Mordor Intelligence Logo
Login

List of data centers in Canada by city, operator and project status

Canada runs 2,213 MW of tracked data center IT load across 218 physical operating buildings, and Data Center Intelligence tracks 10,108 MW more under construction or announced. This page sizes the market, maps the provincial and city hotspots, sets out who builds colocation and cloud capacity and how operators cool it, and names the phases that arrive next.

Published November 20, 2026

353
Records tracked
2,213 MW
Operating IT load
10,108 MW
Pipeline IT load
218
Physical operating buildings

Data checked as of 12 November 2026

How many operating data center buildings are in Canada?

Quebec and Ontario carry the market. Quebec and Ontario run 1,707 MW, 77% of operating IT load. Greater Montreal (731 MW) sits slightly ahead of the Greater Toronto Area (668 MW).

The pipeline is large and moving west. Projects under construction and announced total 10,108 MW, 4.6 times today's operating load, and Alberta and Saskatchewan hold most of it.

Colocation dominates, cloud builds big. DCI classifies 316 records as colocation and 21 as cloud provider sites, and Microsoft builds the largest cloud pipeline at 970 MW.

Density is rising. Operating sites average under 10 kW per rack across 218 of 264 records, while the median phase-under-construction record is 35 kW.

Selected data centers in Canada
Mordor Intelligence, Data Center Intelligence research team. DCI Canada records, November 2026.
FacilityOperatorCityStatusIT load
TOR-1 data centereStruxture Data centers Inc.TorontoCommissioned10 MW
Kelowna DCHut 8 Corp.KelownaCommissioned2.4 MW
Etobicoke DC - YYZ2Compass Datacenters LLCTorontoCommissioned30 MW
Canal Flats DCIREN LimitedCanal FlatsCommissioned20 MW
Quebec City (QC23) Data CenterVantage Data Centers Management Company, LLCQuebecCommissioned16 MW
Canadian data center records by status.
Canadian data center records by status, as of 12 November 2026.
StatusRecordsIT load (MW)
Operating2642,213.5
Under Construction453,809.0
Announced356,299.1
Planned8—
Cancelled1—
Total35312,321.5

Most sites are small. The median operating record runs 3.0 MW, with 5 kW per rack, and 30 operating records sit below 1 MW. Of the 93 operating records with a 2016 commissioning year, 23 carry exactly 1.0 MW, which DCI treats as estimates for older, smaller sites rather than measured values.

Data centers in Canada by province and city

Quebec leads on operating load, Alberta leads the pipeline

Quebec leads on operating load with 979.7 MW, and Ontario leads on record count with 123. Ontario also holds 2,334.0 MW of pipeline, but Alberta now holds the largest pipeline in the country.

Canadian data center records by province.
Canadian data center records by province, as of 12 November 2026.
Province or territoryRecordsOperatingUnder constructionAnnouncedOperating MWPipeline MW
Quebec9781132979.7696.2
Ontario12398195727.52,334.0
British Columbia484143244.6526.6
Manitoba10800122.70.0
Alberta482571375.94,027.8
New Brunswick440053.50.0
Nova Scotia54018.2331.8
Saskatchewan142291.22,190.2
Prince Edward Island11000.20.0
Location not recorded10000.00.0
Northwest Territories20020.01.5
Total35326445352,213.510,108.0
The ten largest metro areas by operating IT load.

At city level, Greater Montreal and the Greater Toronto Area together hold 63% of national operating load. The Greater Toronto Area adds 1,183.6 MW of pipeline and the Quebec City area 532.0 MW, while Greater Montreal adds only 72.2 MW.

The ten largest Canadian metro areas, ranked by operating IT load.
Metro area or cityRecordsOperatingOperating MWShare of nationalPipeline MW
Greater Montreal6460731.433%72.2
Greater Toronto Area9881667.830%1,183.6
Winnipeg108122.76%0.0
Metro Vancouver282696.84%32.5
Quebec City area14881.04%532.0
Sherbrooke6364.03%64.0
Calgary area141254.82%60.0
Mackenzie1150.02%0.0
Saint-André1147.02%0.0
Kamloops7539.42%27.9

The pipeline is moving west. Alberta runs only 75.9 MW today but holds 3,744 MW of announced projects, mostly large power-led campuses around Edmonton (2,078 MW in the Edmonton area). Saskatchewan runs 1.2 MW and holds 2,190.2 MW in the pipeline, with all of it in Bell Canada's Regina-area records.

Colocation, cloud and cooling in Canadian data centers

Leading colocation operators in Canada

DCI classifies 316 records as colocation, 21 as cloud provider sites, 5 as enterprise sites and 4 as edge sites. Some of the top colocation operators are Vantage, Equinix, eStruxture, Les.net, Keel Infrastructure, IREN, and Cologix. Equinix and Cologix have the widest footprints, with 16 and 23 operating records, respectively.

