contractor recorded | Role |
|---|---|---|---|---|---|
| Microsoft Etobicoke DC | Toronto | 250.0 | Q4 2026 | Syska Hennessy Group Inc. | Engineering consultant (mechanical, electrical) |
| Bell Canada British Columbia DC3 | City not recorded | 175.0 | 2028 | TrueNorth Sustainable Infrastructure Inc. | Development partner; role not confirmed |
| Microsoft Lévis DC | Lévis | 120.0 | 2029 | Pomerleau Construction | General contracting and Civil Engineering |
| Microsoft L'Ancienne-Lorette DC | L'Ancienne-Lorette | 120.0 | 2027 | Construction Dinamo Inc. | General Contracting & Construction Management |
When is new data center capacity due in Canada?
IT load due by year (MW).
| Year | Under construction, due (MW) | Announced, target (MW) |
|---|---|---|
| 2027 | 1,971.8 | 776.7 |
| 2028 | 648.7 | 1,349.5 |
| 2029 | 524.1 | 1,049.8 |
| 2030 | — | 2,717.4 |
| 2031 | — | 242.4 |
| 2032 | — | 121.2 |
Construction more than doubles the market. If every construction date holds, Canada's operating IT load reaches 6,022 MW, 2.7 times today. Excluding Bell's Saskatchewan Building 2, construction still adds 2,824 MW, 128% of today's load.
Three things to watch
- 01Q4 2026 handovers.
13 phases totaling 664 MW fall due in Q4 2026, led by Microsoft's Etobicoke and YTO14 phases. Their handover sets GTA supply for 2027.
- 02Bell Canada in Saskatchewan.
Bell's Saskatchewan records hold 22% of Canada's pipeline. Changes to these phase sizes can affect the national total.
- 03Alberta's announced campuses.
Alberta's 3,744 MW of announced projects show no construction start in DCI. Construction starts will show how much becomes real.
Questions about data centers in Canada
01
How many data centers are in Canada?
DCI tracks 353 data center records in Canada: 264 operating, 45 under construction, 35 announced, 8 planned, and 1 canceled. The operating records describe 218 physical buildings once DCI removes duplicates and tenant listings.
02
Which Canadian city has the most data centers?
The Greater Toronto Area has the most records (98, 81 operating). Greater Montreal runs slightly more operating IT load: 731 MW versus 668 MW.
03
Who is the largest data center operator in Canada?
By operating IT load, Vantage Data Centers Management Company, LLC leads with more than 170 MW recorded capacity. Equinix and Cologix run the most sites: 16 and 23, respectively.
04
Which Canadian data centers use liquid cooling?
Among operating sites, DCI records direct liquid cooling at Bit Digital MTL3 in Montreal, hydro direct liquid cooling at DMG Blockchain Christina Lake and server-level water cooling at OVHcloud TOR1 in Cambridge.
05
Who is building Canada's new data centers?
DCI records Syska Hennessy Group on Microsoft Etobicoke DC Campus, Bird Construction on eStruxture CAL-3, Pomerleau on Vantage QC24, Corgan and Global Design and Construction on Yondr TOR1, T5 Data Centers on Keel's Lager Phase 2, and TrueNorth Sustainable Infrastructure on Bell's British Columbia sites.
06
Does Data Center Intelligence offer a free trial?
Yes. The DCI team starts with a 30-minute walkthrough tailored to your market, then opens a trial for your team.
Explore the full Canada data center list in DCI
DCI holds the full Canadian list with filters for province, city, operator, status, capacity, rack density, redundancy, tier type, contractor, and expected year. A demonstration walks through the facilities and projects that match your brief.
Scheduling takes two minutes. No commitment.