List of data centres in Australia by city, operator and project status
Australia has 3,492.0 MW of data center IT load today, and Data Center Intelligence tracks an additional 15,690.9 MW under construction or announced. This page sizes the market, maps the hotspots, sets out who builds colocation and cloud capacity, how density is changing, and lists the projects arriving next.
Published November 20, 2026
- 371
- Projects tracked
- 3,492.0 MW
- Operating IT load
- 15,690.9 MW
- Pipeline IT load
- 267
- Checked live buildings
Mordor Intelligence, Data Center Intelligence research team. DCI Australia records November 2026.
How many data centres are operating in Australia?
Data Center Intelligence (DCI) tracks 371 data center records in Australia from 117 operators. Of these, 272 are operating, 41 are under construction, 47 are announced, 8 are planned, and 3 have been canceled. DCI counts each building or construction phase once, and after it removes planned, canceled, unbuilt and duplicate entries, 267 checked buildings are live today.
Greater Sydney runs 1,817.6 MW, 52% of Australia's operating IT load. With Melbourne, it holds 79%.
The pipeline stands at 15,690.9 MW, about 4.5 times today's operating load, and half of it, 7,801.0 MW, sits outside the six largest metro areas.
AirTrunk, CDC and NEXTDC combine large operating bases with large pipelines, while AWS, Microsoft and OVHcloud run 23% of operating load in their own buildings.
The median operating site records 6 kW per rack, while the ten largest projects under construction plan 18 to 100 kW per rack.
| Facility | Operator | City | IT load | Status |
|---|---|---|---|---|
| S1 Sydney Data Center | NEXTDC | Sydney | 16 MW | Commissioned |
| AE1 | Equinix Inc. | Adelaide | 0.67 MW | Commissioned |
| EC1 | CDC Data Centres Pty Ltd (CDC) | Sydney | 7 MW | Commissioned |
| Sydney 01 | NineZero DC Management I Pty Ltd | Sydney | 11 MW | Commissioned |
| MEL1 - Building 1 | AirTrunk Operating Pty Ltd | Melbourne | 25 MW | Commissioned |
DCI holds the full Australian list with filters for city area, operator, status, capacity band, rack density, tier type and expected year.
| Status | Records | IT load (MW) |
|---|---|---|
| Operating | 272 | 3,492.0 |
| Under Construction | 41 | 3,340.7 |
| Announced | 47 | 12,350.2 |
| Planned | 8 | — |
| Cancelled | 3 | — |
| Total | 371 | 19,182.9 |
Most sites are small. The operating base consists of small, older halls. The median operating site runs 2.0 MW, 191 of the 272 operating records sit below 10 MW, and the median recorded rack density is 6 kW.
Major hotspots: Sydney and Melbourne lead, power pulls the pipeline inland
Greater Sydney leads on every measure, with 1,817.6 MW operating and 5,233.3 MW more in the pipeline. Melbourne ranks second, with 929.3 MW running. Behind them the map changes: the Darling Downs in Queensland, Wagga Wagga in New South Wales and Port Augusta in South Australia each host large announced campuses with almost no live capacity.
| City area | Projects | Operating | Under construction | Announced | Total |
|---|---|---|---|---|---|
| Greater Sydney | 115 | 1,817.6 | 2,333.4 | 2,899.9 | 7,050.9 |
| Darling Downs (Qld) | 11 | 7.5 | 0.0 | 3,048.2 | 3,055.7 |
| Greater Melbourne | 69 | 929.3 | 594.3 | 1,400.4 | 2,924.0 |
| Wagga Wagga | 5 | 0.2 | 0.0 | 853.3 | 853.5 |
| Murranji Station (NT) | 2 | 0.0 | 0.0 | 823.2 | 823.2 |
| Port Augusta | 1 | 0.0 | 0.0 | 813.0 | 813.0 |
| Greater Brisbane | 32 | 337.5 | 19.6 | 355.4 | 712.5 |
| Bundey (SA) | 1 | 0.0 | 0.0 | 634.9 | 634.9 |
| Portland (Vic.) | 1 | 0.0 | 0.0 | 439.0 | 439.0 |
| Newcastle–Hunter | 10 | 7.5 | 0.0 | 428.6 | 436.1 |
Power pulls projects inland. Half the pipeline, 7,801.0 MW, sits outside the six largest metro areas. Developers place these sites next to generation and transmission rather than in fiber-dense suburbs. Most remain announced rather than under construction, so their dates and sizes carry the most risk of change.
Where are the largest operating data centers?
