List of data centres in Australia by city, operator and project status

Australia has 3,492.0 MW of data center IT load today, and Data Center Intelligence tracks an additional 15,690.9 MW under construction or announced. This page sizes the market, maps the hotspots, sets out who builds colocation and cloud capacity, how density is changing, and lists the projects arriving next.

Published November 20, 2026

371
Projects tracked
3,492.0 MW
Operating IT load
15,690.9 MW
Pipeline IT load
267
Checked live buildings

Mordor Intelligence, Data Center Intelligence research team. DCI Australia records November 2026.

How many data centres are operating in Australia?

Data Center Intelligence (DCI) tracks 371 data center records in Australia from 117 operators. Of these, 272 are operating, 41 are under construction, 47 are announced, 8 are planned, and 3 have been canceled. DCI counts each building or construction phase once, and after it removes planned, canceled, unbuilt and duplicate entries, 267 checked buildings are live today.

Sydney carries the market.

Greater Sydney runs 1,817.6 MW, 52% of Australia's operating IT load. With Melbourne, it holds 79%.

The order book dwarfs the operating base.

The pipeline stands at 15,690.9 MW, about 4.5 times today's operating load, and half of it, 7,801.0 MW, sits outside the six largest metro areas.

Colocation leads, cloud builds for itself.

AirTrunk, CDC and NEXTDC combine large operating bases with large pipelines, while AWS, Microsoft and OVHcloud run 23% of operating load in their own buildings.

Density is rising fast.

The median operating site records 6 kW per rack, while the ten largest projects under construction plan 18 to 100 kW per rack.

Selected data centres in Australia
Operator, facility, city, IT load and status for a sample of DCI's 371 tracked Australian records.
Selected Australian data center projects by operator and city.
FacilityOperatorCityIT loadStatus
S1 Sydney Data CenterNEXTDCSydney16 MWCommissioned
AE1Equinix Inc.Adelaide0.67 MWCommissioned
EC1CDC Data Centres Pty Ltd (CDC)Sydney7 MWCommissioned
Sydney 01NineZero DC Management I Pty LtdSydney11 MWCommissioned
MEL1 - Building 1AirTrunk Operating Pty LtdMelbourne25 MWCommissioned

DCI holds the full Australian list with filters for city area, operator, status, capacity band, rack density, tier type and expected year.

Australian data center records by status.
Australian data center records by status, as of November 2026.
StatusRecordsIT load (MW)
Operating2723,492.0
Under Construction413,340.7
Announced4712,350.2
Planned8—
Cancelled3—
Total37119,182.9

Most sites are small. The operating base consists of small, older halls. The median operating site runs 2.0 MW, 191 of the 272 operating records sit below 10 MW, and the median recorded rack density is 6 kW.

Major hotspots: Sydney and Melbourne lead, power pulls the pipeline inland

Greater Sydney leads on every measure, with 1,817.6 MW operating and 5,233.3 MW more in the pipeline. Melbourne ranks second, with 929.3 MW running. Behind them the map changes: the Darling Downs in Queensland, Wagga Wagga in New South Wales and Port Augusta in South Australia each host large announced campuses with almost no live capacity.

City areas ranked by total operating and pipeline IT load (MW).
Top ten Australian city areas by operating, under-construction and announced IT load.
City areaProjectsOperatingUnder constructionAnnouncedTotal
Greater Sydney1151,817.62,333.42,899.97,050.9
Darling Downs (Qld)117.50.03,048.23,055.7
Greater Melbourne69929.3594.31,400.42,924.0
Wagga Wagga50.20.0853.3853.5
Murranji Station (NT)20.00.0823.2823.2
Port Augusta10.00.0813.0813.0
Greater Brisbane32337.519.6355.4712.5
Bundey (SA)10.00.0634.9634.9
Portland (Vic.)10.00.0439.0439.0
Newcastle–Hunter107.50.0428.6436.1

Power pulls projects inland. Half the pipeline, 7,801.0 MW, sits outside the six largest metro areas. Developers place these sites next to generation and transmission rather than in fiber-dense suburbs. Most remain announced rather than under construction, so their dates and sizes carry the most risk of change.

Where are the largest operating data centers?

The largest operating data centers are concentrated in Greater Sydney and Greater Melbourne. CDC's Brooklyn Campus One and NEXTDC's M3 Melbourne Data Centre lead at 150.0 MW each, followed by AirTrunk's SYD1 Sydney West at 130.0 MW. AWS operates three of the listed sites, with a combined IT load of 225.0 MW.

