Market Size of Taiwan Data Center Construction Industry
Study Period | 2019 - 2029 |
Base Year For Estimation | 2023 |
Forecast Data Period | 2024 - 2029 |
Historical Data Period | 2019 - 2022 |
CAGR | 7.03 % |
Market Concentration | Medium |
Major Players*Disclaimer: Major Players sorted in no particular order |
Need a report that reflects how COVID-19 has impacted this market and its growth?
Taiwan Data Center Construction Market Analysis
The Taiwan Data Center Market is projected to register a CAGR of 7.03% over the forecast period.
- Under Construction IT Load Capacity:The upcoming IT load capacity of the Taiwan data center construction market is expected to reach 304.2 MW by 2029.
- Under Construction Raised Floor Space: The country's construction of raised floor area is expected to increase 1.5 million sq.ft. by 2029.
- Planned Racks: The country's total number of racks to be installed is expected to reach 76,040 by 2029. Taipei is expected to house the maximum number of racks over the years.
- Planned Submarine Cables: There are close to 15 submarine cable systems connecting Taiwan, and many are under construction. One such submarine cable that is estimated to start service in 2024 is Apricot, which stretches over 11,972 Kilometers with landing points from Toucheng to Taiwan.