The largest operating data centers are concentrated in Greater Sydney and Greater Melbourne. CDC's Brooklyn Campus One and NEXTDC's M3 Melbourne Data Centre lead at 150.0 MW each, followed by AirTrunk's SYD1 Sydney West at 130.0 MW. AWS operates three of the listed sites, with a combined IT load of 225.0 MW.
| Facility | Operator | City area | IT load (MW) | Tier type recorded | kW/rack | Opened |
|---|---|---|---|---|---|---|
| Brooklyn Campus One | CDC | Greater Melbourne | 150.0 | Tier 3 | 20 | 2024 |
| M3 Melbourne Data Centre | NEXTDC | Greater Melbourne | 150.0 | Tier 4 | 6.52 | 2022 |
| SYD1 Sydney West | AirTrunk | Greater Sydney | 130.0 | Tier 3 | 12 | 2017 |
| Western Sydney Data Centre | Next Capital | Greater Sydney | 92.0 | Tier 2 | 11 | 2011 |
| S3 Sydney Data Center | NEXTDC | Greater Sydney | 80.0 | Tier 4 | 7.41 | 2022 |
| Amazon AWS SYD - William Dean Campus | AWS | Greater Sydney | 80.0 | Tier 3 | 8.5 | 2020 |
| Amazon AWS SYD - 146 Turner | AWS | Greater Sydney | 75.0 | Tier 3 | 10.5 | 2021 |
| SYD2 Sydney North | AirTrunk | Greater Sydney | 70.0 | Tier 3 | 12 | 2021 |
| Amazon AWS SYD - 148 Turner | AWS | Greater Sydney | 70.0 | Tier 3 | 10 | 2020 |
Colocation, cloud and cooling in Australian data centers
Colocation operators carry the build
Four operators dominate the pipeline. AirTrunk, CDC and NEXTDC combine large operating bases with large pipelines, while Zerra DC holds 3,124.2 MW of announced load with nothing yet in operation. By number of sites, Equinix leads with 20 operating records, followed by NEXTDC and Vocus.
| Operator | Projects | Operating | Under construction | Announced | Total |
|---|---|---|---|---|---|
| Zerra DC | 12 | 0.0 | 0.0 | 3,124.2 | 3,124.2 |
| AirTrunk | 7 | 225.0 | 434.8 | 1,428.6 | 2,088.4 |
| CDC | 22 | 405.0 | 347.0 | 970.4 | 1,722.4 |
| NEXTDC | 24 | 419.1 | 576.4 | 550.0 | 1,545.5 |
| Energy North | 2 | 0.0 | 0.0 | 823.2 | 823.2 |
| 1414 Degrees | 1 | 0.0 | 0.0 | 813.0 | 813.0 |
| ISPT | 2 | 0.0 | 0.0 | 730.8 | 730.8 |
| AWS | 14 | 650.0 | 40.0 | 0.0 | 690.0 |
| GreenSquareDC | 3 | 0.0 | 0.0 | 679.0 | 679.0 |
| IREN | 1 | 0.0 | 0.0 | 634.9 | 634.9 |
Cloud providers build their own capacity
AWS, Microsoft and OVHcloud run 20 operating records in DCI with 815.8 MW, 23% of Australia's operating IT load. Cloud providers have 5 more buildings with 300.0 MW under construction in Sydney and Melbourne, and Microsoft alone builds a combined 145.0 MW at Kemps Creek, due in 2026, and Seven Hills, due in 2030. Customers do not enter these buildings; they reach the clouds through connections inside colocation sites.
Future developments: the largest projects and when they arrive
Under construction
DCI tracks 34 phases of 20 MW or more under construction, with 3,269.9 MW of expected IT load, or 98% of all load under construction. STACK's SYD01 leads at 360.0 MW, followed by NEXTDC's S4 Sydney at 350.0 MW.