The largest operating data centers, ranked by IT load.
FacilityOperatorCity areaIT load (MW)Tier type recordedkW/rackOpened
Brooklyn Campus OneCDCGreater Melbourne150.0Tier 3202024
M3 Melbourne Data CentreNEXTDCGreater Melbourne150.0Tier 46.522022
SYD1 Sydney WestAirTrunkGreater Sydney130.0Tier 3122017
Western Sydney Data CentreNext CapitalGreater Sydney92.0Tier 2112011
S3 Sydney Data CenterNEXTDCGreater Sydney80.0Tier 47.412022
Amazon AWS SYD - William Dean CampusAWSGreater Sydney80.0Tier 38.52020
Amazon AWS SYD - 146 TurnerAWSGreater Sydney75.0Tier 310.52021
SYD2 Sydney NorthAirTrunkGreater Sydney70.0Tier 3122021
Amazon AWS SYD - 148 TurnerAWSGreater Sydney70.0Tier 3102020

Colocation, cloud and cooling in Australian data centers

Colocation operators carry the build

Four operators dominate the pipeline. AirTrunk, CDC and NEXTDC combine large operating bases with large pipelines, while Zerra DC holds 3,124.2 MW of announced load with nothing yet in operation. By number of sites, Equinix leads with 20 operating records, followed by NEXTDC and Vocus.

The ten largest operators by total operating and pipeline IT load (MW).
OperatorProjectsOperatingUnder constructionAnnouncedTotal
Zerra DC120.00.03,124.23,124.2
AirTrunk7225.0434.81,428.62,088.4
CDC22405.0347.0970.41,722.4
NEXTDC24419.1576.4550.01,545.5
Energy North20.00.0823.2823.2
1414 Degrees10.00.0813.0813.0
ISPT20.00.0730.8730.8
AWS14650.040.00.0690.0
GreenSquareDC30.00.0679.0679.0
IREN10.00.0634.9634.9

Cloud providers build their own capacity

AWS, Microsoft and OVHcloud run 20 operating records in DCI with 815.8 MW, 23% of Australia's operating IT load. Cloud providers have 5 more buildings with 300.0 MW under construction in Sydney and Melbourne, and Microsoft alone builds a combined 145.0 MW at Kemps Creek, due in 2026, and Seven Hills, due in 2030. Customers do not enter these buildings; they reach the clouds through connections inside colocation sites.

Future developments: the largest projects and when they arrive

Under construction

DCI tracks 34 phases of 20 MW or more under construction, with 3,269.9 MW of expected IT load, or 98% of all load under construction. STACK's SYD01 leads at 360.0 MW, followed by NEXTDC's S4 Sydney at 350.0 MW.

The ten largest projects under construction.
ProjectOperatorCity areaIT load (MW)kW/rackDue
SYD01STACKGreater Sydney360.01002028
S4 Sydney Data CenterNEXTDCGreater Sydney350.0502028
SYD3 Sydney WestAirTrunkGreater Sydney301.5402027
Maddington CampusCDCGreater Perth200.0702027
Project Blue Tongue (DC-01 and DC-02)EdgeConneXGreater Sydney160.0222029
M4 Melbourne Data CentreNEXTDCGreater Melbourne150.0402027
Macquarie Sydney DC1MacquarieGreater Sydney150.0182027
MEL1 - Building 2AirTrunkGreater Melbourne133.3702030
Project PlutoGoodmanGreater Sydney126.0222029
EdgeConneX Australia DC1EdgeConneXGreater Sydney100.0752027

Announced

Announced projects add 12,350.2 MW across 47 records. AirTrunk's Sydney DC4, at 1,000 MW, ranks as the largest single project in the country, and inland campuses at Port Augusta, Bundey, Portland and Murranji Station fill much of the rest of the list.

The ten largest announced projects.
ProjectOperatorCity areaIT load (MW)kW/rackTarget
Sydney DC4AirTrunkGreater Sydney1,000.0602029
Aurora AI Data Center Campus1414 DegreesPort Augusta813.0602029
IREN Bundey Data Center CampusIRENBundey (SA)634.9502028
Mamre Road Data Centre CampusISPTGreater Sydney600.0602029
S7 Sydney Data CenterNEXTDCGreater Sydney550.0802027
Portland Data Center CampusGreenSquareDCPortland (Vic.)439.0602029
Kurri Kurri Data CentreAirTrunkNewcastle–Hunter428.6502028
Project Ares Phase 2Energy NorthMurranji Station (NT)416.7752030
Project Ares Phase 1Energy NorthMurranji Station (NT)406.5602029
MBL1HyperDCMoorabool400.0752030

Which contractors are named on large data centre projects?

Of the 34 large phases under construction, 22 plan 30 kW per rack or more and 17 name at least one construction firm; 11 meet both tests. On these phases a cooling, electrical or fit-out supplier can already see who holds the work.

