Market Size of Philippines Data Center Construction Industry
Study Period | 2019 - 2029 |
Base Year For Estimation | 2023 |
Forecast Data Period | 2024 - 2029 |
Historical Data Period | 2019 - 2022 |
CAGR | 14.49 % |
Market Concentration | Medium |
Major Players*Disclaimer: Major Players sorted in no particular order |
Need a report that reflects how COVID-19 has impacted this market and its growth?
Philippines Data Center Construction Market Analysis
The Philippines data center market is projected to register a CAGR of 14.49% during the forecast period.
- Under Construction IT Load Capacity: The upcoming IT load capacity of the Philippines data center construction market is expected to reach 954.2 MW by 2029.
- Under Construction Raised Floor Space: The country's construction of raised floor area is expected to increase by 5.3 million sq.ft. by 2029.
- Planned Racks: The country's total number of racks to be installed is expected to reach 266,405 units by 2029. NCR is expected to house the maximum number of racks by 2029.
- Planned Submarine Cables: There are close to 11 submarine cable systems connecting Philipines, and many are under construction. One such submarine cable that is estimated to start service in 2025 is Asia Link Cable (ALC), which stretches over 6000 Kilometers with landing points from Bauang to Philippines.