| Project | Operator | City area | IT load (MW) | kW/rack | Due |
|---|---|---|---|---|---|
| SYD01 | STACK | Greater Sydney | 360.0 | 100 | 2028 |
| S4 Sydney Data Center | NEXTDC | Greater Sydney | 350.0 | 50 | 2028 |
| SYD3 Sydney West | AirTrunk | Greater Sydney | 301.5 | 40 | 2027 |
| Maddington Campus | CDC | Greater Perth | 200.0 | 70 | 2027 |
| Project Blue Tongue (DC-01 and DC-02) | EdgeConneX | Greater Sydney | 160.0 | 22 | 2029 |
| M4 Melbourne Data Centre | NEXTDC | Greater Melbourne | 150.0 | 40 | 2027 |
| Macquarie Sydney DC1 | Macquarie | Greater Sydney | 150.0 | 18 | 2027 |
| MEL1 - Building 2 | AirTrunk | Greater Melbourne | 133.3 | 70 | 2030 |
| Project Pluto | Goodman | Greater Sydney | 126.0 | 22 | 2029 |
| EdgeConneX Australia DC1 | EdgeConneX | Greater Sydney | 100.0 | 75 | 2027 |
Announced
Announced projects add 12,350.2 MW across 47 records. AirTrunk's Sydney DC4, at 1,000 MW, ranks as the largest single project in the country, and inland campuses at Port Augusta, Bundey, Portland and Murranji Station fill much of the rest of the list.
| Project | Operator | City area | IT load (MW) | kW/rack | Target |
|---|---|---|---|---|---|
| Sydney DC4 | AirTrunk | Greater Sydney | 1,000.0 | 60 | 2029 |
| Aurora AI Data Center Campus | 1414 Degrees | Port Augusta | 813.0 | 60 | 2029 |
| IREN Bundey Data Center Campus | IREN | Bundey (SA) | 634.9 | 50 | 2028 |
| Mamre Road Data Centre Campus | ISPT | Greater Sydney | 600.0 | 60 | 2029 |
| S7 Sydney Data Center | NEXTDC | Greater Sydney | 550.0 | 80 | 2027 |
| Portland Data Center Campus | GreenSquareDC | Portland (Vic.) | 439.0 | 60 | 2029 |
| Kurri Kurri Data Centre | AirTrunk | Newcastle–Hunter | 428.6 | 50 | 2028 |
| Project Ares Phase 2 | Energy North | Murranji Station (NT) | 416.7 | 75 | 2030 |
| Project Ares Phase 1 | Energy North | Murranji Station (NT) | 406.5 | 60 | 2029 |
| MBL1 | HyperDC | Moorabool | 400.0 | 75 | 2030 |
Which contractors are named on large data centre projects?
Of the 34 large phases under construction, 22 plan 30 kW per rack or more and 17 name at least one construction firm; 11 meet both tests. On these phases a cooling, electrical or fit-out supplier can already see who holds the work.
| Phase | Operator | City area | IT load (MW) | kW/rack | Due | Firms named in DCI |
|---|---|---|---|---|---|---|
| S4 Sydney Data Center | NEXTDC | Greater Sydney | 350.0 | 50 | 2028 | Nilsen, TTW, WT Partnership |
| Maddington Campus | CDC | Greater Perth | 200.0 | 70 | 2027 | FDC Construction & Fitout, Nilsen |
| M4 Melbourne Data Centre | NEXTDC | Greater Melbourne | 150.0 | 40 | 2027 | Aurecon, Nilsen, WT Partnership |
| MEL1 - Building 2 | AirTrunk | Greater Melbourne | 133.3 | 70 | 2030 | FDC Construction & Fitout, Nilsen |
| EdgeConneX Australia DC1 | EdgeConneX | Greater Sydney | 100.0 | 75 | 2027 | FDC Construction & Fitout, Nilsen |
| Microsoft Kemps Creek | Microsoft | Greater Sydney | 75.0 | 30 | 2026 | A W Edwards |
| Microsoft Seven Hills | Microsoft | Greater Sydney | 70.0 | 30 | 2030 | DEM, Taylor Construction |
| S5 Sydney Data Center | NEXTDC | Greater Sydney | 60.0 | 70 | 2028 | Nilsen, WT Partnership |
| DOMA Australia DC1 | DOMA | Greater Sydney | 49.2 | 50 | 2028 | FDC Construction & Fitout, Greenbox Architecture, Nilsen |
| Intellicentre 3 (IC3 Super West) | Macquarie Data Centres | Greater Sydney | 47.0 | 35 | 2026 | Linesight, Nilsen, SCEE Electrical |
| Apollo Place Data Centre | EMKC Cubed | Greater Sydney | 37.5 | 40 | 2030 | EMKC Cubed, Greenbox Architecture |
| Firm | Usual role | Phases named | IT load (MW) | Largest phases |
|---|---|---|---|---|
| Nilsen | Electrical contractor | 18 | 2,592.4 | Mamre Road Data Centre Campus, S7 Sydney, S4 Sydney |
| FDC Construction & Fitout | Main builder and fit-out | 13 | 1,435.4 | Mamre Road Data Centre Campus, Maddington Campus, MEL1 - Building 2 |
| Greenbox | Architect | 6 | 306.6 | Perri Projects Melbourne DC1, Microsoft Woods Road, DOMA Australia DC1 |
| Linesight | Project and cost management | 4 | 719.0 | Mamre Road Data Centre Campus, Intellicentre 3 (IC3 Super West), AWS Melbourne DC1 Building 2 |
| WT Partnership | Quantity surveyor and cost consultant | 5 | 1,116.0 | S7 Sydney, S4 Sydney, M4 Melbourne Data Centre |
| Paramount | Mechanical and air-conditioning contractor | 3 | 672.0 | Mamre Road Data Centre Campus, AWS Melbourne DC1 Building 2, Urbis Perth DC1 |
| Aurecon | Engineering consultant | 1 | 150.0 | M4 Melbourne Data Centre |
| TTW | Structural and civil engineer | 1 | 350.0 | S4 Sydney |
| SCEE | Electrical contractor | 1 | 47.0 | Intellicentre 3 (IC3 Super West) |
| Cundall | Building services engineer | 1 | 160.0 | Project Blue Tongue (DC-01 and DC-02) |
When the new capacity arrives
Australia added 789.8 MW in 2022, the biggest single year jump till date, but only 198.6 MW in 2024 and 118.3 MW in 2025. DCI dates projects under construction to add 150.0 MW in Q4 2026 and 1,282.3 MW in 2027.