Largest operators by operating IT load.
The nine largest Canadian operators, ranked by operating IT load.
OperatorOperating recordsProvincesOperating MWSharePipeline MW
Vantage9Quebec173.08%32.0
Equinix16Alberta, British Columbia, Manitoba, New Brunswick, Ontario, Quebec136.66%0.0
eStruxture15Alberta, British Columbia, Ontario, Quebec129.16%60.0
Les.net5Manitoba108.75%0.0
Keel Infrastructure8Quebec106.05%92.0
IREN3British Columbia101.05%0.0
Cologix23British Columbia, Ontario, Quebec99.75%0.0
Brookfield Infrastructure2Ontario, Quebec87.04%0.0
Summit Hosting1Ontario84.04%0.0

Cloud providers anchor Montreal, Toronto and Quebec City

AWS operates its YUL55 campus in Varennes, with more than 50 MW of capacity across two buildings. Microsoft runs 40 MW at its Mont-Royal site and builds the largest cloud pipeline in the country: Etobicoke (250 MW) and two YTO14 Markham phases (120 MW each) for Q4 2026, plus four Quebec City-area phases of 120 MW each for 2027 to 2029. Oracle runs two small sites that DCI records as enterprise, 5 MW in Montreal and 3 MW in Markham. DCI records no Google-owned building in Canada.

Which Canadian colocation sites meet the rack and backup power requirements?

Today's operating sites run at low density: 218 of 264 operating records average under 10 kW per rack, and only 19 record 15 kW or more. The pipeline breaks from that pattern, with the median phase under construction at 35 kW per rack. Redundancy remains basic: 237 operating records list N+1 power; only 17 list 2N, and 9 list N+2.

Among the denser operating sites, operators use a mix of cooling technologies. Bit Digital runs direct liquid cooling for AI workloads at MTL3 in Montreal; DMG Blockchain runs hydro-powered direct liquid cooling at Christina Lake; and OVHcloud runs server-level water cooling at TOR1 in Cambridge. Vantage runs closed-loop chillers with air cooling at Montreal III and outside-air free cooling at QC23 in Quebec City, and Equinix runs free cooling with hot- and cold-aisle containment at MT1 and MT2.

Testing one buyer brief: an operating colocation hall in the Greater Toronto Area or Greater Montreal with current IT load, an average of at least 15 kW per rack, power redundancy better than N+1 (2N or N+2) and N+1 or better cooling redundancy.

Operating sites recording 15 kW per rack or more, plus Equinix MT1 and MT2, tested against the brief.
FacilityCitykW/rackPower redundancyCooling redundancyCooling method
Qu Data Centres - DC1Calgary80N+1N+1—
Qu Data Centres - DC2Edmonton80N+1N+1—
Bell Canada Merritt DCMerritt80N+1N+1Chiller-based cooling
Vantage Montreal III (QC61) Data CenterPointe-Claire60N+1N+1Closed-loop chillers and air cooling
Bell Canada Kamloops DC1Kamloops60N+1N+1—
Bit Digital MTL3 DCMontreal60N+1N+1Direct liquid cooling for AI workloads
Wiikwemkoong Unceded Territory DC1Wiikwemkoong Unceded Territory60N+1N+1—
Compass Datacenters ROOT Montreal MTL-R2Montreal40N+1N+1—
Nordik Data Centers NDC1Shawinigan40N+1N+1—
DMG Blockchain Christina Lake DC1Christina Lake35N+1N+1Hydro direct liquid cooling deployed for servers
Related Companies Canada DC1Cambridge25N+1N+1—
Tech Futures Vancouver (YVR1) DCVancouver20N+1N+1—
Vantage Quebec City (QC23) Data CenterQuebec City16N+2N+1Outside-air free cooling and hot-aisle/cold-aisle containment
Enovum MTL02 DCPointe-Claire162NN+1—
Cologix TOR5Markham16N+1N+1—
Keel Infrastructure Magog DC - Phase 2Magog15N+1N+1—
OVHcloud TOR1 Data CenterCambridge152NN+1Server-level water cooling
Equinix MT2 Montreal IBX Data CenterVaudreuil-Dorion92NN+2Free cooling and hot/cold-aisle containment; exact cooling plant not disclosed
Equinix MT1 Montreal IBX Data CenterMontreal52NN+2Free cooling and hot/cold-aisle containment; exact cooling plant not disclosed

Canadian data center projects and expected opening dates

Where new investment goes

Bell Canada holds the largest pipeline at 2,596.01 MW, and power-led developers in Alberta follow: Capital Power, Beacon Data Centres, Meta and Synapse Data Center. DCI records USD 13.6 billion of pipeline investment for Capital Power and USD 10.8 billion for Microsoft. DCI monitors Bell's Saskatchewan records daily for published updates: they total 2,190.2 MW, including 984.8 MW for Building 2 alone. DCI records Bell's Kamloops DC1 as operating at 22 MW and 60 kW per rack.

