Market Size of Israel Data Center Construction Industry
Study Period | 2024 - 2030 |
Base Year For Estimation | 2023 |
Market Size (2024) | USD 121.20 Million |
Market Size (2030) | USD 211.5 Million |
CAGR (2024 - 2030) | 9.65 % |
Market Concentration | Medium |
Major Players*Disclaimer: Major Players sorted in no particular order |
Need a report that reflects how COVID-19 has impacted this market and its growth?
Israel Data Center Construction Market Analysis
The Israel Data Center Construction Market size is estimated at USD 121.20 million in 2024, and is expected to reach USD 211.5 million by 2030, growing at a CAGR of 9.65% during the forecast period (2024-2030).
- Under Construction IT Load Capacity: The upcoming IT load capacity of the Israel data center construction market is expected to reach 277.2 MW in six years.
- Under Construction Raised Floor Space: The country's construction of raised floor area is expected to increase by 0.9 million sq. ft in six years.
- Planned Racks: The country's total number of racks to be installed is expected to reach 49,737 units in six years. Tel Aviv is expected to house the maximum number of racks in six years.
- Planned Submarine Cables: Close to four submarine cable systems connect Israel; many are under construction. One such submarine cable, estimated to be built by the end of next year, is Blue, which stretches over 4696 km with landing points in Tel Aviv.
Israel Data Center Construction Industry Segmentation
A data center is a physical room, building, or facility that holds IT infrastructure used to construct, run, and provide applications and services and store and manage the data connected with them. Under data center construction, we track the capital expenditure incurred while building the existing DC facilities and estimate the future capex based on upcoming DC facilities.
Israel Data Center Construction Market is segmented by infrastructure (electrical infrastructure (UPS systems, other electrical infrastructure), mechanical infrastructure (cooling systems, racks, other mechanical infrastructure), and other infrastructure), by end user (banking, financial services, and insurance, IT and telecommunications, government, healthcare, and other end users). The market sizes and forecasts are provided in terms of value in USD for all the above segments.
By Infrastructure | |||||
| |||||
| |||||
Other Infrastructures |
By End User | |
IT & Telecommunication | |
BFSI | |
Government | |
Healthcare | |
Other End Users |
Israel Data Center Construction Market Size Summary
The Israel Data Center Construction Market is poised for significant growth over the forecast period, driven by increasing demand for data center infrastructure. The market is characterized by a robust expansion in IT load capacity, raised floor space, and the number of racks, with Tel Aviv emerging as a central hub due to its technological advancements and proximity to essential resources. The region's strategic importance is further enhanced by its connection to multiple submarine cable systems, facilitating improved connectivity and supporting the burgeoning media, entertainment, and manufacturing sectors. These industries are increasingly adopting digitalization, which is expected to bolster the demand for data center services, particularly as 5G technology becomes more widespread.
The market landscape is fairly consolidated, with key players such as AECOM, Rittal GmbH & Co. KG, STULZ GMBH, Delta Electronics, and M+W Group (Exyte) leading the charge in data center construction and development. Recent strategic acquisitions, such as Berkshire Partners' stake in MedOne and EdgeConneX's acquisition of Global Data Center, highlight the ongoing consolidation and expansion efforts within the industry. These developments underscore the critical role of data centers in supporting Israel's digital infrastructure, catering to the increasing needs of government, telecom, and other sectors requiring minimal latency and robust connectivity solutions.
Israel Data Center Construction Market Size - Table of Contents
-
1. MARKET INSIGHTS
-
2. MARKET DYNAMICS
-
3. MARKET SEGMENTATION
-
3.1 By Infrastructure
-
3.1.1 Electrical Infrastructure
-
3.1.1.1 UPS Systems
-
3.1.1.2 Other Electrical Infrastructures
-
-
3.1.2 Mechanical Infrastructure
-
3.1.2.1 Cooling Systems
-
3.1.2.2 Racks
-
3.1.2.3 Other Mechanical Infrastructures
-
-
3.1.3 Other Infrastructures
-
-
3.2 By End User
-
3.2.1 IT & Telecommunication
-
3.2.2 BFSI
-
3.2.3 Government
-
3.2.4 Healthcare
-
3.2.5 Other End Users
-
-
Israel Data Center Construction Market Size FAQs
How big is the Israel Data Center Construction Market?
The Israel Data Center Construction Market size is expected to reach USD 121.20 million in 2024 and grow at a CAGR of 9.65% to reach USD 211.5 million by 2030.
What is the current Israel Data Center Construction Market size?
In 2024, the Israel Data Center Construction Market size is expected to reach USD 121.20 million.