| Year | Opened (operating) | Under construction, due | Announced, target |
|---|---|---|---|
| 2019 | 363.7 | — | — |
| 2020 | 287.2 | — | — |
| 2021 | 250.9 | — | — |
| 2022 | 789.8 | — | — |
| 2023 | 201.0 | — | — |
| 2024 | 198.6 | — | — |
| 2025 | 118.3 | — | — |
| 2026 (Target Date) | — | 150.0 | — |
| 2027 (Target Date) | — | 1,282.3 | 1,368.1 |
| 2028 (Target Date) | — | 899.6 | 2,836.7 |
| 2029 (Target Date) | — | 537.0 | 4,463.6 |
| 2030 (Target Date) | — | 471.8 | 2,134.8 |
| 2031 (Target Date) | — | — | 654.5 |
| 2032 (Target Date) | — | — | 810.5 |
| No Target Date | — | — | 82.0 |
As of November 2026, the table illustrates the planned delivery timeline for data center developments, including completed, ongoing, and future projects. Future delivery years represent target completion dates and are subject to change.
2027 brings the step change. If every date holds, Australia's operating load passes 4,924.3 MW by the end of 2027, against 3,492.0 MW today. Announced projects then take over and peak at 4,463.6 MW in 2029.
Two things to watch
Four phases totaling 150.0 MW fall due in Q4 2026, and 18 phases totaling 1,282.3 MW follow in 2027. Any slippage here moves every capacity forecast.
Zerra DC, CDC's Wagga Wagga campus, 1414 Degrees at Port Augusta and Energy North in the Northern Territory hold most of the inland pipeline. Construction starts on these sites decide how much of the inland pipeline becomes real.
Questions about data centers in Australia
01
How many data centers are in Australia?
DCI tracks 371 data center records in Australia: 272 operating, 41 under construction, 47 announced, 8 planned and 3 canceled. Of these, 267 are live buildings.
02
Which Australian city has the most data center capacity?
Greater Sydney leads, with 1,817.6 MW of operating IT load across 83 operating records, ahead of Greater Melbourne with 929.3 MW.
03
How much capacity do cloud providers run in Australia?
AWS, Microsoft and OVHcloud run 815.8 MW across 20 operating records, 23% of operating IT load, and build 300.0 MW more across 5 buildings in Sydney and Melbourne.
04
Which data centers support liquid cooling and 30 kW per rack?
No operating site in DCI's records yet combines confirmed liquid cooling with a recorded average of 30 kW per rack or more. Among phases under construction, 22 of the 34 large phases plan 30 kW per rack or more.
05
Who is building Australia's new data centers?
AirTrunk, CDC, NEXTDC and Zerra DC hold the largest pipelines. DCI most often names Nilsen and FDC Construction & Fitout on phases under construction or announced.
06
Does Data Center Intelligence offer a free trial?
Yes. The DCI team starts with a 30-minute walkthrough tailored to your market, then opens a trial for your team.
Explore the Australian projects in DCI
DCI holds the full Australian list with filters for city area, operator, status, capacity band, rack density, tier type and expected year. A demonstration walks through the facilities and projects that match your market or supplier brief.
Scheduling takes two minutes. No commitment.