Large high-density phases under construction with a named contractor.
PhaseOperatorCity areaIT load (MW)kW/rackDueFirms named in DCI
S4 Sydney Data CenterNEXTDCGreater Sydney350.0502028Nilsen, TTW, WT Partnership
Maddington CampusCDCGreater Perth200.0702027FDC Construction & Fitout, Nilsen
M4 Melbourne Data CentreNEXTDCGreater Melbourne150.0402027Aurecon, Nilsen, WT Partnership
MEL1 - Building 2AirTrunkGreater Melbourne133.3702030FDC Construction & Fitout, Nilsen
EdgeConneX Australia DC1EdgeConneXGreater Sydney100.0752027FDC Construction & Fitout, Nilsen
Microsoft Kemps CreekMicrosoftGreater Sydney75.0302026A W Edwards
Microsoft Seven HillsMicrosoftGreater Sydney70.0302030DEM, Taylor Construction
S5 Sydney Data CenterNEXTDCGreater Sydney60.0702028Nilsen, WT Partnership
DOMA Australia DC1DOMAGreater Sydney49.2502028FDC Construction & Fitout, Greenbox Architecture, Nilsen
Intellicentre 3 (IC3 Super West)Macquarie Data CentresGreater Sydney47.0352026Linesight, Nilsen, SCEE Electrical
Apollo Place Data CentreEMKC CubedGreater Sydney37.5402030EMKC Cubed, Greenbox Architecture
Contractors named on projects under construction or announced, by usual role.
Contractors named on Australian data center projects, ranked by IT load, with usual role and largest phases.
FirmUsual rolePhases namedIT load (MW)Largest phases
NilsenElectrical contractor182,592.4Mamre Road Data Centre Campus, S7 Sydney, S4 Sydney
FDC Construction & FitoutMain builder and fit-out131,435.4Mamre Road Data Centre Campus, Maddington Campus, MEL1 - Building 2
GreenboxArchitect6306.6Perri Projects Melbourne DC1, Microsoft Woods Road, DOMA Australia DC1
LinesightProject and cost management4719.0Mamre Road Data Centre Campus, Intellicentre 3 (IC3 Super West), AWS Melbourne DC1 Building 2
WT PartnershipQuantity surveyor and cost consultant51,116.0S7 Sydney, S4 Sydney, M4 Melbourne Data Centre
ParamountMechanical and air-conditioning contractor3672.0Mamre Road Data Centre Campus, AWS Melbourne DC1 Building 2, Urbis Perth DC1
AureconEngineering consultant1150.0M4 Melbourne Data Centre
TTWStructural and civil engineer1350.0S4 Sydney
SCEEElectrical contractor147.0Intellicentre 3 (IC3 Super West)
CundallBuilding services engineer1160.0Project Blue Tongue (DC-01 and DC-02)

When the new capacity arrives

Australia added 789.8 MW in 2022, the biggest single year jump till date, but only 198.6 MW in 2024 and 118.3 MW in 2025. DCI dates projects under construction to add 150.0 MW in Q4 2026 and 1,282.3 MW in 2027.

IT load added or due by year (MW).
YearOpened (operating)Under construction, dueAnnounced, target
2019363.7——
2020287.2——
2021250.9——
2022789.8——
2023201.0——
2024198.6——
2025118.3——
2026 (Target Date)—150.0—
2027 (Target Date)—1,282.31,368.1
2028 (Target Date)—899.62,836.7
2029 (Target Date)—537.04,463.6
2030 (Target Date)—471.82,134.8
2031 (Target Date)——654.5
2032 (Target Date)——810.5
No Target Date——82.0

As of November 2026, the table illustrates the planned delivery timeline for data center developments, including completed, ongoing, and future projects. Future delivery years represent target completion dates and are subject to change.

2027 brings the step change. If every date holds, Australia's operating load passes 4,924.3 MW by the end of 2027, against 3,492.0 MW today. Announced projects then take over and peak at 4,463.6 MW in 2029.

Two things to watch

Q4 2026 and 2027 handovers.

Four phases totaling 150.0 MW fall due in Q4 2026, and 18 phases totaling 1,282.3 MW follow in 2027. Any slippage here moves every capacity forecast.

Inland announcements turning into construction.

Zerra DC, CDC's Wagga Wagga campus, 1414 Degrees at Port Augusta and Energy North in the Northern Territory hold most of the inland pipeline. Construction starts on these sites decide how much of the inland pipeline becomes real.

Questions about data centers in Australia

  • 01

    How many data centers are in Australia?

    DCI tracks 371 data center records in Australia: 272 operating, 41 under construction, 47 announced, 8 planned and 3 canceled. Of these, 267 are live buildings.

  • 02

    Which Australian city has the most data center capacity?

    Greater Sydney leads, with 1,817.6 MW of operating IT load across 83 operating records, ahead of Greater Melbourne with 929.3 MW.

  • 03

    How much capacity do cloud providers run in Australia?

    AWS, Microsoft and OVHcloud run 815.8 MW across 20 operating records, 23% of operating IT load, and build 300.0 MW more across 5 buildings in Sydney and Melbourne.

  • 04

    Which data centers support liquid cooling and 30 kW per rack?

    No operating site in DCI's records yet combines confirmed liquid cooling with a recorded average of 30 kW per rack or more. Among phases under construction, 22 of the 34 large phases plan 30 kW per rack or more.

  • 05

    Who is building Australia's new data centers?

    AirTrunk, CDC, NEXTDC and Zerra DC hold the largest pipelines. DCI most often names Nilsen and FDC Construction & Fitout on phases under construction or announced.

  • 06

    Does Data Center Intelligence offer a free trial?

    Yes. The DCI team starts with a 30-minute walkthrough tailored to your market, then opens a trial for your team.

Explore the Australian projects in DCI

DCI holds the full Australian list with filters for city area, operator, status, capacity band, rack density, tier type and expected year. A demonstration walks through the facilities and projects that match your market or supplier brief.

Scheduling takes two minutes. No commitment.