The ten largest pipelines: where new investment is going.
The ten operators with the largest recorded pipelines in Canada, by IT load.
OperatorProvincesOperating MWPipeline MWRecorded pipeline investment (USD bn)
Bell CanadaBritish Columbia, Saskatchewan22.02,596.0110.6
Capital PowerAlberta0.01,245.013.6
MicrosoftOntario, Quebec40.0970.010.8
Beacon Data CentresAlberta0.0952.49.3
MetaAlberta0.0833.39.2
Synapse Data CenterAlberta0.0792.27.7
Red Jar Energy PartnersOntario0.0650.46.7
PrologisOntario0.0396.04.1
EverWindNova Scotia0.0331.88.0
HIVE DigitalNew Brunswick, Ontario, Quebec72.0246.22.3

Under construction: phases of 20 MW or more and their suppliers

Operators build 45 phases that add 3,809 MW. Of these, 25 are 20 MW or larger and together add 3,614 MW, 95% of the construction pipeline. Only 13 name a contractor. Suppliers can use the table below as a target list: phases with named firms show whom to approach, and phases with none recorded have no verified contractor named in DCI.

Phases of 20 MW IT or more under construction, with phase dates and recorded contractors.

Phases of 20 MW or more under construction, with recorded contractors.
PhaseCityExpected IT load (MW)Expected dateContractor recordedRole
Microsoft Etobicoke DCToronto250.0Q4 2026Syska Hennessy Group Inc.Engineering consultant (mechanical, electrical)
Bell Canada British Columbia DC3City not recorded175.02028TrueNorth Sustainable Infrastructure Inc.Development partner; role not confirmed
Microsoft Lévis DCLévis120.02029Pomerleau ConstructionGeneral contracting and Civil Engineering
Microsoft L'Ancienne-Lorette DCL'Ancienne-Lorette120.02027Construction Dinamo Inc.General Contracting & Construction Management

When is new data center capacity due in Canada?

IT load due by year (MW).

Expected Canadian IT capacity by year, construction and announced.
YearUnder construction, due (MW)Announced, target (MW)
20271,971.8776.7
2028648.71,349.5
2029524.11,049.8
2030—2,717.4
2031—242.4
2032—121.2

Construction more than doubles the market. If every construction date holds, Canada's operating IT load reaches 6,022 MW, 2.7 times today. Excluding Bell's Saskatchewan Building 2, construction still adds 2,824 MW, 128% of today's load.

Three things to watch

  • 01Q4 2026 handovers.

    13 phases totaling 664 MW fall due in Q4 2026, led by Microsoft's Etobicoke and YTO14 phases. Their handover sets GTA supply for 2027.

  • 02Bell Canada in Saskatchewan.

    Bell's Saskatchewan records hold 22% of Canada's pipeline. Changes to these phase sizes can affect the national total.

  • 03Alberta's announced campuses.

    Alberta's 3,744 MW of announced projects show no construction start in DCI. Construction starts will show how much becomes real.

Questions about data centers in Canada

  • 01

    How many data centers are in Canada?

    DCI tracks 353 data center records in Canada: 264 operating, 45 under construction, 35 announced, 8 planned, and 1 canceled. The operating records describe 218 physical buildings once DCI removes duplicates and tenant listings.

  • 02

    Which Canadian city has the most data centers?

    The Greater Toronto Area has the most records (98, 81 operating). Greater Montreal runs slightly more operating IT load: 731 MW versus 668 MW.

  • 03

    Who is the largest data center operator in Canada?

    By operating IT load, Vantage Data Centers Management Company, LLC leads with more than 170 MW recorded capacity. Equinix and Cologix run the most sites: 16 and 23, respectively.

  • 04

    Which Canadian data centers use liquid cooling?

    Among operating sites, DCI records direct liquid cooling at Bit Digital MTL3 in Montreal, hydro direct liquid cooling at DMG Blockchain Christina Lake and server-level water cooling at OVHcloud TOR1 in Cambridge.

  • 05

    Who is building Canada's new data centers?

    DCI records Syska Hennessy Group on Microsoft Etobicoke DC Campus, Bird Construction on eStruxture CAL-3, Pomerleau on Vantage QC24, Corgan and Global Design and Construction on Yondr TOR1, T5 Data Centers on Keel's Lager Phase 2, and TrueNorth Sustainable Infrastructure on Bell's British Columbia sites.

  • 06

    Does Data Center Intelligence offer a free trial?

    Yes. The DCI team starts with a 30-minute walkthrough tailored to your market, then opens a trial for your team.

Explore the full Canada data center list in DCI

DCI holds the full Canadian list with filters for province, city, operator, status, capacity, rack density, redundancy, tier type, contractor, and expected year. A demonstration walks through the facilities and projects that match your brief.

Scheduling takes two minutes. No commitment.