Market Size of France Data Center Construction Industry
Study Period | 2019 - 2029 |
Base Year For Estimation | 2023 |
Forecast Data Period | 2024 - 2029 |
Historical Data Period | 2019 - 2022 |
CAGR | 8.78 % |
Market Concentration | Medium |
Major Players*Disclaimer: Major Players sorted in no particular order |
Need a report that reflects how COVID-19 has impacted this market and its growth?
France Data Center Construction Market Analysis
The France data center construction market is projected to register a CAGR of 8.78%.
- The upcoming IT load capacity of the France data center construction market is expected to reach 1329.4 MW by 2029.
- The country's construction of raised floor area is expected to increase by 6.3 million sq. ft by 2029.
- The country's total number of racks to be installed is expected to reach 316,056 units by 2029. Paris (Ile-De-France) may house the maximum number of racks by 2029.
- There are close to 30 submarine cable systems connecting France, and many are under construction. One such submarine cable that was built in 2016 is C-Lion1, which stretches over 19200 Kilometers with landing points in Marseille, France.